SEPTIC VAULT

GENERAL NOTES:
1. ALL PLUMBING SPECIFICATIONS HEREIN SHALL BE MADE IN ACCORDANCE WITH THE RULES AND REGULATIONS OF THE LATES
W
4 EDITION OF THE PHILIPPINE NATIONAL PLUMBING CODE, ALL NATIONAL AND REQUIREMENTS OF UTILITY COMPANY
TOILET CONCERNED.
WALK-IN
CLOSET 2. THE LACATION OF PIPES MAYBE TRANSFERED WHENEVER REQUIRED FOR THE PROPER EXECUTION OF OTHER TRADES
URINAL
PROVIDED, THAT SUCH CHANGES CONFORMS WITH THE RULES AND REQUIREMENTS OF THE ARCHITECT.
HALLWAY

LAVATORY 3. ALL PIPE JOINTS SHALL BE MADE WATER TIGHT AND PROPERLY SEALED USING THE FOLLOWING:
TOILET KITCHEN AREA
TOILET TOILET PVC PIPES SOLVENT CEMENT- FOR PVC PIPES & FITTINGS
LAVATORY

LAVATORY

CONVENTION AREA
SHOWER AREA SHOWER AREA TEFLON TAPE- FOR GALVANIZED IRON PIPES & FITTINGS
CEMENT MORTATR- FOR CONCRETE PIPES (CULVERTS)
W
1
GASKET CEMENT- FOR GALVANIZED IRON PIPES & FITTINGS
TOILET OAKUM & PEG LEAD- FOR CAST IRON PIPES & FITTINGS.
W
LIVING AREA 2 MAIN C.R. 3
4. MATERIALS TO BE USED FOR THE PIPING SYSTEM SHALL BE AS FOLLOWS:
LAVATORY

LAVATORY

W
1
HALLWAY TOILET
SHOWER
AREA G.I. PIPES & FITTINGS FOR MAIN WATER SUPPLY LINE.
ESLON BLUE PVC PIPES & FITTINGS FOR IN HOUSE WATER SUPPLY RISER & BRANCHES.
NETLEX PVC PIPES & FITTINGS- FOR SOIL WASTE VENT & STORM WATER LINES (DOWNSPOUT)
PORCH
CONCRETE PIPE (CULVERT)- THE STORM DRAINAGE LINES BELOW THE GROUND VENT PIPES SHALL EXTEND FROM THE TOP OF
THE ROOF AT LEAST 200mm FOR FLAT ROOFS AND 3OOmm FOR SLOPING ROOFS, ALL VTR OPENING MUST BE COVERED BY USING
A WIRE SCREEN.
5. ALL HORIZONTAL PIPES SHALL MAINTAIN A MINIMUM SLOPE OF 1/4 PER FOOT (12%).
6. NO ARTESSIAN WORKS SHALL BE DONE WITHIN A RADIUS OF 25m FROM THE PROPOSED SEPTIC VAULT.
SECOND FLOOR PLAN 7. ALL PLUMBING WORKS HEREIN SHALL BE DONE BY COMPLETE PLUMBERS UNDER THE DIRECT SUPERVISION OF DULY REGISTERED
GROUND FLOOR PLAN SCALE 1:150M MASTER PLUMBER.
SCALE 1:150M
10mm in diameter BEDBARS SP.
@ 0.15m on center B.W.
WATER TANK
W 1.2m
4
0.40m o.2om
TOILET
WALK-IN
CLOSET
MANHOLE MANHOLE MANHOLE
URINAL
.50m .50m

HALLWAY
0.10m 0.10m 0.10m 0.10m
LAVATORY
0.40m 0.20m 0.20m .30m .30m
TOILET KITCHEN AREA

0.10m
TOILET TOILET

LAVATORY

LAVATORY
1.8m 0.90m 0.90m
SHOWER AREA SHOWER AREA
CONVENTION AREA

0.60m
0.40m
3.60m
W INLET OUTLET INLET OUTLET
1
MANHOLE MANHOLE MANHOLE
TOILET

0.10m
W
LIVING AREA 2 MAIN C.R. 3
AIR SPACE
0.30m
LAVATORY

LAVATORY
W OUTLET
1
HALLWAY TOILET
SHOWER
AREA
1.70m DIGESTIVE CHAMBER LEACHING LEACHING
CHAMBER CHAMBER
1.20m
PORCH
9mm in diameter VERTICAL & HORIZONTAL
BARS S.P. @ 0.60m D.C. B.W.
GROUND FLOOR PLAN SECOND FLOOR PLAN
SCALE 1:150M
P SEPTIC VAULT DETAILS
SCALE 1:150M P-1 P-1
SCALE: 1:150 M
LOGO CERTIFIED BY: PRC REG No: PROJECT TITLE &LOCATION: APPROVED: DESIGNED BY: REVISION: SHEET CONTENT: SHEET NO:
P 01
No. DESCRIPTION BT DATE
PTR No:
PROPOSED TWO-STOREY AS SHOWN
DATE ISSUED: RESIDENTIAL BLDG. PEPITO P. ORTIZO ALDRIN LLOYD CATULINAN
REGISTERED MASTER PLUMBER
TIN No: LOCATION: BARANGAY NEW CARMEN, TACURONG CITY, SULTAN KUDARAT

OWNER
02