8. PVC and uPVC shall be moldex or equivalent approved quality.

9. Panel board shall be approved type, with copper busbar.


GENERAL NOTES: 10. Wiring devices (switches and outlets) shall be toshiba or equivalent.
11. Wires and cables shall be duraflex philflex Columbia or approved equivalent.
All works must be done in accordance with this Plan and Specification and shall be
conformity with the latest edition of the Philippine Electrical Code (PEC) requirements of
the enforcing authorities and requirements of the local power company.
LEGENDS:
A duly Licensed electrical Engineer or Master Electrician shall be in charge of the
Installation during construction. Pin light Sabc 3-GANG SWITCH
Sab 2-GANG SWITCH
CEILING MOUNTED LIGHTING OUTLET
1. All parts of electric equipment shall be properly and effectively grounded. AIRCON OUTLET
2. Service voltage to the building shall be 230V, PH 1,2w,60H. CONVENIENCE OUTLET S3w 3- way Switch
3. Minimum size of wore and conduit shall be 2.0mm TW copper and 15mmØ (I.D.) FLOURESCENT LAMP S1 Single Switch
respectively. switch contour
4. For each spare circuiting the panel board provide empty 20mm inside Ø pvc REF REFRIGERATOR OUT LET
RANGE OUTLET Telephone Outlet
terminating in a 100mm octagon box above ceiling. RANGE
Tel

5. No revision in the design shall be done without written consent of the signing PANEL BOX fan line
professional Electrical Engineer, only revision done without such approval shall CIRCUIT HOMERUN power line
cause responsibility of the pee to cease as a whole. SERVICE ENTRANCE circuit number
6. Mounting heights (from horizontal centerline) shall be. CIRCUITRY RUN THRU CEILING switch line
Panel Board = 1370mm (4'-0") CIRCUITRY RUN THRU WALL ceiling fan
Switches = 1370mm (4'-0") CIRCUIT BREAKER SF switch for fan
Outlet = 460mm (18")
KWHM = 1520mm (5'-0")
7. All materials shall be new and approved type circuit breakers General Electric "GE".
8. PVC and uPVC shall be moldex or equivalent approved quality.
9. Panel board shall be approved type, with copper busbar.
SCHEDULE OF LOADS
PB G/F
LOCATION: GROUND FLOOR
CKT. No. of
NO. DESCRIPTION OUTLET WATTS VOLTS AMPS CB SIZE OF WIRE & CONDUIT
PANEL BOX
1 LIGHTING OUTLET 11 1100 230 4.78 20AT 3.5mm² THHN +2.0TW gnd, 20mmØ PVC
2 LIGHTING OUTLET 9 900 3.91 20AT 3.5mm² THHN +2.0TW gnd, 20mmØ PVC
3 LIGHTING OUTLET 10 1000 4.35 20AT 3.5mm² THHN +2.0TW gnd, 20mmØ PVC
4 LIGHTING OUTLET 10 1000 4.35 20AT 3.5mm² THHN +2.0TW gnd, 20mmØ PVC
5
6 LIGHTING OUTLET 7 700 3.04 20AT 3.5mm² THHN +2.0TW gnd, 20mmØ PVC
7 CONVENIENCE OUTLET 5 900 3.91 20AT
8 CONVENIENCE OUTLET 4 720 3.13 20AT
9 SPARE 1 2000 20AT
10 SPARE 1 2000
TOTAL 11820 230 33.99

P = 1.73VI Use: 50 AT 3ph 230V Industrial type


I = 11820 / 1.73 * 230 * 0.80 3 - 22.0 sqmm THHn +14 sqmm TW gnd
I = 37.13 A 1 - 1/4" DIA IMC pipe
all Branches are 1 phase and bolt on type NEMA 1 encl. wall mounted

PROJECT TITLE: DRAFTED BY: CHECKED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET CONTENT: SHEET NO.:

REPUBLIC OF THE PHILIPPINES


PROPOSED CONSTRUCTION OF
DEPARTMENT OF INTERIOR AND LOCAL GOVERNMENT
BUREAU OF JAIL MANAGEMENT AND PENOLOGY Gerald G Baloyos MARICAR C GONZALES RENZ JOSEPH D BASCUGIN JOLLY C TAGUIAM JR E-3
UPPER DOONGAN, BUTUAN CITY ONE - STOREY ISOLATION FACILITY Jail Officer 2 JMP Jail Senior Inspector (RCE) JMP Jail Chief Inspector JMP Jail Chief Superintendent DSC AS SHOWN
PROJECT ADDRESS:
Bislig City Jail, Villa Josefa Subd., Bislig City
Staff, Logistics Division Regional Engineer Chief, Logistics Division Regional Director of the Jail Bureau 16 16
A B C D

1'

1 co
co
co
7
co PB

co
co

co
3 co
8
3'

POWER LAYOUT
SCALE 1:75

PROJECT TITLE: DRAFTED BY: CHECKED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET CONTENT: SHEET NO.:

REPUBLIC OF THE PHILIPPINES


PROPOSED CONSTRUCTION OF
DEPARTMENT OF INTERIOR AND LOCAL GOVERNMENT
BUREAU OF JAIL MANAGEMENT AND PENOLOGY Gerald G Baloyos MARICAR C GONZALES RENZ JOSEPH D BASCUGIN JOLLY C TAGUIAM JR E-2
UPPER DOONGAN, BUTUAN CITY ONE - STOREY ISOLATION FACILITY Jail Officer 2 JMP Jail Senior Inspector (RCE) JMP Jail Chief Inspector JMP Jail Chief Superintendent DSC AS SHOWN
PROJECT ADDRESS:
Bislig City Jail, Villa Josefa Subd., Bislig City
Staff, Logistics Division Regional Engineer Chief, Logistics Division Regional Director of the Jail Bureau 15 16
A B C D

j j j

1' h Sf
f e
Sh g
Sg j

1 i Se
Shij
h
4
i

Sabc
Sci PB-GF a b c
d a
Sgf
c
Sd 1 d

g f
e
Sabj
2 j

h c LAV
e e
g f

d
b d a
g b Sed Sgf
a b c

2
f a Sabc
Sfgh Sabc Shij
3 b
h 3 i
j

3'
j j j
6

LIGHTING LAYOUT
SCALE 1:75

PROJECT TITLE: DRAFTED BY: CHECKED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET CONTENT: SHEET NO.:

REPUBLIC OF THE PHILIPPINES


PROPOSED CONSTRUCTION OF
DEPARTMENT OF INTERIOR AND LOCAL GOVERNMENT
BUREAU OF JAIL MANAGEMENT AND PENOLOGY Gerald G Baloyos MARICAR C GONZALES RENZ JOSEPH D BASCUGIN JOLLY C TAGUIAM JR E-1
UPPER DOONGAN, BUTUAN CITY ONE - STOREY ISOLATION FACILITY Jail Officer 2 JMP Jail Senior Inspector (RCE) JMP Jail Chief Inspector JMP Jail Chief Superintendent DSC AS SHOWN
PROJECT ADDRESS:
Bislig City Jail, Villa Josefa Subd., Bislig City
Staff, Logistics Division Regional Engineer Chief, Logistics Division Regional Director of the Jail Bureau 14 16
SPECIFICATION:
1. ALL PLUMBING WORKS SHALL BE DONE IN ACCORDANCE WITH THE LATEST 10"(0.25) copper screen
10mmØ PLAIN BAR
PROVISIONS OF THE NATIONAL BUILDING CODE. MANHOLE HANDLE
500mm X 500mm
50 mm thk PRE-FAB
2. WASTE PIPE LINES MUST BE INSTALLED AT 2% OR 20mm DEGREE PER METER RUN. CONC MANHOLE W/
3. ALL PIPES TO BE USED MUST 4" Ø uPVC PIPE FOR WASTE WATER & DOWNSPOUT, 2"(0.015) lower
4-10mm BARS
BOTHWAYS
3" Ø FOR VENT LINE.
4. ALL PLUMBING INSTALLATIONS SHALL BE DONE UNDER THE DIRECT SUPERVISION
4"(0.10)Sanitary tee
OF A MASTER PLUMBER OR SANITARY ENGINEER.
DETAIL OF MAN HOLE
NOT TO SCALE

PLUMBING LEGEND: 350mmX 350mm


50mm Thk PRE-FAB
WASTE PIPE CB CATCH BASIN 0.05 CONC MANHOLE W/
3-10mmØ BARS
BOTHWAYS
CO CLEAN OUT 0.50
DRAIN PIPE 2-10mmØ HOR
CV CHECK VALVE BARS W/ 10mmØ
6''C RC DRAINAGE PIPE GV GATE VALVE 0.50 0.40 VERT BARS

WC WATER CLOSET WM WATER METER 0.50 150mmØ RC


3-10mmØ BASE
DRAINAGE PIPE
BARS,BOTHWAYS
CP CLEARWATER PIPE
LAV LAVATORY 100mm thk COMPACTED GRAVEL

SH SHOWER WP WASTE PIPE 0.10


PLAN SECTION
KS KITCHEN SINK DP DRAINAGE PIPE
F FAUCET RCP REINFORCED CONCRETE PIPE DETAIL OF CATCH BASIN
NOT TO SCALE
FD FLOOR DRAIN
VTR VENT STACK THRU ROOF

100mm thk. FLOOR SLAB with 12mmØ


RSB spaced @ 0.15m o.c. bw. USE 12mmØ ver.bar spaced.
spaced @ every three layers
B MANHOLE CO MANHOLE CO MANHOLE CO
@ 800mm o.c. and 12mm hor.bar
CO

0.30 AIR SPACE 0.30 INLET


WATER LINE WATER LINE
OUTLET

CO DIGESTIVE CHAMBER
A MANHOLE MANHOLE MANHOLE
A 0.50 1.50 2.00 1.50 2.00 1.50 DIGESTIVE CHAMBER
CHAMBER CHAMBER
LEACHING LEACHING
INLET
CO CO
OUTLET

