BEMS POINT SCHEDULE & MCC LOAD DIAGRAM

Town Hotel Plant Room # 1, MCC-01

Starting Gear Rating


Control Cable Cores

Starting Gear Type


Analouge or Digital

Load Item Power


Compartment #

Cable Cores
Nr of Points

Cable Type

Cable Size

Load Item
Location
Device

[T-G-AH2-01] [T-G-AH2-01]
Duct RA temp. detector [AHU] 1 A 2 SD 30 2 12 4 5.5kW Supply fan
Duct RA Hum detector [AHU] 1 A 2 1 DOL 20 2 3 4 4.0kW Extract fan
Duct RA Air Quality Detector [AHU] 1 A 2
Duct LL temp detector [AHU] 1 A 2
Room temp. detector Room 1 A 2
Room hum detector Room 1 A 2
Mixing damper 1 [AHU] 1 A 3
Mixing damper 2 [AHU] 1 A 3
T-G-MCC-01

Mixing damper 3 [AHU] 1 A 3


Supply fan isolator [AHU] 1 D 2
Extract fan isolator [AHU] 1 D 2
Motorised Valve [AHU] 1 A 3
Motorised Valve [AHU] 1 A 3
Supply fan starter [MCC] 3 D 5
Extract fan starter [MCC] 3 D 5
Pre Filter DP switch [AHU] 1 D 2
Main Filter DP switch [AHU] 1 D 2

[T-G-PAH3-01] [T-G-PAH3-01]
Duct SA temp. detector [AHU] 1 A 2 SD 30 2 7 4 5.5kW Supply fan
Duct SA Hum. detector [AHU] 1 A 2 2 DOL 20 2 3 4 4.0kW Extract fan
Duct IA temp. detector [AHU] 1 A 2 DOL 2 2 3 1.5 0.2kW Heat Wheel
Duct IA Hum. detector [AHU] 1 A 2
Motorised damper 1 [AHU] 1 D 3
Motorises damper 2 [AHU] 1 D 3
Motorised Valve [AHU] 1 A 3
Motorised Valve [AHU] 1 A 3
Rotary wheel starter [MCC] 2 D 3
Supply fan starter [MCC] 3 D 5
Extract fan starter [MCC] 3 D 5
Supply fan isolator [AHU] 1 D 2
Exract fan isolator [AHU] 1 D 2
Rotary wheel isolator [AHU] 1 D 2
Pre Filter DP switch [AHU] 1 D 2
Main Filter DP switch [AHU] 1 D 2

[T-G-PAH3-02] [T-G-PAH3-02]
Duct SA temp. detector [AHU] 1 A 2 DOL 16 2 3 2.5 2.2kW Supply fan
Duct SA Hum. detector [AHU] 1 A 2 3 DOL 16 2 3 2.5 2.2kW Extract fan
Duct IA temp. detector [AHU] 1 A 2 DOL 2 2 3 1.5 0.2kW Heat Wheel
Duct IA Hum. detector [AHU] 1 A 2
Motorised damper 1 [AHU] 1 D 3
Motorises damper 2 [AHU] 1 D 3
Motorised Valve [AHU] 1 A 3
Motorised Valve [AHU] 1 A 3
Rotary wheel starter [MCC] 2 D 3
Supply fan starter [MCC] 3 D 5
Extract fan starter [MCC] 3 D 5
Supply fan isolator [AHU] 1 D 2
Exract fan isolator [AHU] 1 D 2
Rotary wheel isolator [AHU] 1 D 2
Pre Filter DP switch [AHU] 1 D 2
Main Filter DP switch [AHU] 1 D 2

[T-G-PAH2-01] [T-G-PAH2-01]
Duct SA temp. detector [AHU] 1 A 2 SD 30 2 12 4 5.5kW Supply fan 2 speed
Room temp. detector Room 1 A 2 4
Motorised damper 1 [AHU] 1 A 3
Motorised Valve [AHU] 1 A 3
Supply fan starter [MCC] 3 D 5

RE6309/D1368 Rev 0/2003 15910/1 BEMS Point Schedule + MCC Load Diagram
BEMS POINT SCHEDULE & MCC LOAD DIAGRAM
Town Hotel Plant Room # 1, MCC-01

Starting Gear Rating


Control Cable Cores

Starting Gear Type


Analouge or Digital

Load Item Power


Compartment #

Cable Cores
Nr of Points

Cable Type

Cable Size

Load Item
Location
Device

Supply fan isolator [AHU] 1 D 2


Pre Filter DP switch [AHU] 1 D 2
Main Filter DP switch [AHU] 1 D 2

[T-G-PAH2-02] [T-G-PAH2-02]

T-G-MCC-01 (contd)
Duct SA temp. detector [AHU] 1 A 2 SD 30 2 7 4 5.5kW Supply fan
Room temp. detector Room 1 A 2 4
Motorised damper 1 [AHU] 1 A 3
Motorised Valve [AHU] 1 A 3
Supply fan starter [MCC] 3 D 5
Supply fan isolator [AHU] 1 D 2
Pre Filter DP switch [AHU] 1 D 2
Main Filter DP switch [AHU] 1 D 2

[T-G-PAH2-03] [T-G-PAH2-03]
Duct SA temp. detector [AHU] 1 A 2 DOL 16 2 2.2kW Supply fan
Room temp. detector Room 1 A 2 6
Motorised damper 1 [AHU] 1 A 3
Motorised Valve [AHU] 1 A 3
Supply fan starter [MCC] 3 D 5
Supply fan isolator [AHU] 1 D 2
Pre Filter DP switch [AHU] 1 D 2
Main Filter DP switch [AHU] 1 D 2

[T-G-PAH1-01] [T-G-PAH1-01]
Motorised damper 1 [AHU] 1 D 3 DOL 16 2 3 2.5 2.3kW Supply fan
Supply fan starter [MCC] 3 D 5 7
Supply fan isolator [AHU] 1 D 2
Pre Filter DP switch [AHU] 1 D 2
Main Filter DP switch [AHU] 1 D 2

[T-G-SCS-01] [T-G-SCF-01]
Duct SA temp. detector [AHU] 1 A 2 DOL 10 2 3 1.5 1.1kW Supply fan
Motorised Valve [AHU] 1 A 3 8
Filter DP switch [AHU] 1 D 2
Supply fan starter [MCC] 2 D 3
Supply fan isolator [AHU] 1 D 2

[T-G-SCS-02]
Duct SA temp. detector [AHU] 1 A 2
Motorised Valve [AHU] 1 A 3

[Fire Alarm]
Fire Alarm Interface Unit, zone 1 MCC 1 D 2
Fire Alarm Interface Unit, zone 2 MCC 1 D 2
Fire Alarm Interface Unit, zone 3 MCC 1 D 2

[T-G-EF-02] [T-G-EF-02]
Supply fan starter [MCC] 3 D 5 DOL 2 3 1.5kW Extract Fan
Supply fan isolator [Field] 1 D 2 9

[T-G-EF-03]
[T-G-EF-03]
Supply fan starter [MCC] 3 D 5
DOL 2 3 1.5kW Extract Fan
Supply fan isolator [Field] 1 D 2
10

Room temp. detector Room 1 A 2

RE6309/D1368 Rev 0/2003 15910/2 BEMS Point Schedule + MCC Load Diagram
BEMS POINT SCHEDULE & MCC LOAD DIAGRAM
Town Hotel Plant Room #1 - MCC-02

Starting Gear Rating A

Load Item Power kW


Control Cable Cores

Starting Gear Type


Analouge or Digital

Compartment #

Cable Cores
Nr of Points

Cable Type

Cable Size

Load Item
Location
Device

[T-G-HWG-01] T-G-P-03
Immersion temp. detector Pipe 1 A 2 DOL 4 2 3 2.5 0.37kW Shunt pump
Motorised Valve Pipe 1 A 3 1
Pump Starter MCC 3 D 5
Pump isolator Field 1 D 2

