earlier proposed

hvac cable from route not reqd


cable to be
hvac db to roof
supported after
shall be laid at ele.
laying below floor
100.190 in existing
cut-out suit to site
tray
existing switch and
light on outer wall
of substation

cable shall rise at


this location from new tray at ele.
ele.100.190 100.240 by
existing tray to new airmech
tray at ele.100.240
new tray to be laid at this
elevation (after the existing
tray takes a bend) which shall
cross the fence and come
outside the cellar area.

cable to be laid in
the tray till the tray
takes a turn

hvac db cable from


panel to this
existing tray
new cable tray route, switch and
light fixture shall be avoided