Pressure Reducing Valves 544
Operation and Service Manual
Publisher:
ALLDOS Eichler GmbH
Reetzstraße 85 • 76327 Pfinztal (Söllingen)
Postfach 1160 • 76317 Pfinztal
Tel. ++49 72 40 61-0 / Fax. ++49 72 40 61-211
Subject to change.
2
Installation Data
Owner:
Grundfos Alldos customer No.:
Contract No.:
Order No. of device:
Serial number of device:
Put into service on:
Location of device:
Used for:
Installation Diagram
3
4
544 gb
Contents
Installation Data ............................................................................................... 3
Installation Diagram ........................................................................................ 3
1 Of General Interest ................................................................................ 6
1.1 Structure of the Documentation .................................................................. 6
1.2 Using this Paper ......................................................................................... 6
1.3 Warranty ..................................................................................................... 6
2 Safety Instructions ................................................................................ 7
2.1 Application of the Product ........................................................................... 7
2.2 Obligations of the Operating Authority ........................................................ 7
2.3 Averting Dangers ........................................................................................ 7
3 Technical Data ....................................................................................... 8
3.1 General Data .............................................................................................. 8
3.2 Servomotor ................................................................................................. 8
3.3 Accessories ................................................................................................ 8
3.4 Dimensioned Drawings ............................................................................... 9
4 Installation ............................................................................................ 10
4.1 Transport and Storage .............................................................................. 10
4.2 Unpacking ................................................................................................. 10
4.3 Installation Requirements ......................................................................... 10
4.4 Mounting ................................................................................................... 11
5 Commissioning .................................................................................... 14
5.1 Preparations for Commissioning ............................................................... 14
5.1.1 Gas Connections ........................................................................... 14
5.1.2 Mounting the Manometer .............................................................. 14
5.1.3 Electrical Connections
(only Versions with Servomotor) .................................................... 14
5.2 Checks before Commissioning ................................................................. 16
5.3 Commissioning ......................................................................................... 16
6 Operation ............................................................................................. 17
6.1 Description of the Device .......................................................................... 17
6.2 Operation .................................................................................................. 18
6.2.1 Versions without Servomotor ......................................................... 18
6.2.2 Versions with Servomotor .............................................................. 18
6.3 Possible Faults .......................................................................................... 19
7 Maintenance ......................................................................................... 20
7.1 Cleaning the Valve and replacing the Gaskets ......................................... 20
7.2 Adjusting the Limit Switches (only Versions with Servomotor) ................. 21
8 Spare Parts........................................................................................... 22
8.1 Spare Parts Drawings ............................................................................... 23
5
1 Of General Interest
1.3 Warranty
Warranty in accordance with our general terms of sale and delivery shall only be
valid, if
❏ the product is used according to the information within this paper,
❏ the product is not being opened or used improperly,
❏ maintenance and repair is implemented exclusively by authorized and
qualified personnel,
❏ original spare parts are used for repairs,
❏ only parts approved by Grundfos Alldos are being used in the whole gas
dosing plant.
Warranty is not valid for typical wearing parts, e. g.
