CONTRACTOR COMPANY
REV. DESCRIPTION DATE
PREPARED CHECK APPROVED CHECK APPROVED
PERTAMINA EP CEPU
REVISION HISTORICAL SHEET
8. RESULT ......................................................................................................................................... 12
8.1 Stress Output ....................................................................................................................... 12
8.2 The Maximum Displacement ............................................................................................... 12
8.3 Restraint Summary .............................................................................................................. 12
8.4 Nozzle Load Check ............................................................................................................. 13
8.5 Flange Leakage Assessment .............................................................................................. 13
8.6 Dynamic Analysis Piping Natural Frequency for Piping System .................................. 14
9. CONCLUSION ............................................................................................................................... 14
1.1 Scope
This document is covered flexibility analysis for Piping System from SO2 Stripper Train A
(322-T1007) To SO2 Stripper Reboiler Train A (322-E1013) in 322 Unit for JTB Project.
1.2 Purpose
The propose of this calculation is design adequacy check of the piping system by the
following:
To analyze and check the stress compliance of the selected piping system with code
of ASME B31.3 due to hydrotest, sustained, expansion, and occasional load.
To obtain load on supports which are modelled with node number for each support
location and types.
To verify loads on nozzle of equipments those are connected to the piping system
selected.
To check vibration piping system.
2.1 Definition
COMPANY PT. PERTAMINA EP CEPU (PEPC)
PROJECT Gas Development Project for the Unitization of the Jambaran –
Tiung Biru Field
CONTRACTOR Consortium of PT Rekayasa Industri – JGC Corporation, PT JGC
Indonesia
2.2 Abbreviation
API American Petroleum Institute
ASME American Society of Mechanical Engineers
SMYS Specified Minimum Yield Strength
SMTS Specified Minimum Tensile Strength
W Weight
WW Weight Filled Water
WNC Weight no Content
HP Hydro Test Pressure
P1 Design Pressure
P2 Maximum Operating Pressure
Document No. : JTB-RJJ000-L0-CAL-322-00007
Revision :A
Contractor Doc. No.: C-J130-1362-R2207 Page 5 of 23
P3 Normal Operating Pressure
T1 Design Temperature
T2 Maximum Operating Temperature
T3 Normal Operating Temperature
U1 Seismic Acceleration Along X Axis
U2 Seismic Acceleration Along Y Axis
U3 Seismic Acceleration Along Z Axis
Win1 Wind in + X direction
Win2 Wind in - X direction
Win3 Wind in + Z direction
Win4 Wind in - Z direction
L Load Case
HYD Hydrostatic test load case
SUS Sustained load case
OPE Operating load case
EXP Thermal load case
OCC Occasional load case
MAX Maximum Values
ABS Sum of Absolute Values
SRSS Resultant of Seismic Acceleration
3. REFERENCE
Service pressure and temperature of piping systems are presented in the table below:
SO2 Stripper
322-CNL- SO2 Stripper
Reboiler Train
1024-12"- Train A
A
60 11.4 11.4 300 245 245 90 66.4
01G0-H30 (322-T1007)
(322-E1013)
410-SL-1006-
322-SL-1001-
16"-01A1- LP Steam Header
16"-01A1-H
75 50 50 400 299 299 112.5 0.2
H51
SO2 Stripper
322-SL-1001-
410-SL-1006-16"- Reboiler Train
16"-01A1-
01A1-H A
75 50 50 400 299 299 112.5 0.2
H30
(322-E1013)
322-SCL- SO2 Stripper Steam
1001-8"- Reboiler Train A Condensate 75 50 50 300 230 230 112.5 57.4
01A1-H30 (322-E1013) Return Header
SO2 Stripper
322-CNL- SO2 Stripper
Reboiler Train
1024-12"- Train A
A
414 79 79 149 119 119 621 1063.6
01G0-H30 (322-T1007)
(322-E1013)
410-SL-1006-
322-SL-1001-
16"-01A1- LP Steam Header
16"-01A1-H
518 345 345 205 149 149 776 3.2
H51
SO2 Stripper
322-SL-1001-
410-SL-1006-16"- Reboiler Train
16"-01A1-
01A1-H A
518 345 345 205 149 149 776 3.2
H30
(322-E1013)
322-SCL- SO2 Stripper Steam
1001-8"- Reboiler Train A Condensate 518 345 345 149 110 110 776 919.5
01A1-H30 (322-E1013) Return Header
5.1 Temperature
Standard installation temperature to be used for thermal stress analysis shall be 21.7°C.