B
1.50 0.75 0.75 1.50 0.75 0.75 1.50
USE 4''CHB With plastered on single face
3.00 3.00

SEPTIC TANK PLAN SECTION A - A SECTION B - B


NOT TO SCALE NOT TO SCALE NOT TO SCALE

PROJECT TITLE: DRAFTED BY: CHECKED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET CONTENT: SHEET NO.:

REPUBLIC OF THE PHILIPPINES


PROPOSED CONSTRUCTION OF
DEPARTMENT OF INTERIOR AND LOCAL GOVERNMENT
BUREAU OF JAIL MANAGEMENT AND PENOLOGY Gerald G Baloyos MARICAR C GONZALES RENZ JOSEPH D BASCUGIN JOLLY C TAGUIAM JR P-3
UPPER DOONGAN, BUTUAN CITY ONE - STOREY ISOLATION FACILITY Jail Officer 2 JMP Jail Senior Inspector (RCE) JMP Jail Chief Inspector JMP Jail Chief Superintendent DSC AS SHOWN
PROJECT ADDRESS: Staff, Logistics Division Regional Engineer Chief, Logistics Division Regional Director of the Jail Bureau 13 16
Bislig City Jail, Villa Josefa Subd., Bislig City
A B C D

1/2"Ø CWP 3/4"Ø CWP DL

1'
SH SH

1 F
SEPTIC
TANK
1/2"Ø CWP
F

WC

1/2"Ø CWP SH
3/4"Ø CWP DL
2
SH F

3/4"Ø CWP DL
SH

WC

3
3'
3/4"Ø CWP DL
To Water Storage Tank

WATER LAYOUT
SCALE 1:75

PROJECT TITLE: DRAFTED BY: CHECKED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET CONTENT: SHEET NO.:

REPUBLIC OF THE PHILIPPINES


PROPOSED CONSTRUCTION OF
DEPARTMENT OF INTERIOR AND LOCAL GOVERNMENT
BUREAU OF JAIL MANAGEMENT AND PENOLOGY Gerald G Baloyos MARICAR C GONZALES RENZ JOSEPH D BASCUGIN JOLLY C TAGUIAM JR P-2
UPPER DOONGAN, BUTUAN CITY ONE - STOREY ISOLATION FACILITY Jail Officer 2 JMP Jail Senior Inspector (RCE) JMP Jail Chief Inspector JMP Jail Chief Superintendent DSC AS SHOWN
PROJECT ADDRESS: Staff, Logistics Division Regional Engineer Chief, Logistics Division Regional Director of the Jail Bureau 12 16
Bislig City Jail, Villa Josefa Subd., Bislig City
A B C D
To Drainage To Drainage To Drainage To Drainage

C.B.

C.B.
1'

C.B.
DS
FD
FD FD

1 LAV
SEPTIC
TANK

6"Ø RCP
6"Ø RCP
LAV

WC

FD

C.B.
DS
FD LAV FD

WC WC

6"Ø RCP
LAV

3
3'

C.B.
DS
PLUMBING LAYOUT
SCALE 1:75

PROJECT TITLE: DRAFTED BY: CHECKED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET CONTENT: SHEET NO.:

REPUBLIC OF THE PHILIPPINES


PROPOSED CONSTRUCTION OF
DEPARTMENT OF INTERIOR AND LOCAL GOVERNMENT
BUREAU OF JAIL MANAGEMENT AND PENOLOGY Gerald G Baloyos MARICAR C GONZALES RENZ JOSEPH D BASCUGIN JOLLY C TAGUIAM JR P-1
UPPER DOONGAN, BUTUAN CITY ONE - STOREY ISOLATION FACILITY Jail Officer 2 JMP Jail Senior Inspector (RCE) JMP Jail Chief Inspector JMP Jail Chief Superintendent DSC AS SHOWN
PROJECT ADDRESS: Staff, Logistics Division Regional Engineer Chief, Logistics Division Regional Director of the Jail Bureau 11 16
Bislig City Jail, Villa Josefa Subd., Bislig City
4" thk. CHB with 10mmØ
Vert. Bars @ 0.60m o.c.
& Hor. Bars @ every 3
layers.

0.60 0.80

0.20
SCHEDULE OF FOOTINGS
THK. SIZE (m) BOTTOM BARS DEPTH OF
MARK (mm) REMARKS
WIDTH LENGTH BAR 'S' BAR 'L' EXCAVATION 3 - 10mmØ Longi. Bars
F1 200 1.20 2.40 8 - 12mmØ 16 - 12mmØ 1.20m from NGL COMBINED FOOTING & 10mmØ Lateral Ties
F2 200 1.20 1.20 6 - 12mmØ 6 - 12mmØ 1.20m from NGL ISOLATED FOOTING 0.40
@ 0.30m o.c.
VERIFY FOUNDATION PLAN
WALL FOOTING DETAIL
NOT TO SCALE