❏ gaskets, O-rings, diaphragms
6
2 Safety Instructions
7
3 Technical Data
3.2 Servomotor
Design Linear-attached actuator with no-voltage readjusting device
Regulating distance max. 25 mm
Closing time in case of power failure ca. 5.5 s (at maximum stroke)
Closing direction Running-in slide rod
Connection Internal connector block
Mains line Nominal diameter min. 1 mm2
Mains fuse (by customer) max. 6 A
Duty cycle continuous duty
Permissible ambient temperature 0 ... +50 °C
Degree of protection IP 54
Limit switches 2 path-dependent signal switches, max. load 10 A, 250 V AC
Additional features 2 path-dependent signal switches, max. load 10 A ohmic load, 5 A inductive load,
250 V AC
Manual operation 2 keys, switch for remote/local
Electrical data Index no. Voltage Nom. curent Power consumption
V000 220-240 V 50/60 Hz 22 mA 20 W
V001 110-120 V 50/60 Hz 60 mA 21,6 W
3.3 Accessories
Order no. Description
96688685 (541-010) Manometer 0-16 bar, G 1/4 (for chlorine)
96728842 (539-011) Wall mounting bracket, coated steel
96727550 (529-11) Connection set for Cu pipe 8x11 (only for G1/2, only for chlorine)
96727552 (529-112) Screwed flange pair (connection flange), groove/tongue, DN15
96727556 (529-12) Screwed flange pair (counter flange), groove/tongue, DN15
96727578 (529-22) Welding neck flange (counter flange), DIN 2635/2512, DN15
96698366 (529-24) Welding neck flange (counter flange), DIN 2635/2512, DN25
8
3.4 Dimensioned Drawings
529-12 529-112
529-14 529-113
541-010
H
~35
D
539-011
L1 T1
T2
529-11
L2
H
162
9
4 Installation
4.2 Unpacking
● Observe when unpacking:
• No humidity should get into gas-leading parts!
• No foreign matter should get into gas-leading parts!
● Check the scope of delivery.
● Mount as soon as possible after unpacking.
4.3 Installation
Requirements
CAUTION In case of non-observance:
Danger of damages!
❏ Vibration-free location.
❏ When using a chlorine evaporator:
• Mount the pressure reducing valve after the evaporator.
❏ When usin a liquid chlorine trap and filter (Grundfos Alldos LiquFilt):
• Mount the pressure reducing valve after the trap.
● Observe permissible ambient temperature!
10
4.4 Mounting
CAUTION Observe the flow direction (arrow)!
● Slightly apply glue onto the male threads of the reducers and the female
threads of the valve.
● Screw in the reducers.
● Slide the union nut onto the connection nipple.
● Apply glue to the connection nipple thread.
● Screw the connection nipple into the reducers.
CAUTION
When tightening the copper pipe, press against the adhesive
area of the connection nipple in order to avoid
damaging and thus leakiness of this area.
11
Mounting of the connecting flanges
● Clean and degrease the thread of the pressure reducing valve, the double
nipple and the connection flanges.
● Slightly apply glue to one thread of each double nipple and the female
threads of the pressure reducing valve; screw both double nipples into the
pressure reducing valve.
● Place the threaded flange with groove for the inlet side ready.
● Slightly apply glue to the thread of the grooved flange and the thread of the
inlet side double nipple; screw the grooved flange onto the nipple.
CAUTION
Instantlydefinetheflangeposition(alignmentofthemountingholes)-
if the glue has hardened, even the slightest correction will
lead to leakiness.
Danger of gas leakage!
● Slightly apply glue to the thread of the tongue-faced flange and the thread of
the outlet-side double nipple; screw the tongue-faced flange onto the nipple.
● Instantly define the accurate position of the flange.
● Wait until the glue has hardened.
CAUTION
A tight sealing is obtained, if the tongue of the counterflange is
dipped into the groove of the connection flange! This
connection can be dismantled.
● Slightly apply glue to the threads of the outlet-side pipework and female
thread of the grooved threaded flange.
12
● Screw the pipework into the grooved threaded flange.
● Place the gasket into the groove of the counterflange.
● Apply the grooved threaded flange to the tongue-faced connection flange,
position the grooved threaded flange and attach it to the connection flange
using the screws.
● Wait until the glue has hardened!
CAUTION
Do not heaten the adhesive areas; heat will destroy the adhesive
film and leads to leakiness!
● Weld the pipework with the tack-welded welding neck flange- detached from
the connection flange.
● Place the gasket into the groove of the outlet-side welding neck flange.
● Apply the welding neck flange to the connecting flange and fasten it using
the screws.
● Tack-weld the pipework to the welding neck flange.
● Unscrew the pipework with tack-welded welding neck flange from the
reducing valve and weld it.