Stress Summary
Highest Allowable
Ratio
Load Case Node Stress Stress
(%)
(KPa) (KPa)
Comply with Code
(HYD) WW+HP+H 520 43642.6 206838.0 21.1
(SUS) W+P1+H 10200 45469.5 137890.8 33.0 Not Comply
(OCC) L7+L25 10200 45469.5 183394.8 24.8
(OCC) L7+L26 520 66223.3 183385.1 36.1 Piping Code:
(OCC) L7+L27 10200 45504.6 183394.8 24.8 ASME B31.3
(OCC) L7+L28 10200 45518.8 183394.8 24.8
(EXP) L4-L7 10560 105860.7 334788.7 31.6
(EXP) L5-L8 10560 71251.5 335655.7 21.2
(EXP) L6-L9 10400 84341.9 333957.7 25.3
The results are furnished in attachment 5 Code Stress Summary Report.
Nozzle
Force (kg) Moment (kg m)
Equipment Size Node Condition
Class FX FY FZ MX MY MZ
322-E1013 28" MAX (T2, T3) 1922 2355 -638 1218.2 -318.1 -692.1
(Outlet) 150# Allowable
8020 2514 2514 2514 5689 5689 5689
Nozzle
Result PASSED PASSED
322-E1013 12" MAX (T2, T3) -636 -351 -274 102.2 -783.0 37.8
(Inlet) 150# Allowable
8090 909 909 909 1259.7 1259.7 1259.7
Nozzle
Result PASSED PASSED
322-E1013 16" MAX (T2, T3) -120 489 -505 493.3 66.6 413.6
(Inlet) 150# Allowable
8140 1284 1284 1284 2070.1 2070.1 2070.1
Nozzle
Result PASSED PASSED
322-E1013 8" MAX (T2, T3) -152 297 16 -128.3 -124.9 13.8
(Outlet) 150# Allowable
8170 559 559 559 629.9 629.9 629.9
Nozzle
Result PASSED PASSED
Nozzle
Force (kg) Moment (kg m)
Equipment Size Node Condition
Class FX FY FZ MX MY MZ
322-T1007 24" MAX (T1, T2, T3) -339 -1229 97 533.5 1179.0 -741.9
(N2Inlet) 150# Allowable
8050 2937 - - - 3524 4581
Nozzle
Result PASSED PASSED
322-T1007 12" MAX (T1, T2, T3) 49 1195 565 667.1 -286.8 -86.3
(N3 Outlet) 150# Allowable
8060 - - 1468 1145.3 881 -
Nozzle
Result PASSED PASSED
For detail result of piping natural frequency are presented in the Attachment 10.
9. CONCLUSION
The conclusions of analysis are summarized as follows:
Maximum stresses induced in the piping system for SO2 Stripper Train A (322-
T1007) to SO2 Stripper Reboiler Train A (322-E1013) in 322 Unit for Jambaran-Tiung
Biru Field Project compiled in para 7.1 are within allowable stress limit for sustain,
expansion, occasional and hydrostatic test conditions, and have complied with ASME
B31.3 Standard Code.
Recommended pipe support type and location shall be applied into piping layout
drawing.
Pipe natural frequency of this piping system has been verified with the requirement
greater than 4Hz.
The piping system is considered “ACCEPTABLE” (OK).