SHOTCRETING
1
a. Type of Shotcrete :-OPC 53 grade cement with M Sand
d. Protective clothing such as apron, face mask, hand gloves, shoes Safety Belts, Nets will be provided
e. Tools such as Compressor, Gunting machine, Hoses, Nozzle, water tank & other accessories
using for shotcreting works.
g. Survey marks of excavation line shall be established as per the sketch enclosed.
h. Leaving offset from the building line (as per site condition) slope shall be done.
i. The slope shall be maintained leaving at least 2 M from the existing building.
j. Scaffolding and working platforms shall be erected to facilitate nailing and shotcreting works.
l. Nailing with 16 mm dia reinforcement of 2.50 m long shall be done at 400 mm c/c in a
staggered manner.
n. For Vertical & Horizontal Joints 50mm over lapping will be provided by welding mesh
p. The above procedure shall be followed at every 1.5 m till the proposed excavation level.
q. Proper dewatering system shall be adopted to avoid stagnation of water at the toe point of
excavated surface.