WALL FOOTING DETAIL


SCHEDULE OF COLUMNS SCHEDULE OF BEAMS GRID
C1 TB/B1 B2
VERIFY STRUCTURAL PLAN

VERIFY STRUCTURAL PLAN

VERIFY STRUCTURAL PLAN


0.10m thk. Slab
FFL on Grade

0.60 Use: 6" CHB with


10mmØ Hor. Bars
SIZE: 300 mm x 300 mm SIZE: 200 mm x 400 mm SIZE: 200 mm x 300 mm NGL spaced @ every 3
VERT. BARS: 8 - 12mmØ VERT. BARS: 6 - 12mmØ VERT. BARS: 4 - 12mmØ layers and 10mmØ
Vert. Bars spaced
TIES: 1 - 10mmØ / SETS TIES: 1 - 10mmØ / SETS TIES: 1 - 10mmØ / SETS
@ 0.60m on center
3 @ 50mm., 3 @ 100mm., 3 @ 50mm., 3 @ 100mm., 3 @ 50mm., 3 @ 100mm., 1.00
1.20
5 @ 150mm., REST @ 3 @ 150mm., REST @ 3 @ 150mm., REST @ SEE TIE BEAM DETAIL
200mm. o.c. 200mm. o.c. 200mm. o.c.
0.20

0.30

TIE BEAM DETAIL


NOT TO SCALE

PROJECT TITLE: DRAFTED BY: CHECKED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET CONTENT: SHEET NO.:

REPUBLIC OF THE PHILIPPINES


PROPOSED CONSTRUCTION OF
DEPARTMENT OF INTERIOR AND LOCAL GOVERNMENT
BUREAU OF JAIL MANAGEMENT AND PENOLOGY Gerald G Baloyos MARICAR C GONZALES RENZ JOSEPH D BASCUGIN JOLLY C TAGUIAM JR S-4
UPPER DOONGAN, BUTUAN CITY ONE - STOREY ISOLATION FACILITY Jail Officer 2 JMP Jail Senior Inspector (RCE) JMP Jail Chief Inspector JMP Jail Chief Superintendent DSC AS SHOWN
PROJECT ADDRESS:
Bislig City Jail, Villa Josefa Subd., Bislig City
Staff, Logistics Division Regional Engineer Chief, Logistics Division Regional Director of the Jail Bureau 10 16
A B C D

13.00

6.00 1.50 5.50

2.00 2.00 1.15 4.35 1.15

0.85

RAFTER

1'
1.50 1.50
1 0.80
1.50
0.70
3.50 3.50
1.00

1.00
2 9.70 10.00
1.00

1.00
3.50 3.50

1.50
3
1.20 1.50
3'
C PURLINS
USE:
1. 0.4mm thk. Rib Type Roofing,
Gutter & Flashing.
2. 3 - 50mm x 150mm Good Lumber
for Rafter. 1.20 4.80 1.50 4.35
3. 50mm x 75mm Good Lumber
spaced @ 0.60m o.c. 6.00 5.85 1.15
4. 25mm x 25mm Good Lumber for
Fascia 13.00
6. 3/4" thk. Marine Plywood for Fascia

ROOF FRAMING PLAN


SCALE: 1:100

PROJECT TITLE: DRAFTED BY: CHECKED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET CONTENT: SHEET NO.:

REPUBLIC OF THE PHILIPPINES


PROPOSED CONSTRUCTION OF
DEPARTMENT OF INTERIOR AND LOCAL GOVERNMENT
BUREAU OF JAIL MANAGEMENT AND PENOLOGY Gerald G Baloyos MARICAR C GONZALES RENZ JOSEPH D BASCUGIN JOLLY C TAGUIAM JR S-3
UPPER DOONGAN, BUTUAN CITY ONE - STOREY ISOLATION FACILITY Jail Officer 2 JMP Jail Senior Inspector (RCE) JMP Jail Chief Inspector JMP Jail Chief Superintendent DSC AS SHOWN
PROJECT ADDRESS: Staff, Logistics Division Regional Engineer Chief, Logistics Division Regional Director of the Jail Bureau 9 16
Bislig City Jail, Villa Josefa Subd., Bislig City
A B C D

13.00

6.00 1.50 5.50

3.00 3.00 2.75 2.75

ROOFLINE

B2 B2 B2
1'
1.50 B1 B1 B1 B1 1.50
B1 B1 B1 B1 B1
1

3.50 B1 B1 B1 B1 B1 B1 3.50

B1 B1 B1 B1 B1
2 10.00 10.00

3.50 B1 B1 B1 B1 B1 B1 3.50

B1 B1 B1 B1 B1
3
B1 B1 B1 B1
1.50 1.50
3' B2 B2 B2

3.00 3.00 2.75 2.75

6.00 1.50 5.50

13.00

BEAM FRAMING PLAN


SCALE: 1:100

PROJECT TITLE: DRAFTED BY: CHECKED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET CONTENT: SHEET NO.:

REPUBLIC OF THE PHILIPPINES


PROPOSED CONSTRUCTION OF
DEPARTMENT OF INTERIOR AND LOCAL GOVERNMENT
BUREAU OF JAIL MANAGEMENT AND PENOLOGY Gerald G Baloyos MARICAR C GONZALES RENZ JOSEPH D BASCUGIN JOLLY C TAGUIAM JR S-2
UPPER DOONGAN, BUTUAN CITY ONE - STOREY ISOLATION FACILITY Jail Officer 2 JMP Jail Senior Inspector (RCE) JMP Jail Chief Inspector JMP Jail Chief Superintendent DSC AS SHOWN
PROJECT ADDRESS: Staff, Logistics Division Regional Engineer Chief, Logistics Division Regional Director of the Jail Bureau 8 16
Bislig City Jail, Villa Josefa Subd., Bislig City
A B C D

13.00

3.00 6.00 1.50 5.50

ROOFLINE

1' WF WF WF WF
1.50 Elev. = 0.60m Elev. = 0.60m 1.50
C1/F2 C1/F1 C1/F2
TB TB
1
Use: 10mmØ DRB spaced @
3.50 TB 0.30m o.c. bothways. & 100mm TB TB Elev. = 0.60m TB 3.50
thk. Slab Finished Floor.
Elev. = 0.60m
C1/F2 C1/F1 C1/F2
2 10.00 WF TB TB
10.00

Elev. = 0.60m
3.50 TB TB TB Elev. = 0.60m TB 3.50

C1/F2 C1/F1 C1/F2


TB TB
3
Elev. = 0.60m Elev. = 0.60m
1.50 1.50
3' WF WF WF WF

6.00 1.50 5.50

3.00 13.00

FOUNDATION PLAN
SCALE: 1:100

PROJECT TITLE: DRAFTED BY: CHECKED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET CONTENT: SHEET NO.:

REPUBLIC OF THE PHILIPPINES


PROPOSED CONSTRUCTION OF
DEPARTMENT OF INTERIOR AND LOCAL GOVERNMENT
BUREAU OF JAIL MANAGEMENT AND PENOLOGY Gerald G Baloyos MARICAR C GONZALES RENZ JOSEPH D BASCUGIN JOLLY C TAGUIAM JR S-1
UPPER DOONGAN, BUTUAN CITY ONE - STOREY ISOLATION FACILITY Jail Officer 2 JMP Jail Senior Inspector (RCE) JMP Jail Chief Inspector JMP Jail Chief Superintendent DSC AS SHOWN
PROJECT ADDRESS: Staff, Logistics Division Regional Engineer Chief, Logistics Division Regional Director of the Jail Bureau 7 16
Bislig City Jail, Villa Josefa Subd., Bislig City
A B C D

13.00

6.00 1.50 5.50

2.00 2.00 1.15 3.50 2.00

0.85
ROOFLINE

1'
1.40 1.00 FF2 FF2 1.50

1 FF1
0.40 0.80
1.50
FF1 0.70
3.50 FF1 3.50
FF2 2.00

FF1

FF3
2 9.60 10.00

FF2 FF2 2.00


3.50 FF1 3.50
FF1
1.50
3
1.20
FF1 1.50
3'
USE:
FF1 - 0.60m x 0.60m Floor Tile.
FF2 - 0.30m x 0.30m Floor & Wall Tile
1.20 4.80 1.50 3.50

6.00 5.00 2.00

13.00

CEILING FRAMING PLAN


SCALE: 1:100

PROJECT TITLE: DRAFTED BY: CHECKED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET CONTENT: SHEET NO.:

REPUBLIC OF THE PHILIPPINES


PROPOSED CONSTRUCTION OF
DEPARTMENT OF INTERIOR AND LOCAL GOVERNMENT
BUREAU OF JAIL MANAGEMENT AND PENOLOGY Gerald G Baloyos MARICAR C GONZALES RENZ JOSEPH D BASCUGIN JOLLY C TAGUIAM JR A-6
UPPER DOONGAN, BUTUAN CITY ONE - STOREY ISOLATION FACILITY Jail Officer 2 JMP Jail Senior Inspector (RCE) JMP Jail Chief Inspector JMP Jail Chief Superintendent DSC AS SHOWN
PROJECT ADDRESS: Staff, Logistics Division Regional Engineer Chief, Logistics Division Regional Director of the Jail Bureau 6 16
Bislig City Jail, Villa Josefa Subd., Bislig City
A B C D

13.00

6.00 1.50 5.50

2.00 2.00 1.15 4.35 1.15

0.85

1'
1.50 1.10 1.50

1 0.40 0.80
1.50
0.70
3.50 3.50
1.00

1.00
2 10.00 10.00
1.00

1.00
3.50 3.50

1.50
3
1.50 1.50
3'

USE:
1. 50mm x 50mm Good Lumber
spaced @ 0.60m o.c bothways. 1.20 4.80 1.50 4.35
2. 1/4" thk. Marine Plywood.
3. 4' x 8' Steel Matting 6.00 5.85 1.15

