Professional Documents
Culture Documents
10
3
9
5
7
1
10 6
2
Date
ARKS
DATE
Doha Port Redevelopment – Combined Mina District & Seawater Diving Pool
CHECK LIST FOR STAND DRILLING MACHINE
-
Contractor Name Model Serial No Date
Double
insulation
Fore handle in
provided for the
1 good operating 2
equipment
condition
(written in the
machine body)
Equipment
should be free
Magnetic base is
from any defect
3 4 in charged
like broken
condition
Handle, broken
parts etc
Presence of Cord
Fuse is in good
5 strain reliever 6
condition
(glands).
Presence of dust
cleaning brush
near the
equipment
Presence of dust
cleaning brush
near the
equipment
Date
Y/N
58
DATE
Doha Port Redevelopment – Combined Mina District & Seawater Diving Pool
CHECK LIST FOR MOBILE CRANE
10 4
2
Boom structure
condition while full
Fire extinguisher in
9 expansion (damage, 10
operator cabin.
crack and jamming
while extending).
Boom structure
condition while full
Fire extinguisher in
9 expansion (damage, 10
operator cabin.
crack and jamming
while extending).
11 DOCUMENTS 11 DOCUMENTS
11.A Third party certificate(Form 11/12) 11.C Operator license (heavy duty).
11
14
9
8
5
6 3
3
Date
REMARKS
DATE
Doha Port Redevelopment – Combined Mina District & Seawater Diving Pool
CHECK LIST FOR SAFETY BELT
1.2m
6
4
2 5
3
1
1 2 3 4 5 6 7
inspect
harness webbing for
Harness is full body Safety harness is cuts, tears, burns and
Harness is ISI No damage in the Hook in the lanyard is
Safety with double lanyard Lanyard length is not made of Polyester abrasion damage
Sl. No. certified and tested lanyard and lanyard in working condition
Belt No. ( separate lanyard more than 1.2m with polyamide Fiber especially where
by manufacturer. joints. and with out damage
fixed in D-ring) rope there is contact with
hardware
NAME SIGNATURE
Inspected by
bined Mina District & Seawater Diving Pool
T FOR SAFETY BELT
9
8
Date:
8 9
No
damage in the
Check for damage due following element--
to contact with heat, 1. Brace.
paint, solvents or corros 2.Secondary Strap.
ives 3. Under bottom strap.
4.Thight strap.
5.Tightening element.
6.Coupling element
DATE
Doha Port Redevelopment – Combined Mina District & Seawater Diving Pool
CHECK LIST FOR METAL CUTTING MACHINE
-
Contractor Name Machine No Document No Date
5
6
2
1 4 3
Presence of
Presence of
locking system
3 4 job clamp and
for the plate &
its condition
Guard
Cable
condition(Any
Presence of
cut,wear etc)
5 handel and its 6
and presence
condition
of wire top
plug
Presence
7 cutting dust YES(Y)
guard
NO(N) X
NAME SIGNATURE DATE
Checked by
Doha Port Redevelopment – Combined Mina District & Seawater Diving Pool
CHECK LIST FOR PORTABLE GRINDING MACHINE
2 1
1
4
4
5 5
6
7 8 7
2
3 8 6
Wheel guard
Fore handle
1 2 (covering 3/4th
without damage.
area).
Presence of Cord
Trigger switch
5 strain reliever 6
without damage.
(glands).
Electric wire
Presence of
7 8 without cuts and
Switch lock.
joints.
Date
Y/N
DATE
DATE
Check List For Main Distribution Board / Panel Board
2 4
3 8
9 14
5 7
O/P cable
I/P cable
1
6
15
13
Contractor Name Machine No Document No Date
-
SL SL
NO
CHECK ITEM PHOTOS Y/N NO
CHECK ITEM PHOTOS
Authorized
Visualization of voltage,
Operator Name
current and type of
3 Photo, Contact 4
tools to be used in the
No.on DB panel
socket & Panel.
(Confirmation)
Identification of
Confirmation of LOTO
5 input and output 6
availability
cables O/P cable
I/P cable
Hylem sheet to be
Presence & Condition
11 provided over live 12
of Bus bar/ Terminal
bus bars
Condition of
Color coding to be
Cable,Power
13 14 followed (RYB) for all
Socket and Plug
cables/wires
without damage
Presence of rubber
Plug-Socket should be
mat infornt of the
15 16 Industrial type (IP 44
D.B (Operator
type)
Presence of rubber
Plug-Socket should be
mat infornt of the
15 16 Industrial type (IP 44
D.B (Operator
type)
standing Location)
Date
Y/N
DATE
Doha Port Redevelopment – Combined Mina District & Seawater Diving Pool
CHECK LIST FOR ARC WELDING MACHINE
6 2 2
1
5
4 3
8
SL SL
CHECK ITEM PHOTOS Y/N CHECK ITEM PHOTOS Y/N
NO NO
ON / OFF knob is
Regulator with
provided(Check for
1 damage and
2 indicator is
provided
uninsulated knob)
Welding cables
connected to the No damage in the
3 welding machine 4 insulation of
with lugs at the welding cables
joints
No internal live
electrical parts of 30MA ELCB should Trolley without
7 welding machine is
8
damaged wheels
be used.
exposed
Fire extinguisher or
9 fire bucket with
sand availability
4 5
2
6 7
1
8 3
SL SL
NO
CHECK ITEM PHOTOS Y/N NO
CHECK ITEM PHOTOS
Availability of
industrial type
9 lighter(no match
box / commercial
lighters).
Date
Y/N
DATE
Weekly Check sheet For Cherry Picker
10
3
9
5
7
1
10 6
2
6
1
Date
REMARKS
MONTHLY CHECKLIST FOR SAFETY BELT
1.2m
6
4
2 5
3
1
1 2 3 4 5 6 7
inspect
harness webbing for
Harness is full body Safety harness is cuts, tears, burns and
Harness is ISI No damage in the Hook in the lanyard is
Safety with double lanyard Lanyard length is not made of Polyester abrasion damage
Sl. No. certified and tested lanyard and lanyard in working condition
Belt No. ( separate lanyard more than 1.2m with polyamide Fiber especially where
by manufacturer. joints. and with out damage
fixed in D-ring) rope there is contact with
hardware
NAME SIGNATURE
Checked by Safety in charge
KLIST FOR SAFETY BELT
9
8
Month
8 9
No
damage in the
Check for damage due following element--
to contact with heat, 1. Brace.
paint, solvents or corros 2.Secondary Strap.
ives 3. Under bottom strap.
4.Thight strap.
5.Tightening element.
6.Coupling element
DATE
Inspection sheet for Air Compressor
10
11
3
Date
S.No Check Points Remarks
Ok Not Ok N/A
8
A Engine
5 Battery Condition
B Compressor
6 Air Filter
7 Oil Level
8 Pressure Gauges
9 Air Receiver
10 Safety Valve
11 Hose Condition
Safety Officer