T-G-MCC-02
[T-G-HWG-02] T-G-P-04
Immersion temp. detector Pipe 1 A 2 DOL 4 2 3 2.5 0.37kW Shunt pump
Motorised Valve Pipe 1 A 3 2
Pump Starter MCC 3 D 5
Pump isolator Field 1 D 2

[T-G-HWG-03] T-G-P-05
Immersion temp. detector Pipe 1 A 2 DOL 4 2 3 2.5 0.37kW Shunt pump
Motorised Valve Pipe 1 A 3 3
Pump Starter MCC 3 D 5
Pump isolator Field 1 D 2

[T-G-P-01] T-G-P-01
Pump Starter MCC 3 D 5 DOL 10 2 3 2.5 1.1kW HWS pump
Pump isolator Field 1 D 2 4

[T-G-CWG-01] T-G-P-02
Immersion temp. detector Pipe 1 A 2 DOL 6 2 3 2.5 0.75kW Shunt pump
5
ChW Motorised Valve Pipe 1 A 3
CCWS Motorised Valve Pipe 1 A 3
Pump Starter MCC 3 D 5
Pump isolator Field 1 D 2

[T-G-HP-01] T-G-P-06
HRChW temp inlet detector Pipe 1 A 2 DOL 16 2 3 4 2.2kW Shunt pump
HRChW temp outlet detector Pipe 1 A 2 6 T-G-P-08
HRLTHW temp inlet detector Pipe 1 A 2 DOL 25 2 3 6 4.5kW Shunt pump
HRLTHW temp outlet detector Pipe 1 A 2
Enable / disable HP 1 D 2
Common alarm HP 1 D 2
ChW shunt pump starter MCC 3 D 5
LTHW shunt pump starter MCC 3 D 5
HRChW shunt pump isolator Field 1 D 2
HRLTHW shunt pump isolator Field 1 D 2

[T-G-P-07(A,B)]
P-07A inverter enable / alarm / status MCC 4 D 5 T-G-P-07A
P-07A inverter speed control / feedback MCC 2 A 4 7 INV 100 2 4 35 25kW Pump
P-07B inverter enable / alarm / status MCC 4 D 5
P-07B inverter speed control / feedback MCC 2 A 4
P-07A Pressure Switch 1 Pipe 1 D 2
P-07A Pressure Switch 2 Pipe 1 D 2
P-07B Pressure Switch 1 Pipe 1 D 2
P-07B Pressure Switch 2 Pipe 1 D 2
P-07A isolator Field 1 D 2 T-G-P-07B
Standby
P-07B isolator Field 1 D 2 8 INV 100 2 4 35 25kW Pump
Diff pressure detector Field 1 A 2

RE6309/D1368 Rev 0/2003 15910/3 BEMS Point Schedule + MCC Load Diagram
BEMS POINT SCHEDULE & MCC LOAD DIAGRAM
Town Hotel Plant Room #1 - MCC-02

Starting Gear Rating A

Load Item Power kW


Control Cable Cores

Starting Gear Type


Analouge or Digital

Compartment #

Cable Cores
Nr of Points

Cable Type

Cable Size

Load Item
Location
Device

[T-G-P-09(A,B)]
P-09A inverter enable / alarm / status MCC 4 D 5 T-G-P-09A
P-09A inverter speed control / feedback MCC 2 A 4 9 INV 50 2 4 16 11kW Pump
P-09B inverter enable / alarm / stautus MCC 4 D 4
P-09B inverter speed control / feedback MCC 2 A 4
P-09A Pressure Switch 1 Pipe 1 D 2
P-09A Pressure Switch 2 Pipe 1 D 2
P-09B Pressure Switch 1 Pipe 1 D 2
P-09B Pressure Switch 2 Pipe 1 D 2
P-09A isolator Field 1 D 2 T-G-P-09B
P-09B isolator Field 1 D 2 10 INV 50 2 4 16 11kW Pump
Diff pressure detector Field 1 A 2

[Water Meters]
Main Kitchen Field 1 P 2
Bakery Field 1 P 2
Banquet Field 1 P 2

[FAN COIL UNITS]


FCU bus Interface unit (Ground) Room C 4
FCU bus Interface unit (First) Room C 4
T-G-MCC-02 (contd)

[Fire Alarm]
Fire Alarm Interface Unit, zone 1 MCC 1 D 2
Fire Alarm Interface Unit, zone 2 MCC 1 D 2
Fire Alarm Interface Unit, zone 3 MCC 1 D 2

[Sprinkler]
Sprinkler zone alarm LG - centre Field 1 D 2
Sprinkler zone alarm L1 - centre Field 1 D 2
Sprinkler zone alarm L2 - centre Field 1 D 2
Sprinkler zone alarm L3 - centre Field 1 D 2
Sprinkler zone alarm L4 - centre Field 1 D 2

LPG Gas Meter


Town Hotel Field 1 P 2

[LPG Gas Detection System]


Common alarm Field 1 D 2

[FM200 Systems]
Security room alarm Field 1 D 2
Computer room alarm Field 1 D 2

[Water Feature Entrance]


Activate water feature Field 1 D 2
Common alarm water feature Field 1 D 2

[Coldroom Equipment]
Monitoring system common alarm Field 1 D 2
Fridge condensing unit common alarm Field 1 D 2

Lift Monitoring System


Common Alarm Field 1 D 2

Sewage Pumping Station 3 (SPS-03)


Common alarm Field 1 D 2
High level alarm Field 1 D 2
Pump run monitoring Field 3 D 4

Sewage Pumping Station 4 (SPS-04)


Common alarm Field 1 D 2
High level alarm Field 1 D 2

RE6309/D1368 Rev 0/2003 15910/4 BEMS Point Schedule + MCC Load Diagram
Device

RE6309/D1368 Rev 0/2003


Pump run monitoring

Location
Field
3

Nr of Points
D

Analouge or Digital
4

Control Cable Cores

15910/5
Compartment #
Town Hotel Plant Room #1 - MCC-02

Starting Gear Type


BEMS POINT SCHEDULE & MCC LOAD DIAGRAM

Starting Gear Rating A

Cable Type

Cable Cores
Cable Size

Load Item Power kW

Load Item

BEMS Point Schedule + MCC Load Diagram


BEMS POINT SCHEDULE & MCC LOAD DIAGRAM
Town Hotel Plant Room #1 - MCC-02

Starting Gear Rating A

Load Item Power kW


Control Cable Cores

Starting Gear Type


Analouge or Digital

Compartment #

Cable Cores
Nr of Points

Cable Type

Cable Size

Load Item
Location
Device

Sump Pump Station (T-B1-P-01 A/B)


Common alarm Field 1 D 2
High level alarm Field 1 D 2
Pump run monitoring Field 2 D 3

Sump Pump Station (T-B1-P-02 A/B)


Common alarm Field 1 D 2
High level alarm Field 1 D 2
Pump run monitoring Field 2 D 3

Sump Pump Station (T-B1-P-03 A/B)


Common alarm Field 1 D 2
High level alarm Field 1 D 2
Pump run monitoring Field 2 D 3

Sump Pump Station (T-G-P-10 A/B/C)


Common alarm Field 1 D 2
High level alarm Field 1 D 2
Pump run monitoring Field 3 D 4

1. A = Analogue; D = Digital; C = Communication


2. Starters: DOL = Direct On Line; SD = Star/Delta; AT = Auto Transformer; Inv = Inverter
3 Cable Type :1 = Xlpe/Swa/LSF
4. Numbers of Points and control cable cores are given for guidance. Tenderer to review against written specified requirements and make due allowance for what is required

