JIZAN REFINERY & MARINE TERMINAL PROJECT (EPC-PACKAGE 14)
Rev.0 INSTRUMENT RFI ISUED SCHEDULE July 24 2019
Contractor
SN RFI No. QMIS No. SATIP Ref. SAIC Ref. LOCATION PLANT CODE DRAWING NO. SAUDI ARAMCO Inspection Level HENC PID PMT

HVAC
Visual Inspection of HVAC cable Glanding Dressing and Equipment
Final Termination from T02-HCP-0001 to T02-ACU- SATIP-J-
HENC-INST-7093 0001A, T02-ACU-0001B & T02-MGD-8001 at Jetty 902-01 SAIC-J- Room / Jetty
T02
T02-K-VA-
Jul 24, 2019 2:15PM H W
Shek
Ahamed Sant Jabbar
Observation Shelter - Berth 02 as per attached 6606 Observation 464397 Shadhik
(4.02) Shelter
highlighted cable schedule drawing
Berth 02

HVAC
Visual Inspection of HVAC cable Glanding Dressing and SATIP-J- Equipment
HENC-INST-7094
Final Termination from T01-HCP-0001 to T01-MGD-8001
902-01 SAIC-J- Room / Jetty
T01
T02-K-VA-
Jul 24, 2019 2:30PM H W
Shek
Ahamed Sant Jabbar
at Jetty Observation Shelter - Berth 01 as per attached 6606 Observation 464397 Shadhik
highlighted cable schedule drawing (4.02) Shelter
Berth 01

HVAC
Visual Inspection of HVAC cable continuity & Insulation
resistance (IR) testing from T02-HCP-0001 to T02-ACU- SATIP-J- Equipment
Room / Jetty T02-K-VA- Shek
HENC-INST-7095 0001A, T02-ACU-0001B & T02-MGD-8001 at Jetty 902-01 SATR-J-6602 Observation T02 Jul 24, 2019 3:00PM H W Ahamed Sant Jabbar
464397 Shadhik
Observation Shelter - Berth 02 as per attached (4.01) Shelter
highlighted cable schedule drawing
Berth 02

HVAC
Visual Inspection of HVAC cable continuity & Insulation Equipment
SATIP-J- Shek
HENC-INST-7096
resistance (IR) testing from T01-HCP-0001 to T01-MGD- 902-01 SATR-J-6602 Room / Jetty T01 T02-K-VA- Jul 24, 2019 3:30PM H W Ahamed Sant Jabbar
8001 at Jetty Observation Shelter - Berth 01 as per Observation 464397 Shadhik
attached highlighted cable schedule drawing (4.01) Shelter
Berth 01