13
5 Commissioning
14
Connection diagram
WE WE WE WE
M
~
1 S1 S2 S3 S4
- +
M
~ ~ local remote
M M 40 41 N 1 42 35 36 3 12 2 15 16 17 18 1920 21
open
close
L N PE
power supply local/remote switch limit switches
output potential-loaded output potential-free
25.544-2
15
5.2 Checks before
Commissioning
Before Commissioning:
● Check the whole system for tightness.
● If necessary, check the electrical connections.
5.3 Commissioning
The pressure reducing valve 544 is always part of a gas dosing system. Therefore
the other components determine the course of commissioning. Normally the
procedure is:
Suggested pressures
❏ 2-3 bar for Cl2
❏ 3-4 bar for NH3
16
6 Operation
17
6.2 Operation
Suggested pressures
❏ 2-3 bar for Cl2
❏ 3-4 bar for NH3
Automatic operation
No operation is necessary.
Manual operation
● At the control panel of the evaporator: Switch from automatic to manual
operation.
● Using the manual adjustment keys, adjust the valve until the manometer
shows the desired pressure.
18
6.3 Possible Faults
No gas flow (only valves with Establish power supply, possibly switch
No mains voltage.
servomotor). on the evaporator.
19
7 Maintenance
WARNING Switch off the whole system before doing cleaning and
! maintenance work!
● Replace O-rings (1.18, 1.20) and flat gasket (1.6) by new ones.
● Remount all parts in reverse sequence.
• For versions with servomotor, observe assembly dimensions:
46,5 mm (R ½")
36,5 mm (R1") min. 1 mm
20
● If present, remount the servomotor.
● Remount the valve into the line.
● Restart the system.
● Check the tightness.
● Adjust the desired back pressure.
21
8 Spare Parts
22
8.1 Spare Parts Drawings
Parts marked with * are part of the spare parts sets.
96693065 (544-101)
1.10*/1.11*
1.6*
1.5*
1.4
1.3
1.2
1.1
96729019 (544-102)
1.18*
1.7
1.5*
1.6*
1.1
23
544 gb
96729028 (544-220-10001)
1 2 3 5
6 7 12.2615-110
96729024 (544-210-10000)
1 2 3 5
6 7 12.2615-120
24
Declaration of conformity
Declaration of conformity
GB: EU declaration of conformity DE: EG-Konformitätserklärung
We, Grundfos, declare under our sole responsibility that the product Wir, Grundfos, erklären in alleiniger Verantwortung, dass das Produkt
Pressure reducing valve 544, to which this declaration relates, is in Pressure reducing valve 544, auf das sich diese Erklärung bezieht, mit
conformity with these Council directives on the approximation of the laws den folgenden Richtlinien des Rates zur Angleichung der
of the EU member states: Rechtsvorschriften der EU-Mitgliedsstaaten übereinstimmt:
Ulrich Stemick
Technical Director
Grundfos Water Treatment GmbH
Reetzstr. 85, D-76327 Pfinztal, Germany
Grundfos companies
Bombas GRUNDFOS de Argentina S.A. GRUNDFOS DK A/S GRUNDFOS Pumps Korea Ltd. GRUNDFOS s.r.o.
Ruta Panamericana km. 37.500 Centro Martin Bachs Vej 3 6th Floor, Aju Building 679-5 Prievozská 4D
Industrial Garin DK-8850 Bjerringbro Yeoksam-dong, Kangnam-ku, 135-916 821 09 BRATISLAVA
1619 - Garin Pcia. de B.A. Tlf.: +45-87 50 50 50 Seoul, Korea Phona: +421 2 5020 1426
Phone: +54-3327 414 444 Telefax: +45-87 50 51 51 Phone: +82-2-5317 600 sk.grundfos.com
Telefax: +54-3327 411 111 E-mail: info_GDK@grundfos.com Telefax: +82-2-5633 725
www.grundfos.com/DK
Slovenia
Australia Latvia GRUNDFOS d.o.o.