RE6309/D1368 Rev 0/2003 15910/6 BEMS Point Schedule + MCC Load Diagram
BEMS POINT SCHEDULE & MCC LOAD DIAGRAM
Town Hotel, Main Tank Room

Starting Gear Rating


Control Cable Cores

Starting Gear Type


Analouge or Digital

Load Item Power


Compartment #

Cable Cores
Nr of Points

Cable Type

Cable Type

Load Item
Location
Device

T-G-MCC-03
[T-G-BS-01] SF 4 33kW Booster Set
Booster Set enable BS 1 D 2 1 integral MCC
Booster set status BS 8 D 9
Booster set alarm BS 1 D 2
TSE Booster set isolator BS 1 D 2
High Level float switch 1 Tank 1 D 2
High Level float switch 2 Tank 1 D 2
Tank contents detector #1 Tank 1 A 2 DOL 4 5kW UV Steriliser
Tank contents detector #2 Tank 1 A 2 2 to be confirmed by W&WW specialist
Delivery pressure BS 1 A 2
UV steriliser enable Field 1 D 2
UV striliser alarm Field 1 D 2

[T-G-BS-02]
Booster Set enable BS 1 D 2 SF 4 45kW Booster Set
Booster set status BS 8 D 9 3 integral MCC
Booster set alarm BS 1 D 2
TSE Booster set isolator BS 1 D 2
High Level float switch 1 Tank 1 D 2
High Level float switch 2 Tank 1 D 2
Tank contents detector #1 Tank 1 A 2
Tank contents detector #2 Tank 1 A 2 DOL 4 5kW UV Steriliser
Delivery pressure BS 1 A 2 4 to be confirmed by W&WW specialist
UV steriliser enable Field 1 D 2
UV striliser alarm Field 1 D 2

1. A = Analogue; D = Digital; C = Communication


2. Starters: DOL = Direct On Line; SD = Star/Delta; AT = Auto Transformer; Inv = Inverter
3 Cable Type :1 = Xlpe/swa/LSF
4. Numbers of Points and control cable cores are given for guidance. Tenderer to review against written specified requirements and make due allowance for what is required

RE6309/D1368 Rev 0/2003 15910/7 BEMS Point Schedule + MCC Load Diagram
BEMS POINT SCHEDULE & MCC LOAD DIAGRAM
Town Hotel, Level 1 Plant Room # 1

Starting Gear Rating A

Load Item Power kW


Control Cable Cores

Starting Gear Type


Analouge or Digital

Compartment #

Cable Cores
Nr of Points

Cable Type

Cable Size

Load Item
Location
Device

[T-1-AH2-01] [T-1-AH2-01]

T-1-MCC-01
Duct RA temp. detector [AHU] 1 A 2 SD 30 2 7 6 5.5kW Supply fan
Duct RA Hum detector [AHU] 1 A 2 1
Duct RA Air Quality Detector [AHU] 1 A 2 DOL 16 2 3 4 2.2kW Extract fan
Duct LL temp detector [AHU] 1 A 2
Damper 1 [AHU] 1 A 3
Supply fan isolator [AHU] 1 D 2
Extract fan isolator [AHU] 1 D 2
Motorised Valve [AHU] 1 A 3
Motorised Valve [AHU] 1 A 3
Supply fan starter [MCC] 3 D 5
Extract fan starter [MCC] 3 D 5
Pre Filter DP switch [AHU] 1 D 2
Main Filter DP switch [AHU] 1 D 2

[T-1-AH2-02]
[T-1-AH2-02]
Duct RA temp. detector [AHU] 1 A 2 DOL 20 2 3 4 4.0kW Supply fan
Duct RA Hum detector [AHU] 1 A 2 2
Duct RA Air Quality Detector [AHU] 1 A 2 DOL 16 2 3 2.5 1.5kW Extract fan
Duct LL temp detector [AHU] 1 A 2
Damper 1 [AHU] 1 A 3
Damper 2 [AHU] 1 A 3
Supply fan isolator [AHU] 1 D 2
Extract fan isolator [AHU] 1 D 2
Motorised Valve [AHU] 1 A 3
Motorised Valve [AHU] 1 A 3
Supply fan starter [MCC] 3 D 5
Extract fan starter [MCC] 3 D 5
Pre Filter DP switch [AHU] 1 D 2
Main Filter DP switch [AHU] 1 D 2

[T-1-PAH2-01] [T-1-PAH2-01]
Duct SA temp. detector [AHU] 1 A 2 SD 35 2 12 10 7.5kW Supply fan 2 speed
Room temp. detector Room 1 A 2 3
Motorised damper 1 [AHU] 1 A 3
Motorised Valve [AHU] 1 A 3
Supply fan starter [MCC] 3 D 5
Supply fan isolator [AHU] 1 D 2
Pre Filter DP switch [AHU] 1 D 2
Main Filter DP switch [AHU] 1 D 2

[T-1-SCS-01] T-1-SCF-01
Duct SA temp. detector [AHU] 1 A 2 DOL 6 2 3 2.5 0.75kW Supply fan
Motorised Valve [AHU] 1 A 3 4
Filter DP switch [AHU] 1 D 2
Supply fan starter [MCC] 3 D 5
Supply fan isolator [AHU] 1 D 2

[T-1-SCS-02] T-1-SCF-02
Duct SA temp. detector [AHU] 1 A 2 DOL 6 2 3 2.5 0.55kW Supply fan
Motorised Valve [AHU] 1 A 3 5
Filter DP switch [AHU] 1 D 2
Supply fan starter [MCC] 3 D 5
Supply fan isolator [AHU] 1 D 2

RE6309/D1368 Rev 0/2003 15910/8 BEMS Point Schedule + MCC Load Diagram
BEMS POINT SCHEDULE & MCC LOAD DIAGRAM
Town Hotel, Level 1 Plant Room # 1

Starting Gear Rating A

Load Item Power kW


Control Cable Cores

Starting Gear Type


Analouge or Digital

Compartment #

Cable Cores
Nr of Points

Cable Type

Cable Size

Load Item
Location
Device

[T-1-PAH1-01] [T-1-PAH1-01]
Motorised damper 1 [AHU] 1 D 3 DOL 6 2 3 2.5 0.75kW Supply fan
Supply fan starter [MCC] 3 D 5 6
Supply fan isolator [AHU] 1 D 2
Pre Filter DP switch [AHU] 1 D 2
Main Filter DP switch [AHU] 1 D 2

[Fire Alarm]
Fire Alarm Interface Unit, zone 1 MCC 1 D 2

[LPG Gas Detection System]


Common alarm Field 1 D 2

[Coldroom Equipment]
Fridge condensing unit common alarm Field 1 D 2

1. A = Analogue; D = Digital; C = Communication


2. Starters: DOL = Direct On Line; SD = Star/Delta; AT = Auto Transformer; Inv = Inverter
3 Cable Type :1 = Xlpe/Swa/LSF
4. Numbers of Points and control cable cores are given for guidance. Tenderer to review against written specified requirements and make due allowance for what is required

RE6309/D1368 Rev 0/2003 15910/9 BEMS Point Schedule + MCC Load Diagram
BEMS POINT SCHEDULE & MCC LOAD DIAGRAM
Town Hotel, Level 2, Plant Room #1

