This document provides a distribution load schedule for a small power DB located on the ground floor of a building. It lists 16 circuits supplying various areas including receptions, hallways, toilets, and escalators. The total load served is approximately 20.4 kW. Each circuit is rated for amperage and wire size and lists the load served in watts per phase.
This document provides a distribution load schedule for a small power DB located on the ground floor of a building. It lists 16 circuits supplying various areas including receptions, hallways, toilets, and escalators. The total load served is approximately 20.4 kW. Each circuit is rated for amperage and wire size and lists the load served in watts per phase.
This document provides a distribution load schedule for a small power DB located on the ground floor of a building. It lists 16 circuits supplying various areas including receptions, hallways, toilets, and escalators. The total load served is approximately 20.4 kW. Each circuit is rated for amperage and wire size and lists the load served in watts per phase.
DISTRIBUTION LOAD SCHEDULE / DB /GF-P1 (Small Power )
10 WAY TPN DB WITH 40A - 4 Pole / 100mA ELCB
MAIN CABLE: 4C x 16 mm2 XLPE Amored Cable + 1C x 16mm2 ECC Cable FROM SMDB-GF1 Location: GF1 Floor Electrical Room-01
RCDO CCT. ECC
LOAD IN WATTS PER PHASE CCT RTG. WIRE WIRE 13A 13A W/H 15A 3ph WATT/ ROOM/AREA Ref. IN IN SIZE S/O S/O S/O Iso UNIT AMP MM2 MM2 S D R Y B R1 20 4 4 Reception 4 200 800.00 Y1 20 4 4 Reception 4 200 800.00 B1 20 4 4 Reception 4 200 800.00 R2 20 4 4 Lift Lobby 4 1500 0.00 Y2 20 4 4 Reception&Stair Lobby 3 1500 0.00 B2 20 4 4 Sitting Area 4 200 800.00 R3 20 4 4 Sitting Area & EL Room 4 200 800.00 Y3 20 4 4 Hallway 4 200 800.00 B3 20 4 4 Hallway 4 200 800.00 R4 20 4 4 Main Reception FB 4 200 800.00 Y4 20 4 4 Main Reception 4 200 800.00 B4 20 4 4 Main Reception 4 200 800.00 R5 20 4 4 Main Reception 4 200 800.00 Y5 20 4 4 Main Reception 4 200 800.00 B5 20 4 4 Storage 4 200 800.00 R6 25 4 4 Wifi Power Hallway 1 200 200.00 Y6 20 4 4 Wifi Power Hallway 1 200 200.00 B6 20 4 4 Reception Wifi Power 1 200 200.00 R7 4C X 1500.00 Y7 16A TP 4MM2+1CX4MM2 Escalator -1 1 4500 1500.00 ECC B7 1500.00 R8 4C X 1500.00 16A TP 4MM2+1CX4MM2 Escalator -2 1 4500 ECC 4C X Y8 16A TP 4MM2+1CX4MM2 Escalator -2 1 4500 1500.00 ECC B8 1500.00 R9 20 4 4 Reception TV Outlet 1 200 200.00 Y9 20 4 4 Main Reception TV Outlet 1 200 200.00 B9 20 4 4 Reception Ent door power 1 0.00 R10 20 Spare Y10 20 Spare B10 20 Spare TOTAL 6600.00 6600.00 7200.00
Total Load : 20400.00
20.40 KW DISTRIBUTION LOAD SCHEDULE / DB -GF-P2 (Small Power) 16 WAY TPN DB WITH 63A - 4 Pole / 100mA ELCB MAIN CABLE: 4C x 16 mm2 XLPE Amored Cable + 1C x 16mm2 ECC Cable FROM SMDB-GF2 Location: GF1 Floor Electrical Room-02
