Professional Documents
Culture Documents
-
2P, 80AT
- MAIN
MCCB
-
-
2P, 20AT 2P, 20AT
L.O. 1 2 L.O.
-
ACU
2P, 20AT 2P, 20AT
C.O. 5 6 C.O.
TOTAL 4 3TOTAL PHASE DEMAND LOAD (ØTDVA)
GND #
A B C D E F A B C D E F
8.50 8.50
1.00 3.25 1.00 1.25 3.00 1.00 1.00 3.25 1.00 1.25 3.00 1.00
SPECIFICATIONS:
1. ALL ELECTRICAL WORKS HEREIN SHALL BE DONE IN ACCORDANCE WITH
THE RULES AND REGULATIONS OF THE LATEST EDITION OF THE PHILIPPINE
ELECTRICAL CODE AND WITH THE LOCAL UTILITY POWER COMPANY.
0.90
0.90
1 1 2. ALL MATERIALS TO BE USED SHALL BE NEW AND APPROVED TYPE TO THE
LOCATION.
1.50
1.50
2.00
2.00
3. MINIMUM SIZE OF WIRE SHALL BE 3.5mm² THHN AND 20 mmØ PVC SERIES 1000
ELECTRICAL PIPE OR UNLESS SPECIFIED.
4.00
4.00
7
4. MOUNTING HEIGHT OF DEVICES APPROVED BY ENGINEER IN CHARGE AS
2.50
2.50
1.50
1.50
8
3
R
FOLLOWS:
1.92
1.92
2 2
REF
PANEL BOARD-1.80 m. ABOVE FLOOR LINE
SWITCHES-1.40 m. ABOVE FLOOR LINE
CONVENIENCE OUTLET-0.30 m. ABOVE FLOOR LINE
3.00
3.00
6
12.00
4.00
4.00
4.00
4.00
1
BOXES OF PROPER SIZE SHALL BE INSTALLED ALTHOUGH SUCH BOXES
PB1
PB1
ARE NOT SHOWN ON THE PLANS.
13.50
13.50
2
1.50
1.50
6. ALL WORKS SHALL BE DONE UNDER THE SUPERVISION OF A DULY
4
LICENSED ELECTRICAL ENGINEER OR REGISTERED MASTER ELECTRICIAN.
3 3
9 A.C.U 7. ALL REVISION OR ADDITONAL WORKS ON ELECTRICAL PLANS SHOULD BE
CONSULTED TO THE DESIGNER (P.E.E.)
4.00
4.00
4.00
4.00
4.00
5
SERVICE ENTRANCE FOR CONNECTION TO POWER COMPANY SERVICE POINT.
4 4
9. ALL WIRING SHALL BE INSTALLED IN STANDARD MOLDFLEX OR PVC ELECTRICAL
CONDUITS RUN EMBEDDED INSIDE THE CONCRETE AND HOLLOW BLOCK
5 5 STRUCTURES, SLABS, COLUMNS, WALLS, PARTITIONS AND INSIDE THE CEILING
SPACES. WHERE THE USE OF CONCEALED CONDUIT WIRING IS IMPRACTICABLE
1.50
1.50
1.50
1.50
SURFACE METAL, PVC MOULDING MAY BE USED.
6 6