GRUNDFOS Pumps Pty. Ltd. Estonia SIA GRUNDFOS Pumps Latvia Šlandrova 8b, SI-1231 Ljubljana-Črnuče
P.O. Box 2040 GRUNDFOS Pumps Eesti OÜ Deglava biznesa centrs Phone: +386 1 568 0610
Regency Park Peterburi tee 92G Augusta Deglava ielā 60, LV-1035, Rīga, Telefax: +386 1 568 0619
South Australia 5942 11415 Tallinn Tālr.: + 371 714 9640, 7 149 641 E-mail: slovenia@grundfos.si
Phone: +61-8-8461-4611 Tel: + 372 606 1690 Fakss: + 371 914 9646
Telefax: +61-8-8340 0155 Fax: + 372 606 1691
South Africa
Lithuania Grundfos (PTY) Ltd.
Austria Finland GRUNDFOS Pumps UAB Corner Mountjoy and George Allen Roads
GRUNDFOS Pumpen Vertrieb Ges.m.b.H. OY GRUNDFOS Pumput AB Smolensko g. 6 Wilbart Ext. 2
Grundfosstraße 2 Trukkikuja 1 LT-03201 Vilnius Bedfordview 2008
A-5082 Grödig/Salzburg FI-01360 Vantaa Tel: + 370 52 395 430 Phone: (+27) 11 579 4800
Tel.: +43-6246-883-0 Phone: +358-(0)207 889 500 Fax: + 370 52 395 431 Fax: (+27) 11 455 6066
Telefax: +43-6246-883-30 Telefax: +358-(0)207 889 550 E-mail: lsmart@grundfos.com
Malaysia
Belgium France GRUNDFOS Pumps Sdn. Bhd. Spain
N.V. GRUNDFOS Bellux S.A. Pompes GRUNDFOS Distribution S.A. 7 Jalan Peguam U1/25 Bombas GRUNDFOS España S.A.
Boomsesteenweg 81-83 Parc d’Activités de Chesnes Glenmarie Industrial Park Camino de la Fuentecilla, s/n
B-2630 Aartselaar 57, rue de Malacombe 40150 Shah Alam E-28110 Algete (Madrid)
Tél.: +32-3-870 7300 F-38290 St. Quentin Fallavier (Lyon) Selangor Tel.: +34-91-848 8800
Télécopie: +32-3-870 7301 Tél.: +33-4 74 82 15 15 Phone: +60-3-5569 2922 Telefax: +34-91-628 0465
Télécopie: +33-4 74 94 10 51 Telefax: +60-3-5569 2866
Belarus Sweden
Представительство ГРУНДФОС в Germany Mexico GRUNDFOS AB
Минске GRUNDFOS Water Treatment GmbH Bombas GRUNDFOS de México S.A. de (Box 333) Lunnagårdsgatan 6
220125, Минск Reetzstraße 85 C.V. 431 24 Mölndal
ул. Шафарнянская, 11, оф. 56 D-76327 Pfinztal (Söllingen) Boulevard TLC No. 15 Tel.: +46 31 332 23 000
Тел.: +7 (375 17) 286 39 72, 286 39 73 Tel.: +49 7240 61-0 Parque Industrial Stiva Aeropuerto Telefax: +46 31-331 94 60
Факс: +7 (375 17) 286 39 71 Telefax: +49 7240 61-177 Apodaca, N.L. 66600
E-mail: minsk@grundfos.com E-mail: gwt@grundfos.com Phone: +52-81-8144 4000
Switzerland
Telefax: +52-81-8144 4010 GRUNDFOS ALLDOS International AG
Bosnia/Herzegovina Germany Schönmattstraße 4
GRUNDFOS Sarajevo GRUNDFOS GMBH Netherlands CH-4153 Reinach
Trg Heroja 16, Schlüterstr. 33 GRUNDFOS Netherlands Tel.: +41-61-717 5555
BiH-71000 Sarajevo 40699 Erkrath Veluwezoom 35 Telefax: +41-61-717 5500
Phone: +387 33 713 290 Tel.: +49-(0) 211 929 69-0 1326 AE Almere E-mail: grundfosalldos-CH@grundfos.com
Telefax: +387 33 659 079 Telefax: +49-(0) 211 929 69-3799 Postbus 22015
e-mail: grundfos@bih.net.ba E-mail: infoservice@grundfos.de 1302 CA ALMERE
Switzerland
Service in Deutschland: Tel.: +31-88-478 6336 GRUNDFOS Pumpen AG
Brazil E-mail: kundendienst@grundfos.de Telefax: +31-88-478 6332 Bruggacherstrasse 10
BOMBAS GRUNDFOS DO BRASIL E-mail: info_gnl@grundfos.com CH-8117 Fällanden/ZH
Av. Humberto de Alencar Castelo Branco, Greece Tel.: +41-44-806 8111
630 GRUNDFOS Hellas A.E.B.E. New Zealand Telefax: +41-44-806 8115
CEP 09850 - 300 20th km. Athinon-Markopoulou Av. GRUNDFOS Pumps NZ Ltd.