RCDO CCT. ECC
LOAD IN WATTS PER PHASE CCT RTG. WIRE WIRE 13A 13A W/H 15A 1Ph WATT/ ROOM/AREA Ref. IN IN SIZE S/O S/O S/O 3Ph UNIT AMP MM2 MM2 S D Iso R Y B R1 20 4 4 Toilet Wall outlet 4 200 800.00 Y1 20 4 4 Toilet WH 1 1500 1500.00 B1 20 4 4 Toilet WH 1 1500 1500.00 R2 20 4 4 Bowling Display Soclet 4 200 800.00 Y2 20 4 4 Lift Lobby 4 200 800.00 B2 20 4 4 Stimulator 4 200 800.00 R3 20 4 4 Stimulator 3 200 600.00 Y3 20 4 4 Stimulator Isolator 1 500 500.00 B3 20 4 4 Namless room 4 200 800.00 R4 20 4 4 Stimulator 3 200 600.00 Y4 20 4 4 Stimulator 2 Entry 4 200 800.00 B4 20 4 4 Stimulator 2 Ent Lobby 4 200 800.00 R5 20 4 4 Passage 3 200 600.00 Y5 20 4 4 Stimulator 2 3 200 600.00 B5 20 4 4 Stimulator 2 3 200 600.00 R6 25 4 4 Hall way wall socket 4 200 800.00 Y6 20 4 4 Hall way wall socket 4 200 800.00 B6 20 4 4 Hall way wall socket 4 200 800.00 R7 20 4 4 Toilet WH 1 1500 1500.00 Y7 20 4 4 Hall way wall socket 4 200 800.00 B7 20 4 4 Storage 4 200 800.00 R8 20 4 4 Hall way wall socket 4 200 800.00 Y8 20 4 4 Hall way wall socket 4 200 800.00 B8 20 4 4 Reception 4 200 800.00 R9 20 4 4 Hall way wall socket 4 200 800.00 Y9 20 4 4 Hall way wall socket 4 200 800.00 B9 20 4 4 Hall way wall socket 4 200 800.00 R10 20 4 4 Hall way F/B 2 200 400.00 Y10 20 4 4 Hall way wall socket 3 200 600.00 B10 20 4 4 Hall way Wifi Power 1 200 200.00 R11 20 4 4 Hall way Wifi Power 1 200 200.00 Y11 20 4 4 Hall way Wifi Power 1 200 200.00 B11 20 4 4 Hall way Wifi Power 1 200 200.00 R12 20 4 4 Hall way Wifi Power 1 200 200.00 Y12 20 4 4 Wifi Power outlet in Stimulator 1 200 200.00 B12 20 4 4 Wifi Power outlet in Stimulator 1 200 200.00 R13 4C X 1500.00 Y13 16A TP 4MM2+1CX4MM2 Escalator -1 1 4500 1500.00 ECC B13 1500.00 R14 4C X 1500.00 Y14 16A TP 4MM2+1CX4MM2 Escalator -2 1 4500 1500.00 ECC B14 1500.00 R15 20 4 4 Bowling Room F/B 4 200 800.00 Y15 20 Storage/counter 4 200 800.00 B15 20 Storage 4 200 800.00 R16 20 Spare Y16 20 Spare B16 20 Spare TOTAL 11900.00 12200.00 12100.00
Total Load : 36200.00
36.20 KW DISTRIBUTION LOAD SCHEDULE / DB -GF-P3 (Small Power) 11 WAY TPN DB WITH 40A - 4 Pole / 100mA ELCB MAIN CABLE: 4C x 16 mm2 XLPE Amored Cable + 1C x 16mm2 ECC Cable FROM SMDB-GF3 Location: GF1 Floor Electrical Room-03
RCDO CCT. ECC