Load Item Power Kw


Starting Gear Rating
Control Cable Cores

Starting Gear Type


Analouge or Digital

Compartment #

Cable Cores
Nr of Points

Cable Type

Cable Size

Load Item
Location
Device

T-2-AH2-01

T-2-MCC-01
Duct RA temp. detector [AHU] 1 A 2 SD 35 2 7 10 7.5kW Supply fan
Duct RA Hum detector [AHU] 1 A 2 1
Duct RA Air Quality Detector [AHU] 1 A 2 DOL 20 2 3 6 4.0kW Extract fan
Duct LL temp detector [AHU] 1 A 2
Mixing damper 1 [AHU] 1 A 3
Mixing damper 2 [AHU] 1 A 3
Mixing damper 3 [AHU] 1 A 3
Supply fan isolator Field 1 D 2
Extract fan isolator Field 1 D 2
Motorised Valve [AHU] 1 A 3
Motorised Valve [AHU] 1 A 3
Supply fan starter [MCC] 3 D 5
Extract fan starter [MCC] 3 D 5
Pre Filter DP switch [AHU] 1 D 2
Main Filter DP switch [AHU] 1 D 2

T-2-AH2-02
Duct RA temp. detector [AHU] 1 A 2 SD 35 2 7 10 7.5kW Supply fan
Duct RA Hum detector [AHU] 1 A 2 2
Duct RA Air Quality Detector [AHU] 1 A 2 DOL 20 21 3 6 4.0kW Extract fan
Duct LL temp detector [AHU] 1 A 2
Mixing damper 1 [AHU] 1 A 3
Mixing damper 2 [AHU] 1 A 3
Mixing damper 3 [AHU] 1 A 3
Supply fan isolator Field 1 D 2
Extract fan isolator Field 1 D 2
Motorised Valve [AHU] 1 A 3
Motorised Valve [AHU] 1 A 3
Supply fan starter [MCC] 3 D 5
Extract fan starter [MCC] 3 D 5
Pre Filter DP switch [AHU] 1 D 2
Main Filter DP switch [AHU] 1 D 2

T-2-AH2-07
Duct RA temp. detector [AHU] 1 A 2 SD 30 6 5.5kW Supply fan
Duct RA Hum detector [AHU] 1 A 2 3
Duct RA Air Quality Detector [AHU] 1 A 2 DOL 20 2 3 4 3.0kW Extract fan
Duct LL temp detector [AHU] 1 A 2
Mixing damper 1 [AHU] 1 A 3
Mixing damper 2 [AHU] 1 A 3
Mixing damper 3 [AHU] 1 A 3
Supply fan isolator Field 1 D 2
Extract fan isolator Field 1 D 2
Motorised Valve [AHU] 1 A 3
Motorised Valve [AHU] 1 A 3
Supply fan starter [MCC] 3 D 5
Extract fan starter [MCC] 3 D 5
Pre Filter DP switch [AHU] 1 D 2
Main Filter DP switch [AHU] 1 D 2

[Piazza Water Feature]


Activate water feature MCC 1 D 2
Common alarm water feature MCC 1 D 2

[Fire Alarm]
Fire Alarm Interface Unit, zone 1 MCC 1 D 2

1. A = Analogue; D = Digital; C = Communication


2. Starters: DOL = Direct On Line; SD = Star/Delta; AT = Auto Transformer; Inv = Inverter
3 Cable Type : 3 Cable Type :1 = Xlpe/Swa/LSF
4. Numbers of Points and control cable cores are given for guidance. Tenderer to review against written specified requirements and make due allowance for what is required

RE6309/D1368 Rev 0/2003 15910/10 BEMS Point Schedule + MCC Load Diagram
BEMS POINT SCHEDULE & MCC LOAD DIAGRAM
Town Hotel, Level 2, Plant Room #2

Starting Gear Type A

Load Item Power kW


Starting Gear Rating
Control Cable Cores
Analouge or Digital

Compartment #

Cable Cores
Nr of Points

Cable Type

Cable Size

Load Item
Location
Device

T-2-AH2-03
Duct RA temp. detector [AHU] 1 A 2 SD 50 2 7 16 11kW Supply fan
Duct RA Hum detector [AHU] 1 A 2 1
uct RA Air Quality Detector [AHU] 1 A 2 SD 35 2 7 6 7.5kW Extract fan
Duct LL temp detector [AHU] 1 A 2

T-2-MCC-02
Mixing damper 1 [AHU] 1 A 3
Mixing damper 2 [AHU] 1 A 3
Mixing damper 3 [AHU] 1 A 3
Supply fan isolator Field 1 D 2
Extract fan isolator Field 1 D 2
Motorised Valve [AHU] 1 A 3
Motorised Valve [AHU] 1 A 3
Supply fan starter [MCC] 3 D 5
Extract fan starter [MCC] 3 D 5
Pre Filter DP switch [AHU] 1 D 2
Main Filter DP switch [AHU] 1 D 2

T-2-AH2-04
Duct RA temp. detector [AHU] 1 A 2 SD 35 2 7 6 7.5kW Supply fan
Duct RA Hum detector [AHU] 1 A 2 2
uct RA Air Quality Detector [AHU] 1 A 2 DOL 20 2 3 4 4.0kW Extract fan
Duct LL temp detector [AHU] 1 A 2
Mixing damper 1 [AHU] 1 A 3
Mixing damper 2 [AHU] 1 A 3
Mixing damper 3 [AHU] 1 A 3
Supply fan isolator Field 1 D 2
Extract fan isolator Field 1 D 2
Motorised Valve [AHU] 1 A 3
Motorised Valve [AHU] 1 A 3
Supply fan starter [MCC] 3 D 5
Extract fan starter [MCC] 3 D 5
Pre Filter DP switch [AHU] 1 D 2
Main Filter DP switch [AHU] 1 D 2

[T-2-AH2-06]
Duct RA temp. detector [AHU] 1 A 2
SD 30 2 7 6 5.5kW Supply fan
Duct RA Hum detector [AHU] 1 A 2
3
uct RA Air Quality Detector [AHU] 1 A 2
DOL 20 2 3 4 3.0kW Extract fan
Duct LL temp detector [AHU] 1 A 2
Damper 1 [AHU] 1 A 3
Damper 2 [AHU] 1 A 3
Supply fan isolator [AHU] 1 D 2
Extract fan isolator [AHU] 1 D 2
Motorised Valve [AHU] 1 A 3
Motorised Valve [AHU] 1 A 3
Supply fan starter [MCC] 3 D 5
Extract fan starter [MCC] 3 D 5
Pre Filter DP switch [AHU] 1 D 2
Main Filter DP switch [AHU] 1 D 2

[Fire Alarm]
larm Interface Unit, zone 1 MCC 1 D 2

1. A = Analogue; D = Digital; C = Communication


2. Starters: DOL = Direct On Line; SD = Star/Delta; AT = Auto Transformer; Inv = Inverter
3 Cable Type :1 = Xlpe/Swa/LSF

4. Numbers of Points and control cable cores are given for guidance. Tenderer to review against written specified requirements and make due allowance for what is required

RE6309/D1368 Rev 0/2003 15910/11 BEMS Point Schedule + MCC Load Diagram
BEMS POINT SCHEDULE & MCC LOAD DIAGRAM
Town Hotel, Level 2, Plant Room #3

Starting Gear Rating A

Load Item Power kW


Control Cable Cores

Starting Gear Type


Analouge or Digital

Compartment #

Cable Cores
Nr of Points

Cable Type

Cable Size

Load Item
Location
Device

T-2-AH2-05

T-2-MCC-03
Duct RA temp. detector [AHU] 1 A 2 SD 20 2 7 4 4.0kW Supply fan
Duct RA Hum detector [AHU] 1 A 2 1
Duct RA Air Quality Detector [AHU] 1 A 2 DOL 16 2 3 2.5 2.2kW Extract fan
Duct LL temp detector [AHU] 1 A 2
Mixing damper 1 [AHU] 1 A 3
Mixing damper 2 [AHU] 1 A 3
Mixing damper 3 [AHU] 1 A 3
Supply fan isolator Field 1 D 2
Extract fan isolator Field 1 D 2
Motorised Valve [AHU] 1 D 3
Motorised Valve [AHU] 1 D 3
Supply fan starter [MCC] 3 D 5
Extract fan starter [MCC] 3 D 5
Pre Filter DP switch [AHU] 1 D 2
Main Filter DP switch [AHU] 1 D 2