São Bernardo do Campo - SP P.O. Box 71 17 Beatrice Tinsley Crescent
Taiwan
Phone: +55-11 4393 5533 GR-19002 Peania North Harbour Industrial Estate GRUNDFOS Pumps (Taiwan) Ltd.
Telefax: +55-11 4343 5015 Phone: +0030-210-66 83 400 Albany, Auckland 7 Floor, 219 Min-Chuan Road
Telefax: +0030-210-66 46 273 Phone: +64-9-415 3240 Taichung, Taiwan, R.O.C.
Bulgaria Telefax: +64-9-415 3250 Phone: +886-4-2305 0868
Grundfos Bulgaria EOOD Hong Kong Telefax: +886-4-2305 0878
Slatina District GRUNDFOS Pumps (Hong Kong) Ltd. Norway
Iztochna Tangenta street no. 100 Unit 1, Ground floor GRUNDFOS Pumper A/S
Thailand
BG - 1592 Sofia Siu Wai Industrial Centre Strømsveien 344 GRUNDFOS (Thailand) Ltd.
Tel. +359 2 49 22 200 29-33 Wing Hong Street & Postboks 235, Leirdal 92 Chaloem Phrakiat Rama 9 Road,
Fax. +359 2 49 22 201 68 King Lam Street, Cheung Sha Wan N-1011 Oslo Dokmai, Pravej, Bangkok 10250
email: bulgaria@grundfos.bg Kowloon Tlf.: +47-22 90 47 00 Phone: +66-2-725 8999
Phone: +852-27861706 / 27861741 Telefax: +47-22 32 21 50 Telefax: +66-2-725 8998
Canada
GRUNDFOS Canada Inc.
Telefax: +852-27858664
Poland Turkey
2941 Brighton Road Hungary GRUNDFOS Pompy Sp. z o.o. GRUNDFOS POMPA San. ve Tic. Ltd. Sti.
Oakville, Ontario GRUNDFOS Hungária Kft. ul. Klonowa 23 Gebze Organize Sanayi Bölgesi
L6H 6C9 Park u. 8 Baranowo k. Poznania Ihsan dede Caddesi,
Phone: +1-905 829 9533 H-2045 Törökbálint, PL-62-081 Przeźmierowo 2. yol 200. Sokak No. 204
Telefax: +1-905 829 9512 Phone: +36-23 511 110 Tel: (+48-61) 650 13 00 41490 Gebze/ Kocaeli
Telefax: +36-23 511 111 Fax: (+48-61) 650 13 50 Phone: +90 - 262-679 7979
China Telefax: +90 - 262-679 7905
Grundfos Alldos India Portugal E-mail: satis@grundfos.com
Dosing & Disinfection GRUNDFOS Pumps India Private Limited Bombas GRUNDFOS Portugal, S.A.