13.00

CEILING FRAMING PLAN


SCALE: 1:100

PROJECT TITLE: DRAFTED BY: CHECKED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET CONTENT: SHEET NO.:

REPUBLIC OF THE PHILIPPINES


PROPOSED CONSTRUCTION OF
DEPARTMENT OF INTERIOR AND LOCAL GOVERNMENT
BUREAU OF JAIL MANAGEMENT AND PENOLOGY Gerald G Baloyos MARICAR C GONZALES RENZ JOSEPH D BASCUGIN JOLLY C TAGUIAM JR A-5
UPPER DOONGAN, BUTUAN CITY ONE - STOREY ISOLATION FACILITY Jail Officer 2 JMP Jail Senior Inspector (RCE) JMP Jail Chief Inspector JMP Jail Chief Superintendent DSC AS SHOWN
PROJECT ADDRESS: Staff, Logistics Division Regional Engineer Chief, Logistics Division Regional Director of the Jail Bureau 5 16
Bislig City Jail, Villa Josefa Subd., Bislig City
5.30 3.30 3.10 1.75 1.30 1.10

WG2 WG3 WG4 WG5 WG6 WG7


0.95 5300mm 3300mm 3100mm 1750mm 1300mm 1100mm

1.65 Use:
1. 6mm thk. x 50mm x 50mm Angle Bar for Steel Frame.
2. 20mmØ Round Bar for Horizontal & Vertical Supports.
FLOOR LINE

Description : Window Grilles 2 Description : Window Grilles 3 Description : Window Grilles 4 Description : Window Grilles 5 Description : Window Grilles 6 Description : Window Grilles 7
Location : Floor Plan Location : Floor Plan Location : Floor Plan Location : Floor Plan Location : Floor Plan Location : Floor Plan
Required : 2 Sets Required : 1 Set Required : 2 Sets Required : 2 Sets Required : 1 Set Required : 2 Sets

5.80 3.10 1.30 5.80

0.95
SG1 SG2 SG3
2.00 5800mm 3100mm 1300mm
WG1
5800mm

1.65 Use:
1. 6mm thk. x 50mm x 50mm Angle Bar for Steel Frame.
2. 20mmØ Round Bar for Horizontal & Vertical Supports.
0.60
FLOOR LINE

Description : Steel Grilles 1 Description : Steel Grilles 2 Description : Steel Grilles 3 Description : Window Grilles 1
Location : Floor Plan Location : Floor Plan Location : Floor Plan Location : Floor Plan
Required : 1 Set Required : 1 Set Required : 1 Set Required : 1 Set

1.50 0.90 0.80 0.70 1.00 0.90

Use:
1. 150mm Rectangular
Tube for Steel Frame.
2. 20mmØ Round Bar Use:
for Horizontal & 1. 50mm x 50mm Angle
D1 D2 D3 D4 SD Vertical Supports.
DG Bar for Steel Frame.
2.15 1500mm
2.15 900mm
2.15 800mm
2.15 2.15 1000mm
3. Heavy Duty Sliding 2.15 900mm
2. 20mmØ Round Bar for
800mm Track & Accessories Horizontal & Vertical
Supports
3. 6mm thk. Steel Plate

FLOOR LINE

SCHEDULE OF DOORS & WINDOWS Description : Double Swing Aluminum Description : Flushed Type Door Description : Flushed Type Door Description : PVC Door with Louver Description : Steel Sliding Door Description : Door Grilles
Glass Door Location : See Floor Plan Location : See Floor Plan Location : See Floor Plan Location : Floor Plan Location : Floor Plan
SCALE: 1:100 Location : See Floor Plan Required : 3 Sets Required : 1 Set Required : 5 Sets Required : 3 Sets Required : 2 Sets
Required : 1 Set

D C B A
TOP OF ROOF 0.40

1.40 1.00 1.40

1.35 WG2
5300mm
WG6
1300mm
WG1
5800mm
5.00 5.00
3.00 3.00
1.65
GFL 6" CHB with Fine 6" CHB with Fine
Plastered Finish Plastered Finish
0.60 NGL 0.40 0.60

0.20

4.35 1.50 4.80 1.20 1.00

1.15 5.85 6.00 1.50 1.50


LEFT ELEVATION 1.00 13.00 3.00
SCALE: 1:100

PROJECT TITLE: DRAFTED BY: CHECKED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET CONTENT: SHEET NO.:

REPUBLIC OF THE PHILIPPINES


PROPOSED CONSTRUCTION OF
DEPARTMENT OF INTERIOR AND LOCAL GOVERNMENT
BUREAU OF JAIL MANAGEMENT AND PENOLOGY Gerald G Baloyos MARICAR C GONZALES RENZ JOSEPH D BASCUGIN JOLLY C TAGUIAM JR A-4
UPPER DOONGAN, BUTUAN CITY ONE - STOREY ISOLATION FACILITY Jail Officer 2 JMP Jail Senior Inspector (RCE) JMP Jail Chief Inspector JMP Jail Chief Superintendent DSC AS SHOWN
PROJECT ADDRESS: Staff, Logistics Division Regional Engineer Chief, Logistics Division Regional Director of the Jail Bureau 4 16
Bislig City Jail, Villa Josefa Subd., Bislig City
A B C D
0.40 TOP OF ROOF