[T-2-PAH3-01]
Duct SA temp. detector [AHU] 1 A 2 DOL 16 2 3 2.5 2.5kW Supply fan
Duct SA Hum. detector [AHU] 1 A 2 2 DOL 16 2 3 2.5 1.5kW Extract fan
Duct IA temp. detector [AHU] 1 A 2 DOL 2 2 3 1.5 0.2kW Heat Wheel
Duct IA Hum. detector [AHU] 1 A 2
Motorised damper 1 [AHU] 1 D 3
Motorises damper 2 [AHU] 1 D 3
Motorised Valve [AHU] 1 A 3
Motorised Valve [AHU] 1 A 3
Rotary wheel starter [MCC] 2 D 3
Supply fan starter [MCC] 3 D 5
Extract fan starter [MCC] 3 D 5
Supply fan isolator [AHU] 1 D 2
Exract fan isolator [AHU] 1 D 2
Rotary wheel isolator [AHU] 1 D 2
Pre Filter DP switch [AHU] 1 D 2
Main Filter DP switch [AHU] 1 D 2

[Fire Alarm]
Fire Alarm Interface Unit, zone 1 MCC 1 D 2

1. A = Analogue; D = Digital; C = Communication


2. Starters: DOL = Direct On Line; SD = Star/Delta; AT = Auto Transformer; Inv = Inverter
3 Cable Type : 1 Xlpe/Swa/Pvc
4. Numbers of Points and control cable cores are given for guidance. Tenderer to review against written specified requirements and make due allowance for what is required

RE6309/D1368 Rev 0/2003 15910/12 BEMS Point Schedule + MCC Load Diagram
BEMS POINT SCHEDULE & MCC LOAD DIAGRAM
Town Hotel, Level 3, Plant Room #1

Starting Gear Rating A

Load Item Power kW


Control Cable Cores

Starting Gear Type


Analouge or Digital

Compartment #

Cable Cores
Nr of Points

Cable Type

Cable Size

Load Item
Location
Device

T-3-AH2-01

T-3-MCC-01
Duct RA temp. detector [AHU] 1 A 2 DOL 20 2 3 4 4.0kW Supply fan
Duct RA Hum detector [AHU] 1 A 2 1
Duct RA Air Quality Detector [AHU] 1 A 2 DOL 20 2 3 2.5 3.0kW Extract fan
Duct LL temp detector [AHU] 1 A 2
Mixing damper 1 [AHU] 1 A 3
Mixing damper 2 [AHU] 1 A 3
Mixing damper 3 [AHU] 1 A 3
Supply fan isolator Field 1 D 2
Extract fan isolator Field 1 D 2
Motorised Valve [AHU] 1 D 3
Motorised Valve [AHU] 1 D 3
Supply fan starter [MCC] 3 D 5
Extract fan starter [MCC] 3 D 5
Pre Filter DP switch [AHU] 1 D 2
Main Filter DP switch [AHU] 1 D 2

[T-3-AH2-02]
Duct RA temp. detector [AHU] 1 A 2 SD 35 2 7 6 7.5kW Supply fan
Duct RA Hum detector [AHU] 1 A 2 2
Duct RA Air Quality Detector [AHU] 1 A 2 DOL 20 2 3 2.5 4.0kW Extract fan
Duct LL temp detector [AHU] 1 A 2
Damper 1 [AHU] 1 A 3
Damper 2 [AHU] 1 A 3
Supply fan isolator [AHU] 1 D 2
Extract fan isolator [AHU] 1 D 2
Motorised Valve [AHU] 1 D 3
Motorised Valve [AHU] 1 D 3
Supply fan starter [MCC] 3 D 5
Extract fan starter [MCC] 3 D 5
Pre Filter DP switch [AHU] 1 D 2
Main Filter DP switch [AHU] 1 D 2

T-3-AH2-03
Duct RA temp. detector [AHU] 1 A 2 INV 35 2 6 6 7.5kW Supply fan
Duct RA Hum detector [AHU] 1 A 2 3
Duct RA Air Quality Detector room #1 [AHU] 1 A 2 INV 30 2 6 6 5.5kW Extract fan
Duct RA Air Quality Detector room #2 [AHU] 1 A 2
Duct RA Air Quality Detector room #3 [AHU] 1 A 2
Duct RA Air Quality Detector room #4 [AHU] 1 A 2
Duct RA Air Quality Detector room #5 [AHU] 1 A 2
Duct RA Air Quality Detector room #6 [AHU] 1 A 2
Duct LL temp detector [AHU] 1 A 2
Mixing damper 1 [AHU] 1 A 3
Mixing damper 2 [AHU] 1 A 3
Mixing damper 3 [AHU] 1 A 3
Supply fan isolator Field 1 D 2
Extract fan isolator Field 1 D 2
Motorised Valve [AHU] 1 D 3
Motorised Valve [AHU] 1 D 3
Supply fan inverter, control / feedback [MCC] 2 A 4
Extract fan inverter, control / feedback [MCC] 2 A 4
Supply fan Inverter, enable / alarm / status [MCC] 4 D 5
Extract fan Inverter, enable / alarm / status [MCC] 4 D 5
Pre Filter DP switch [AHU] 1 D 2
Main Filter DP switch [AHU] 1 D 2

T-3-KEF-01
Extract fan starter [MCC] 3 D 5 SD 35 2 7 6 7.5kW Extract fan
Electrostatic Filter enable Field 1 D 2 3
Electrostatic filter alarm Field 1 D 2 DOL 15 2 4 2.5 1kW Electrostatic filter
Extract fan isolator Field 1 D 2
Electrostatic filter isolator Field 1 D 2

RE6309/D1368 Rev 0/2003 15910/13 BEMS Point Schedule + MCC Load Diagram
BEMS POINT SCHEDULE & MCC LOAD DIAGRAM
Town Hotel, Level 3, Plant Room #1

Starting Gear Rating A

Load Item Power kW


Control Cable Cores

Starting Gear Type


Analouge or Digital

Compartment #

Cable Cores
Nr of Points

Cable Type

Cable Size

Load Item
Location
Device

T-3-KEF-02
Extract fan starter [MCC] 3 D 5 SD 35 2 7 6 7.5kW Extract fan
Electrostatic Filter enable Field 1 D 2 4
Electrostatic filter alarm Field 1 D 2 DOL 15 2 4 2.5 1kW Electrostatic filter
Extract fan isolator Field 1 D 2
Electrostatic filter isolator Field 1 D 2

T-3-KEF-03

T-3-MCC-01 cont…
Extract fan starter [MCC] 3 D 5 SD 35 2 7 6 7.5kW Extract fan
Electrostatic Filter enable Field 1 D 2 5
Electrostatic filter alarm Field 1 D 2 DOL 15 2 4 2.5 1kW Electrostatic filter
Extract fan isolator Field 1 D 2
Electrostatic filter isolator Field 1 D 2

T-3-KEF-04
Extract fan starter [MCC] 3 D 5 DOL 20 2 3 2.5 3.0kW Extract fan
Electrostatic Filter enable Field 1 D 2 6
Electrostatic filter alarm Field 1 D 2 DOL 15 2 4 2.5 1kW Electrostatic filter
Extract fan isolator Field 1 D 2
Electrostatic filter isolator Field 1 D 2