LOAD IN WATTS PER PHASE CCT RTG. WIRE WIRE 13A 13A W/H 15A 1Ph WATT/ ROOM/AREA Ref. IN IN SIZE S/O S/O S/O 3Ph UNIT AMP MM2 MM2 S D Iso R Y B R1 20 4 4 Centre Hall way wall socket 4 200 800.00 Y1 20 4 4 Hall Way socket outlet 4 200 800.00 B1 20 4 4 Hall Way socket outlet 4 200 800.00 R2 20 4 4 Hall Way socket outlet 3 200 600.00 Y2 20 4 4 Wifi Power outlet in Hallway 4 200 800.00 B2 20 4 4 Wifi Power outlet in Hallway 4 200 800.00 R3 4C X 1500.00 Y3 16A TP 4MM2+1CX4MM2 Escalator -1 1 4500 1500.00 ECC B3 1500.00 R4 4C X 1500.00 Y4 16A TP 4MM2+1CX4MM2 Escalator -2 1 4500 1500.00 ECC B4 1500.00 R5 20 4 4 Ele room + Hall way socket 4 200 800.00 Y5 20 4 4 Centre Hall way wall socket 4 200 800.00 B5 20 4 4 Hall Way socket outlet 4 200 800.00 R6 25 4 4 Hall Way socket outlet 4 200 800.00 Y6 20 4 4 Hall Way socket outlet 4 200 800.00 B6 20 4 4 Hall Way socket outlet 1 200 200.00 R7 20 4 4 Hall Way socket outlet 1 200 200.00 Y7 20 4 4 Wifi Power outlet in Kids Play 1 200 200.00 B7 20 4 4 Wifi Power outlet in Hallway 1 200 200.00 R8 20 4 4 Centre Hallway F/B 4 200 800.00 Y8 20 Spare B8 20 Spare TOTAL 7000.00 6400.00 5800.00
Total Load : 19200.00
19.20 KW DISTRIBUTION LOAD SCHEDULE / DB -GF-P4 (Small Power) 11 WAY TPN DB WITH 40A - 4 Pole / 100mA ELCB MAIN CABLE: 4C x 16 mm2 XLPE Amored Cable + 1C x 16mm2 ECC Cable FROM SMDB-GF3 Location: GF1 Floor Electrical Room-04
18.60 KW DISTRIBUTION LOAD SCHEDULE / DB -GF1-KIOSK 1 (Small Power) 5 WAY TPN DB WITH 20A - 4 Pole / 100mA ELCB MAIN CABLE: 4C x 4 mm2 XLPE Amored Cable + 1C x 4 mm2 ECC Cable FROM SMDB-GF1-1 Location: GF1 Floor Electrical Room-01
RCDO CCT. ECC
LOAD IN WATTS PER PHASE CCT RTG. WIRE WIRE 13A 13A W/H 15A WATT/ ROOM/AREA Ref. IN IN SIZE S/O S/O S/O UNIT AMP MM2 MM2 S D R Y B R1 20 4 4 Kiosk Opp Main Reception 4 200 800.00 Y1 20 4 4 Kiosk Opp Main Reception 3 200 600.00 B1 20 4 4 Kiosk Opp Shop 4 200 800.00 R2 20 4 4 Kiosk Opp Hallway LHS 4 200 800.00 Y2 20 4 4 Kiosk Opp Hallway LHS 4 200 800.00 B2 20 4 4 Kiosk Opp Hallway LHS 3 200 600.00 R3 20 4 4 Kiosk Opp Hallway LHS 3 200 600.00 Y3 20 4 4 Kiosk Opp Hallway LHS 4 200 800.00 B3 20 4 4 Spare 0.00 R4 4C X 1000.00 Y4 16A TP 4MM2+1CX4MM2 DB-SHOP 3000 1000.00 ECC B4 1000.00 R5 20 Spare 200 0.00 Y5 20 Spare 200 0.00 B5 20 Spare 0.00 TOTAL 3200.00 3200.00 2400.00
Total Load : 8800.00
8.80 KW DISTRIBUTION LOAD SCHEDULE / DB -KIOSK 2 (Small Power) 8 WAY TPN DB WITH 32A - 4 Pole / 100mA ELCB MAIN CABLE: 4C x 10 mm2 XLPE Amored Cable + 1C x 10mm2 ECC Cable FROM SMDB-1F3 Location: 1st Floor Electrical Room-04
RCDO CCT. ECC
LOAD IN WATTS PER PHASE CCT RTG. WIRE WIRE 13A 13A W/H 15A WATT/ ROOM/AREA Ref. IN IN SIZE S/O S/O S/O UNIT AMP MM2 MM2 S D R Y B R1 20 4 4 Kiosk Near Hallway 2 200 400.00 Y1 20 4 4 Kiosk Near Hallway 2 200 400.00 B1 20 4 4 Kiosk Near Hallway 4 200 800.00 R2 20 4 4 Kiosk Near Hallway 2 200 400.00 Y2 20 4 4 Kiosk Near Hallway 2 200 400.00 B2 20 4 4 Kiosk Near Hallway 2 200 400.00 R3 20 4 4 Kiosk Near Hallway 2 200 400.00 Y3 20 4 4 Kiosk Near