1.40 1.00 1.40

WG2
5300mm
1.35
5.00 SG1 SG3 5.00
3.00 5800mm 1300mm
3.00
1.05

6" CHB with Fine 6" CHB with Fine GFL 0.60
Plastered Finish Plastered Finish
0.60 0.40 NGL 0.60

0.20

1.00 1.20 4.80 1.50 4.35

1.50 1.50 6.00 5.85 1.15


RIGHT ELEVATION
SCALE: 1:100 3.00 13.00 1.00

1 2 3 3 2 1
0.40

6" CHB with Fine


1.40 Plastered Finish
1.40 1.40 1.00 1.40

0.85 1.35 WG7 WG4 WG4 WG7


1200mm 3100mm 3100mm 1200mm
5.00 SG2 5.00 5.00 5.00
3.00 3100mm
3.00 3.00 3.00
D1
1500mm
2.15 1.65
GFL GFL 6" CHB with Fine 6" CHB with Fine
Plastered Finish Plastered Finish
0.60 NGL 0.40 0.60 0.60 NGL 0.40 0.60

0.20

1.50 3.50 3.50 1.50 1.50 3.50 3.50 1.50

1.00 5.00 5.00 1.00 1.00 5.00 5.00 1.00

10.00 10.00
REAR ELEVATION
FRONT ELEVATION SCALE: 1:100
SCALE: 1:100

PROJECT TITLE: DRAFTED BY: CHECKED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET CONTENT: SHEET NO.:

REPUBLIC OF THE PHILIPPINES


PROPOSED CONSTRUCTION OF
DEPARTMENT OF INTERIOR AND LOCAL GOVERNMENT
BUREAU OF JAIL MANAGEMENT AND PENOLOGY Gerald G Baloyos MARICAR C GONZALES RENZ JOSEPH D BASCUGIN JOLLY C TAGUIAM JR A-3
UPPER DOONGAN, BUTUAN CITY ONE - STOREY ISOLATION FACILITY Jail Officer 2 JMP Jail Senior Inspector (RCE) JMP Jail Chief Inspector JMP Jail Chief Superintendent DSC AS SHOWN
PROJECT ADDRESS: Staff, Logistics Division Regional Engineer Chief, Logistics Division Regional Director of the Jail Bureau 3 16
Bislig City Jail, Villa Josefa Subd., Bislig City
A B C D

3.00 13.00

1.50 1.50 6.00 1.50 5.50

2.00 2.00 2.00 3.50 2.00

ROOFLINE
WG1 WG6 WG2
5800mm 1300mm 5300mm

1' T&B
1.50 1.10 D4 D4
DOFFING 1.50
800mm
800mm
AREA
UP PERSONNEL

1 RAMP PANTRY
D2
900mm
BARRACK D3
800mm
D2
900mm
0.80
UP PHARMACY

SD
HIGH CONTAGOUS 1.50
1000mm WARD 0.70
D1 D4 WG4
3.50 1500mm
RECORDS
800mm 3100mm 3.50
H
PWD
REGISTRATION A T&B 2.00
L
AREA
2 10.00 D2
900mm
L
W
10.00
PWD A PWD
T&B Y T&B 2.00
SG2 WG3 D4 WG4
3.50 3100mm 3300mm 800mm 3100mm 3.50
LOW D4 SD MEDIUM CONTAGOUS
DONNING 800mm
AREA CONTAGOUS 1000mm
WARD
WARD 1.50
DG SD
3 900mm

WG5
1000mm

WG5
1750mm 1750mm

1.50 DG
900mm
HALLWAY WG7
1200mm
1.50
3' SG1 SG3 WG2
5800mm 1300mm 5300mm

1.00 1.20 4.80 1.50 3.50 1.00

1.50 1.50 6.00 5.00 2.00

3.00 13.00

FLOOR PLAN
SCALE 1:100

PROJECT TITLE: DRAFTED BY: CHECKED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET CONTENT: SHEET NO.:

REPUBLIC OF THE PHILIPPINES


PROPOSED CONSTRUCTION OF
DEPARTMENT OF INTERIOR AND LOCAL GOVERNMENT
BUREAU OF JAIL MANAGEMENT AND PENOLOGY Gerald G Baloyos MARICAR C GONZALES RENZ JOSEPH D BASCUGIN JOLLY C TAGUIAM JR A-2
UPPER DOONGAN, BUTUAN CITY ONE - STOREY ISOLATION FACILITY Jail Officer 2 JMP Jail Senior Inspector (RCE) JMP Jail Chief Inspector JMP Jail Chief Superintendent DSC AS SHOWN
PROJECT ADDRESS: Staff, Logistics Division Regional Engineer Chief, Logistics Division Regional Director of the Jail Bureau 2 16
Bislig City Jail, Villa Josefa Subd., Bislig City
REPUBLIC OF THE PHILIPPINES