T-3-KEF-05
Extract fan starter [MCC] 3 D 5
DOL 20 2 3 2.5 3.0kW Extract fan
Electrostatic Filter enable Field 1 D 2
7
Electrostatic filter alarm Field 1 D 2
DOL 15 2 4 2.5 1kW Electrostatic filter
Extract fan isolator Field 1 D 2
Electrostatic filter isolator Field 1 D 2

T-3-KEF-06
Extract fan starter [MCC] 3 D 5 DOL 10 2 3 1.5 1.1kW Extract fan
Extract fan isolator Field 1 D 2 8

T-3-KEF-07
Extract fan starter [MCC] 3 D 5 DOL 10 2 3 1.5 1.1kW Extract fan
Extract fan isolator Field 1 D 2 9

[Fire Alarm]
Fire Alarm Interface Unit, zone 1 MCC 1 D 2
Fire Alarm Interface Unit, zone 2 MCC 1 D 2

1. A = Analogue; D = Digital; C = Communication


2. Starters: DOL = Direct On Line; SD = Star/Delta; AT = Auto Transformer; Inv = Inverter
3 Cable Type :1 = Xlpe/Swa/LSF
4. Numbers of Points and control cable cores are given for guidance. Tenderer to review against written specified requirements and make due allowance for what is required

RE6309/D1368 Rev 0/2003 15910/14 BEMS Point Schedule + MCC Load Diagram
BEMS POINT SCHEDULE & MCC LOAD DIAGRAM
Town Hotel, Zone 6, Level 3, Plantroom #2

Starting Gear Rating


Control Cable Cores

Starting Gear Type


Analouge or Digital

Load Item Power


Compartment #

Cable Cores
Cable Type

Cable size

Load Item
Location
Device

Cable
[T-3-PAH3-01]
Duct SA temp. detector [AHU] 1 A 2 DOL 15 2 3 2.5 1.5kW Supply fan

T-3-MCC-02
Duct SA Hum. detector [AHU] 1 A 2 1
Duct IA temp. detector [AHU] 1 A 2 DOL 15 2 3 2.5 1.1kW Extract fan
Duct IA Hum. detector [AHU] 1 A 2
Motorised Valve [AHU] 1 A 3
Motorised Valve [AHU] 1 A 3
Rotary wheel starter [MCC] 2 D 3
Supply fan starter [MCC] 3 D 5
Extract fan starter [MCC] 3 D 5
Supply fan isolator [AHU] 1 D 2
Exract fan isolator [AHU] 1 D 2
Rotary wheel isolator [AHU] 1 D 2
Pre Filter DP switch [AHU] 1 D 2
Main Filter DP switch [AHU] 1 D 2

T-3-KEF-08
Extract fan starter [MCC] 3 D 5 SD 20 2 7 2.5 9kW Extract fan
Electrostatic Filter enable Field 1 D 2 2
Electrostatic filter alarm Field 1 D 2 DOL 15 2 4 2.5 1kW Electrostatic filter
Extract fan isolator Field 1 D 2
Electrostatic filter isolator Field 1 D 2

T-3-KEF-09
Extract fan starter [MCC] 3 D 5 SD 20 2 7 2.5 9kW Extract fan
Electrostatic Filter enable Field 1 D 2 3
Electrostatic filter alarm Field 1 D 2 DOL 15 2 4 2.5 1kW Electrostatic filter
Extract fan isolator Field 1 D 2
Electrostatic filter isolator Field 1 D 2

T-3-KEF-10
Extract fan starter [MCC] 3 D 5 DOL 6 2 3 1.5 0.55kW Extract fan
Extract fan isolator Field 1 D 2 4

[Fire Alarm]
Fire Alarm Interface Unit, zone 1 MCC 1 D 2
Fire Alarm Interface Unit, zone 2 MCC 1 D 2

1. A = Analogue; D = Digital; C = Communication


2. Starters: DOL = Direct On Line; SD = Star/Delta; AT = Auto Transformer; Inv = Inverter
3 Cable Type :1 = Xlpe/Swa/LSF
4. Numbers of Points and control cable cores are given for guidance. Tenderer to review against written specified requirements and make due allowance for what is required

RE6309/D1368 Rev 0/2003 15910/15 BEMS Point Schedule + MCC Load Diagram
BEMS POINT SCHEDULE & MCC LOAD DIAGRAM
Town Hotel, Level 4, Plant Room #1

Starting Gear Rating A


Control Cable Cores
Analouge or Digital

Starting Gear Type

Load Item Power


Compartment #

Cable Cores
Nr of Points

Cable Type

Cable Size

Load Item
Location
Device

[T-4-AH2-01]
Duct RA temp. detector [AHU] 1 A 2
Duct RA Hum detector [AHU] 1 A 2 SD 35 2 7 6 7.5kW Supply fan
Duct RA Air Quality Detector [AHU] 1 A 2 1
Duct LL temp detector [AHU] 1 A 2 DOL 20 2 3 4 4.0kW Extract fan
Mixing damper 1 [AHU] 1 A 3
Mixing damper 2 [AHU] 1 A 3
Mixing damper 3 [AHU] 1 A 3
Supply fan isolator Field 1 D 2
Extract fan isolator Field 1 D 2
Motorised Valve [AHU] 1 D 3
Motorised Valve [AHU] 1 D 3
Supply fan starter [MCC] 3 D 5
Extract fan starter [MCC] 3 D 5
Pre Filter DP switch [AHU] 1 D 2
Main Filter DP switch [AHU] 1 D 2

[T-4-PAH3-01]
Duct SA temp. detector [AHU] 1 A 2 DOL 10 2 3 1.5 1.1kW Supply fan
Duct SA Hum. detector [AHU] 1 A 2 2
Duct IA temp. detector [AHU] 1 A 2 DOL 6 2 3 1.5 0.55kW Extract fan
Duct IA Hum. detector [AHU] 1 A 2
Motorised damper 1 [AHU] 1 D 3
Motorises damper 2 [AHU] 1 D 3
Motorised Valve [AHU] 1 A 3
Motorised Valve [AHU] 1 A 3
Rotary wheel starter [MCC] 2 D 3
Supply fan starter [MCC] 3 D 5
Extract fan starter [MCC] 3 D 5
Supply fan isolator [AHU] 1 D 2
Exract fan isolator [AHU] 1 D 2
Rotary wheel isolator [AHU] 1 D 2
Pre Filter DP switch [AHU] 1 D 2
Main Filter DP switch [AHU] 1 D 2

[FAN COIL UNITS]


FCU bus Interface unit (LG, L2, L3) Room C 4

[Fire Alarm]
Fire Alarm Interface Unit, zone 1 MCC 1 D 2

1. A = Analogue; D = Digital; C = Communication


2. Starters: DOL = Direct On Line; SD = Star/Delta; AT = Auto Transformer; Inv = Inverter
3 Cable Type :1 = Xlpe/Swa/LSF
4. Numbers of Points and control cable cores are given for guidance. Tenderer to review against written specified requirements and make due allowance for what is required

RE6309/D1368 Rev 0/2003 15910/16 BEMS Point Schedule + MCC Load Diagram
BEMS POINT SCHEDULE & MCC LOAD DIAGRAM
Town Hotel, Level 5 Plant Room 1, Zone 2 East

Load Item Power kW


Starting Gear Rating
Control Cable Cores

Starting Gear Type


Analouge or Digital

Compartment #

Cable Cores
Nr of Points

Cable Type

Cable Size

Load Item
Location
Device

[T-5-PAH3-01] DOL 25 3 3.0kW Supply fan


Duct SA temp. detector [AHU] 1 A 2 1 DOL 15 3 1.5kW Rotary Wheel
Duct SA Hum. detector [AHU] 1 A 2 DOL 2 3 0.2kW Extract fan
Duct IA temp. detector [AHU] 1 A 2