Hallway 2 200 400.00 B3 20 4 4 Kiosk Near Hallway 2 200 0.00 R4 20 4 4 Kiosk Near Escalator 2 200 1000.00 Y4 20 4 4 Kiosk Near Electrical room 2 200 400.00 B4 20 4 4 Kiosk Near Electrical room 2 200 1000.00 R5 20 4 4 Kiosk Near Electrical room 2 200 400.00 Y5 20 4 4 Kiosk Near Electrical room 4 200 800.00 B5 20 4 4 Kiosk Near Stimulator 4 200 800.00 R6 20 4 4 Kiosk Near Stimulator 4 200 800.00 Y6 20 4 4 Kiosk Near Stimulator 4 200 800.00 B6 20 4 4 Kiosk Near Stimulator 2 200 400.00 R7 20 4 4 Kiosk Near Stimulator 4 200 800.00 Y7 20 4 4 Kiosk Near RHS Hallway 4 200 800.00 B7 20 4 4 Kiosk Near RHS Hallway 4 200 800.00 R8 20 4 4 Spare 200 0.00 Y8 20 4 4 Spare 200 0.00 B8 20 4 4 Spare 0.00 TOTAL 4200.00 4000.00 4200.00
Total Load : 12400.00
12.40 KW DISTRIBUTION LOAD SCHEDULE / DB -GF-CAFÉ-LHS (Light, Small Power, AC) 10 WAY TPN DB WITH 40A - 4 Pole / 100mA ELCB MAIN CABLE: 4C x 16 mm2 XLPE Amored Cable + 1C x 16mm2 ECC Cable FROM SMDB-GF1 Location: 1st Floor Electrical Room-01
13.50 KW DISTRIBUTION LOAD SCHEDULE / DB -GF-SHOP2 (Light, Small Power, AC) 6 WAY TPN DB WITH 32A - 4 Pole / 100mA ELCB MAIN CABLE: 4C x 10 mm2 XLPE Amored Cable + 1C x 10mm2 ECC Cable FROM SMDB-GF1 Location: GF1 Floor Shop-02
9.20 KW DISTRIBUTION LOAD SCHEDULE / DB -GF-SHOP3 (Light, Small Power, AC) 6 WAY TPN DB WITH 32A - 4 Pole / 100mA ELCB MAIN CABLE: 4C x 10 mm2 XLPE Amored Cable + 1C x 10mm2 ECC Cable FROM SMDB-GF1 Location: GF1 Floor Shop-03
15.20 KW DISTRIBUTION LOAD SCHEDULE / DB -GF-SHOP4 (Light, Small Power, AC) Near RHS Kitchen WAY TPN DB WITH 32A - 4 Pole / 100mA ELCB MAIN CABLE: 4C x 10 mm2 XLPE Amored Cable + 1C x 10mm2 ECC Cable FROM SMDB-GF1 Location: GF1 Floor Shop 4
16.60 KW DISTRIBUTION LOAD SCHEDULE / DB -GF-KIT-RHS (Light, Small Power, AC) RHS WAY TPN DB WITH 20A - 4 Pole / 100mA ELCB MAIN CABLE: 4C x 4 mm2 XLPE Amored Cable + 1C x 4mm2 ECC Cable FROM SMDB-GF1 Location: 1st Floor Electrical Room-01
6.40 KW DISTRIBUTION LOAD SCHEDULE / DB -GF-CAFE (Light, Small Power, AC) RHS WAY TPN DB WITH 50A - 4 Pole / 100mA ELCB MAIN CABLE: 4C x 16 mm2 XLPE Amored Cable + 1C x 16mm2 ECC Cable FROM SMDB-GF1 Location: 1st Floor Electrical Room-01
26.00 KW DISTRIBUTION LOAD SCHEDULE / DB -GF-SHOP1 (Light, Small Power, AC) Near Main Entrance LHS 3 WAY TPN DB WITH 20A - 4 Pole / 100mA ELCB MAIN CABLE: 4C x 4 mm2 XLPE Amored Cable + 1C x 4mm2 ECC Cable FROM SMDB-GF1 Location: 1st Floor Electrical Room-01
5.20 KW DISTRIBUTION LOAD SCHEDULE / DB -GF-SHOP5 (Light, Small Power, AC) Near Main Entrance RHS 3 WAY TPN DB WITH 20A - 4 Pole / 100mA ELCB MAIN CABLE: 4C x 4 mm2 XLPE Amored Cable + 1C x 4mm2 ECC Cable FROM SMDB-GF1 Location: 1st Floor Electrical Room-01