A
1 TABLE OF CONTENTS
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
OFFICE OF THE BUILDING OFFICIAL
ARE
BAYUGAN CITY

PY TECHNICAL DESCRIPTION
AM
SW 1
63.9 LINE BEARING DISTANCE SHT. NO. DESCRIPTION LAND USED & ZONING
VICINITY MAP
CE
1-2 97.77 m 1
TER
FEN
S 17° 63' E 16
SITE DEVELOPMENT PLAN
PERSPECTIVE
ST
IME
PER
ARY
RIM
GP
2
EXIS
TIN
2-3 S 77° 14' W 64.19 m 16
ARCHITECTURAL DRAWINGS

ENC
E
ST 3
DAR
YP
ERIM
ETE
RF
3-4 N 17° 45' W 90.00 m 16
ARCHITECTURAL DRAWINGS
LINE & GRADE

EXIS
N
ECO

4 EXIS
TIN
G S

TING
EXIS

48.8
4-1 63.91 m ARCHITECTURAL DRAWINGS
EXIS

OF N 70° 17' E 16

PRIM
ION
TING

TING BUILDI
UCT ING 2

8
R
T 5
SEC

ARY
S IL
CON AIL BU
OND

ARCHITECTURAL DRAWINGS
ING
A J
TIELINE FROM BLLM No. 1, PLS-450-0

PER
16

TWO NG 1
ARE - GO TOREY
ARY

ED ON S
POS

IME
-
TWO
PER

PRO FOR ENT


TO COR. "1" S 13°55 W., 572.14 m. 6

TER
- ST
IME

PM & ARCHITECTURAL DRAWINGS


ELO 16
TER

FEN
S
DEV GRAM D

ORE
FE

O ARCHITECTURAL

CE
PR LIHOO 7
NCE

LIVE IVITIES m)

Y JA
STRUCTURAL DRAWINGS
ACT x 17.00 16

10.0
00m OF

IL
(10. ION T
N
UCT
STR LL COU
R 8 STRUCTURAL DRAWINGS
O BA 16

0m
C
P O SED ASKET
PRO ERED B 9
COV

wide 97.77
EXIS

NCE STRUCTURAL DRAWINGS


R FE
IMETE
16
TING

PER

ENT ATE
ND ARY
ECO
GS
10
PRIM

TIN
EXIS STRUCTURAL

Roa
RAN
STRUCTURAL DRAWINGS
46.6

16
ARY

CE
PER

11
6

d
PLUMBING DRAWINGS
IME

REA 16
TER

DA E
GAT
OSE ATION FEN
C E
12
FEN

O P L TER
PR ISO PER
IME
PLUMBING DRAWINGS
FOR ACILITY 0m)
CE

ARY

F .0 TING
SEC
OND
16
x 22
IN
EXIS ADM F
TING
00m EXIS ICE (ST
AF
13
(10. OFF FFICE)
O PLUMBING DRAWINGS
mx
6.00
m
16 SANITARY
5.10

2.00 14 ELECTRICAL DRAWINGS


ON THIS SITE 16

PRO
VISIO
PRO

15 ELECTRICAL DRAWINGS

NO
SWA

PER

16

F PR
T

16
90.0

IMA
Y LI

ELECTRICAL DRAWINGS

RY
MPY

16
NE

48.8
PER
ELECTRICAL
0

IME
TER

8
ARE

FEN
CE
A

EA
PY AR
SWAM
VICINITY MAP
PRO

MECHANICAL
VIS
ION

NOT TO SCALE
OF
PRIM
ARY
43.3

PER
IME
4

TER
FEN

FIRE SAFETY
CE

OF P
RIM ARY PER
IMET
ER FE
NCE
2
ISION
PROV

E
FENC
ETER
PERIM
RIM ARY
OF P
ISION RECOMMENDING APPROVAL:
PROV

64.19

PY AREA
3 SWAM

APPROVED:

SITE DEVELOPMENT PLAN PERSPECTIVE


SCALE 1:500

PROJECT TITLE: DRAFTED BY: CHECKED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET CONTENT: SHEET NO.:

REPUBLIC OF THE PHILIPPINES


PROPOSED CONSTRUCTION OF
DEPARTMENT OF INTERIOR AND LOCAL GOVERNMENT
BUREAU OF JAIL MANAGEMENT AND PENOLOGY Gerald G Baloyos MARICAR C GONZALES RENZ JOSEPH D BASCUGIN JOLLY C TAGUIAM JR A-1
UPPER DOONGAN, BUTUAN CITY ONE-STOREY ISOLATION FACILITY Jail Officer 2 JMP Jail Senior Inspector (RCE) JMP Jail Chief Inspector JMP Jail Chief Superintendent DSC AS SHOWN
PROJECT ADDRESS: Staff, Logistics Division Regional Engineer Chief, Logistics Division Regional Director of the Jail Bureau 1 16
Bislig City Jail, Villa Josefa Subd., Bislig City