T-5-MCC-01
Duct IA Hum. detector [AHU] 1 A 2
Motorised Valve [AHU] 1 A 3
Motorised Valve [AHU] 1 A 3
Rotary wheel starter [MCC] 2 D 3
Supply fan starter [MCC] 3 D 5
Extract fan starter [MCC] 3 D 5
Supply fan isolator [AHU] 1 D 2
Exract fan isolator [AHU] 1 D 2
Rotary wheel isolator [AHU] 1 D 2
Pre Filter DP switch [AHU] 1 D 2
Main Filter DP switch [AHU] 1 D 2

[Fire Alarm]
Fire Alarm Interface Unit, zone 1 MCC 1 D 2

1. A = Analogue; D = Digital; C = Communication


2. Starters: DOL = Direct On Line; SD = Star/Delta; AT = Auto Transformer; Inv = Inverter
3. Numbers of Points and control cable cores are given for guidance. Tenderer to review against written specified requirements and make due allowance for what is required
4. Cable type: 1 = Xlpe/SWA/LSF
5. Cable sizes are in mm2. CPC sizes shall be as BS7671 (IEE Regulations)

RE6309/D1368 Rev 0/2003 15910/17 BEMS Point Schedule + MCC Load Diagram
BEMS POINT SCHEDULE & MCC LOAD DIAGRAM
Town Hotel, Level 5 Plant Room 2, Zone 2 Centre

Starting Gear Rating A

Load Item Power kW


Control Cable Cores

Starting Gear Type


Analouge or Digital

Compartment #

Cable Cores
Nr of Points

Cable Type

Cable Size
Location
Device

[T-5-PAH3-02] DOL 20 2 3 2.5 3.0kW


Duct SA temp. detector [AHU] 1 A 2 1
Duct SA Hum. detector [AHU] 1 A 2 DOL 16 2 3 1.5 1.5kW
Duct IA temp. detector [AHU] 1 A 2

T-5-MCC-02
Duct IA Hum. detector [AHU] 1 A 2
Motorised Valve [AHU] 1 A 3
Motorised Valve [AHU] 1 A 3
Rotary wheel starter [MCC] 2 D 3
Supply fan starter [MCC] 3 D 5
Extract fan starter [MCC] 3 D 5
Supply fan isolator [AHU] 1 D 2
Exract fan isolator [AHU] 1 D 2
Rotary wheel isolator [AHU] 1 D 2
Pre Filter DP switch [AHU] 1 D 2
Main Filter DP switch [AHU] 1 D 2

[Fire Alarm]
Fire Alarm Interface Unit, zone 1 MCC 1 D 2

1. A = Analogue; D = Digital; C = Communication


2. Starters: DOL = Direct On Line; SD = Star/Delta; AT = Auto Transformer; Inv = Inverter
3 Cable Type :1 = Xlpe/Swa/LSF

4. Numbers of Points and control cable cores are given for guidance. Tenderer to review against written specified requirements and make due allowance for wh

RE6309/D1368 Rev 0/2003 15910/18 BEMS Point Schedule + MCC Load Diagram
BEMS POINT SCHEDULE & MCC LOAD DIAGRAM
Town Hotel, Level 5 Plant Room 3, Zone 2 West

Starting Gear Rating A

Load Item Power kW


Control Cable Cores

Starting Gear Type


Analouge or Digital

Compartment #

Cable Cores
Nr of Points

Cable Type

Cable Size

Load Item
Location
Device

[T-5-PAH3-03] DOL 20 2 3 4 3.0kW Supply fan


Duct SA temp. detector [AHU] 1 A 2 1 DOL 2 2 3 1.5 0.2kW Rotary Wheel
Duct SA Hum. detector [AHU] 1 A 2 DOL 16 2 3 2.5 2.2kW Extract fan
Duct IA temp. detector [AHU] 1 A 2

T-5-MCC-03
Duct IA Hum. detector [AHU] 1 A 2
Motorised Valve [AHU] 1 A 3
Motorised Valve [AHU] 1 A 3
Rotary wheel starter [MCC] 2 D 3
Supply fan starter [MCC] 3 D 5
Extract fan starter [MCC] 3 D 5
Supply fan isolator [AHU] 1 D 2
Exract fan isolator [AHU] 1 D 2
Rotary wheel isolator [AHU] 1 D 2
Pre Filter DP switch [AHU] 1 D 2
Main Filter DP switch [AHU] 1 D 2

[Fire Alarm]
Fire Alarm Interface Unit, zone 1 MCC 1 D 2

[Sprinkler]
Sprinkler zone alarm LG - centre Field 1 D 2
Sprinkler zone alarm L1 - centre Field 1 D 2
Sprinkler zone alarm L2 - centre Field 1 D 2
Sprinkler zone alarm L3 - centre Field 1 D 2
Sprinkler zone alarm L4 - centre Field 1 D 2
Sprinkler zone alarm L5 - centre Field 1 D 2

Sewage Pumping Station 5 (SPS-05)


Common alarm Field 1 D 2
High level alarm Field 1 D 2
Pump run monitoring Field 3 D 4

1. A = Analogue; D = Digital; C = Communication


2. Starters: DOL = Direct On Line; SD = Star/Delta; AT = Auto Transformer; Inv = Inverter
3 Cable Type :1 = Xlpe/Swa/LSF

RE6309/D1368 Rev 0/2003 15910/19 BEMS Point Schedule + MCC Load Diagram
BEMS POINT SCHEDULE & MCC LOAD DIAGRAM
Town Hotel, Level 5 Plant Room 4, Zone 3 East

Starting Gear Rating A

Load Item Power kW


Control Cable Cores

Starting Gear Type


Analouge or Digital

Compartment #

Cable Cores
Nr of Points

Cable Type

Cable Size

Load Item
Location
Device

[T-5-PAH3-04] DOL 16 2 3 2.5 2.2kW Supply fan


Duct SA temp. detector [AHU] 1 A 2 1 DOL 2 2 3 1.5 0.2kW Rotary Wheel
Duct SA Hum. detector [AHU] 1 A 2 DOL 16 2 3 1.5 1.5kW Extract fan
Duct IA temp. detector [AHU] 1 A 2

T-5-MCC-04
Duct IA Hum. detector [AHU] 1 A 2
Motorised Valve [AHU] 1 A 3
Motorised Valve [AHU] 1 A 3
Rotary wheel starter [MCC] 2 D 3
Supply fan starter [MCC] 3 D 5
Extract fan starter [MCC] 3 D 5
Supply fan isolator [AHU] 1 D 2
Exract fan isolator [AHU] 1 D 2
Rotary wheel isolator [AHU] 1 D 2
Pre Filter DP switch [AHU] 1 D 2
Main Filter DP switch [AHU] 1 D 2

[Fire Alarm]
Fire Alarm Interface Unit, zone 1 MCC 1 D 2

1. A = Analogue; D = Digital; C = Communication


2. Starters: DOL = Direct On Line; SD = Star/Delta; AT = Auto Transformer; Inv = Inverter
3 Cable Type :1 = Xlpe/Swa/LSF

RE6309/D1368 Rev 0/2003 15910/20 BEMS Point Schedule + MCC Load Diagram
BEMS POINT SCHEDULE & MCC LOAD DIAGRAM
Town Hotel, Level 5 Plant Room 5, Zone 3 Centre

