After rotating heads, press ENTER to retrieve data.

If bolt bound,
press " or # to
view alternate
moves.

STEP 4: View Data


This provides a graphic display of how your results
Other Useful Information:

Extensive on-line help is available for each step of the


ProAlign Plus
compare to the specified tolerance levels. If you
are within the two bands in the lower left corner,
the job is complete. (Example shown is for direct-
alignment process. Simply press the HELP key for
complete, context sensitive user guidance. Quick Guide
coupled machines.)
Job Storage and Transfer:
OPTIONS + STORE JOB saves data.

UTILITY + COMMUNICATIONS +
HOST PC LOAD/DUMP to transfer data to and from a
PC (using UltraMgr). When downloading an
alignment job from a PC, set-up data is automatically
transferred. Review readings and notes and then
toggle “CLEAR JOB” to “YES” to clear “READINGS
& NOTES ONLY” to begin new job without deleting
set-up data.
STEP 5: Machine Moves
The MACHINE MOVES screen indicates how much Consult manual for complete instructions.
to move each foot.

Press INS to per- www.mhm.assetweb.com


form a live move.

The Bull’s eye


shows job status:

Center = Excellent
1 st Ring = Acceptable
2 nd Ring = Close
Set-up: Fixtures and Analyzer Identify the Machines as appropriate. Machine Press DEL to start. Refer to the online help mes-
naming helps eliminate confusion. sages for complete soft foot process.

After checking all feet, press ENTER for results. Use


feeler gauge to determine shim correction.
X = SOFT; XX = VERY SOFT; XXX = EXTREME.

Confirm whether head A is located on the left or right


machine. Note: Setup screen defaults to Head A on
To use this quick reference guide, make sure that the left.
your analyzer and fixtures are set-up as shown.
STEP 3: Alignment Data
Note: Use 8000RF in place of cables for cableless CSI recommends that you rotate the shaft in the
operation. same direction as the machine rotates.

To set up the analyzer, press OPTIONS + Place the laser heads at the starting position and
ALIGNMENT SETUP and choose the appropriate press ENTER. The bar graph display indicates when
options. each head is ready for measurement.

Enter machine dimensions as shown in the diagram.


Use $ and % to move between values. Press ENTER
when complete.

To collect data, rotate heads.


STEP 1: Job Definition
When defining the job, JOB# and RPM must be The LED’s on the face of the Laser provide a
specified. Additional entries are optional for job continuous status update.
definition. Note: Use the slash
(/) to enter fractions
1 4 • 7 / 8
Ex. 14 7/8 = Solid Green = Good Operation
Solid Yellow = Minor Error
STEP 2: Foot Pre-Check Flashing Yellow = Low Battery Warning
CSI recommends that you perform a soft foot check Solid Red = Major Error
before attempting alignment. Use any key to toggle
answer to “YES”.