Starting Gear Rating A

Load Item Power kW


Control Cable Cores

Starting Gear Type


Analouge or Digital

Compartment #

Cable Cores
Nr of Points

Cable Type

Cable Size

Load Item
Location
Device

[T-5-PAH3-05] DOL 16 2 3 2.5 2.2kW Supply fan


Duct SA temp. detector [AHU] 1 A 2 1 DOL 2 2 3 1.5 0.2kW Rotary Wheel
Duct SA Hum. detector [AHU] 1 A 2 DOL 16 2 3 1.5 1.5kW Extract fan
Duct IA temp. detector [AHU] 1 A 2

T-5-MCC-05
Duct IA Hum. detector [AHU] 1 A 2
Motorised Valve [AHU] 1 A 3
Motorised Valve [AHU] 1 A 3
Rotary wheel starter [MCC] 2 D 3
Supply fan starter [MCC] 3 D 5
Extract fan starter [MCC] 3 D 5
Supply fan isolator [AHU] 1 D 2
Exract fan isolator [AHU] 1 D 2
Rotary wheel isolator [AHU] 1 D 2
Pre Filter DP switch [AHU] 1 D 2
Main Filter DP switch [AHU] 1 D 2

[Sprinkler]
Sprinkler zone alarm LG - centre Field 1 D 2
Sprinkler zone alarm L1 - centre Field 1 D 2
Sprinkler zone alarm L2 - centre Field 1 D 2
Sprinkler zone alarm L3 - centre Field 1 D 2
Sprinkler zone alarm L4 - centre Field 1 D 2
Sprinkler zone alarm L5 - centre Field 1 D 2

[Fire Alarm]
Fire Alarm Interface Unit, zone 1 MCC 1 D 2

1. A = Analogue; D = Digital; C = Communication


2. Starters: DOL = Direct On Line; SD = Star/Delta; AT = Auto Transformer; Inv = Inverter
3 Cable Type :1 = Xlpe/swa/LSF

4. Numbers of Points and control cable cores are given for guidance. Tenderer to review against written specified requirements and make due allowance for what is required

RE6309/D1368 Rev 0/2003 15910/21 BEMS Point Schedule + MCC Load Diagram
BEMS POINT SCHEDULE & MCC LOAD DIAGRAM
Town Hotel, Level 5 Plant Room 6 Zone 3, West

Starting Gear Rating A

Load Item Power kW


Control Cable Cores

Starting Gear Type


Analouge or Digital

Compartment #

Cable Cores
Nr of Points

Cable Type

Cable Size

Load Item
Location
Device

[T-5-PAH3-06] DOL 20 2 3 4 3.0kW Supply fan


Duct SA temp. detector [AHU] 1 A 2 1 DOL 2 2 3 1.5 0.2kW Rotary Wheel
Duct SA Hum. detector [AHU] 1 A 2 DOL 16 2 3 1.5 1.5kW Extract fan
Duct IA temp. detector [AHU] 1 A 2

T-5-MCC-06
Duct IA Hum. detector [AHU] 1 A 2
Motorised Valve [AHU] 1 A 3
Motorised Valve [AHU] 1 A 3
Rotary wheel starter [MCC] 2 D 3
Supply fan starter [MCC] 3 D 5
Extract fan starter [MCC] 3 D 5
Supply fan isolator [AHU] 1 D 2
Exract fan isolator [AHU] 1 D 2
Rotary wheel isolator [AHU] 1 D 2
Pre Filter DP switch [AHU] 1 D 2
Main Filter DP switch [AHU] 1 D 2

[Fire Alarm]
Fire Alarm Interface Unit, zone 1 MCC 1 D 2

1. A = Analogue; D = Digital; C = Communication


2. Starters: DOL = Direct On Line; SD = Star/Delta; AT = Auto Transformer; Inv = Inverter
3 Cable Type :1 = Xlpe/Swa/LSF
4. Numbers of Points and control cable cores are given for guidance. Tenderer to review against written specified requirements and make due allowance for what is required

RE6309/D1368 Rev 0/2003 15910/22 BEMS Point Schedule + MCC Load Diagram
BEMS POINT SCHEDULE & MCC LOAD DIAGRAM
Town Hotel, Childrens Pool Plant Room

Starting Gear Rating


Control Cable Cores

Starting Gear Type


Analouge or Digital

Load Item Power


Compartment #

Cable Cores
Nr of Points

Cable Type

Cable Size

Load Item
Location
Device

[Children's Pool]

T-G-MCC-04
Chilled water motorised Valve Field 1 A 3
LTHW motorised Valve Field 1 A 3
Return immersion detector pool Field 1 A 3
Common Alarm MCC 1 D 3

[Spa 1]
Chilled water motorised Valve Field 1 A 3
LTHW motorised Valve Field 1 A 3
Return immersion detector pool Field 1 A 3
Common Alarm MCC 1 D 3

[Spa 2]
Chilled water motorised Valve Field 1 A 3
LTHW motorised Valve Field 1 A 3
Return immersion detector pool Field 1 A 3
Common Alarm MCC 1 D 3

[Amphitheatre Water Feature]


Activate water feature MCC 1 D 2
Common alarm water feature MCC 1 D 2

1. A = Analogue; D = Digital; C = Communication


2. Starters: DOL = Direct On Line; SD = Star/Delta; AT = Auto Transformer; Inv = Inverter, I = isolator
3 Cable Type :1 = Xlpe/swa/LSF
4. Numbers of Points and control cable cores are given for guidance. Tenderer to review against written specified requirements and make due allowance for what is required

RE6309/D1368 Rev 0/2003 15910/23 BEMS Point Schedule + MCC Load Diagram
BEMS POINT SCHEDULE & MCC LOAD DIAGRAM
Town Hotel, Main and Formal Pools

Control Cable Cores


Analouge or Digital
Nr of Points
Location
Device

T-G-MCC-05
[Main Pool]
Chilled water motorised Valve Field 1 A 3
LTHW motorised Valve Field 1 A 3
Return immersion detector pool Field 1 A 3
Common Alarm MCC 1 D 3

[Formal Pool]
Chilled water motorised Valve Field 1 A 3
LTHW motorised Valve Field 1 A 3
Return immersion detector pool Field 1 A 3
Common Alarm MCC 1 D 3

Sewage Pumping Station 6 (SPS-06)


Common alarm Field 1 D 2
High level alarm Field 1 D 2
Pump run monitoring Field 3 D 4

1. A = Analogue; D = Digital; C = Communication


2. Starters: DOL = Direct On Line; SD = Star/Delta; AT = Auto Transformer; Inv = Inverter
3 Cable Type :1 = Xlpe/swa/LSF
4. Numbers of Points and control cable cores are given for guidance. Tenderer to review against written specified requirements and make due allowance for what is required

RE6309/D1368 Rev 0/2003 15910/24 BEMS Point Schedule + MCC Load Diagram
BEMS POINT SCHEDULE & MCC LOAD DIAGRAM
Town Hotel, Lazy River West Plant Room

Starting Gear Rating


Control Cable Cores

Starting Gear Type


Analouge or Digital

Load Item Power


Compartment #

Cable Cores
Cable Type

Load Item
Location
Device

Cable

T-G-MCC-06
[Lazy River West]
Chilled water motorised Valve Field 1 A 3
LTHW motorised Valve Field 1 A 3
Return immersion detector pool Field 1 A 3
Common Alarm MCC 1 D 3

[Cascade Water Feature]


Activate water feature MCC 1 D 2
Common alarm water feature MCC 1 D 2

1. A = Analogue; D = Digital; C = Communication


2. Starters: DOL = Direct On Line; SD = Star/Delta; AT = Auto Transformer; Inv = Inverter
3 Cable Type :1 = Xlpe/swa/LSF
4. Numbers of Points and control cable cores are given for guidance. Tenderer to review against written specified requirements and make due allowance for what is required