ALLDOS (Shanghai) Water Technology 118 Old Mahabalipuram Road Rua Calvet de Magalhães, 241
Ukraine
Co. Ltd. Thoraipakkam Apartado 1079 Бізнес Центр Європа
West Unit, 1 Floor, No. 2 Building (T 4-2) Chennai 600 097 P-2770-153 Paço de Arcos Столичне шосе, 103
278 Jinhu Road, Jin Qiao Export Process- Phone: +91-44 4596 6800 Tel.: +351-21-440 76 00 м. Київ, 03131, Україна
ing Zone Telefax: +351-21-440 76 90 Телефон: (+38 044) 237 04 00
Pudong New Area
Indonesia Факс.: (+38 044) 237 04 01
Shanghai, 201206 PT. GRUNDFOS POMPA Romania E-mail: ukraine@grundfos.com
Graha Intirub Lt. 2 & 3 GRUNDFOS Pompe România SRL
Phone: +86 21 5055 1012
Jln. Cililitan Besar No.454. Makasar, Bd. Biruintei, nr 103
United Arab Emirates
Telefax: +86 21 5032 0596 GRUNDFOS Gulf Distribution
E-mail: grundfosalldos-CN@grundfos.com Jakarta Timur Pantelimon county Ilfov
ID-Jakarta 13650 Phone: +40 21 200 4100 P.O. Box 16768
China Phone: +62 21-469-51900 Telefax: +40 21 200 4101 Jebel Ali Free Zone
GRUNDFOS Pumps (Shanghai) Co. Ltd. Telefax: +62 21-460 6910 / 460 6901 E-mail: romania@grundfos.ro Dubai
10F The Hub, No. 33 Suhong Road Phone: +971-4- 8815 166
Minhang District
Ireland Russia Telefax: +971-4-8815 136
GRUNDFOS (Ireland) Ltd. ООО Грундфос
Shanghai 201106
Unit A, Merrywell Business Park Россия, 109544 Москва, ул. Школьная
United Kingdom
PRC GRUNDFOS Pumps Ltd.
Phone: +86-21 6122 5222 Ballymount Road Lower 39
Dublin 12 Тел. (+7) 495 737 30 00, 564 88 00 Grovebury Road
Telefax: +86-21 6122 5333 Leighton Buzzard/Beds. LU7 4TL
Phone: +353-1-4089 800 Факс (+7) 495 737 75 36, 564 88 11
Croatia Telefax: +353-1-4089 830 E-mail grundfos.moscow@grundfos.com Phone: +44-1525-850000
GRUNDFOS CROATIA d.o.o. Telefax: +44-1525-850011
Italy Serbia
Cebini 37, Buzin
GRUNDFOS Pompe Italia S.r.l. GRUNDFOS Predstavništvo Beograd
U.S.A.
HR-10010 Zagreb GRUNDFOS Pumps Corporation
Phone: +385 1 6595 400 Via Gran Sasso 4 Dr. Milutina Ivkovića 2a/29
I-20060 Truccazzano (Milano) YU-11000 Beograd 17100 West 118th Terrace
Telefax: +385 1 6595 499 Olathe, Kansas 66061
www.hr.grundfos.com Tel.: +39-02-95838112 Phone: +381 11 26 47 877 / 11 26 47 496
Telefax: +39-02-95309290 / 95838461 Telefax: +381 11 26 48 340 Phone: +1-913-227-3400
Czech Republic Telefax: +1-913-227-3500
Japan Singapore
GRUNDFOS s.r.o.
GRUNDFOS Pumps K.K. GRUNDFOS (Singapore) Pte. Ltd.
Uzbekistan
Čapkovského 21 Grundfos Tashkent, Uzbekistan The Repre-
779 00 Olomouc Gotanda Metalion Bldg. 5F, 25 Jalan Tukang
5-21-15, Higashi-gotanda Singapore 619264 sentative Office of Grundfos Kazakhstan in
Phone: +420-585-716 111 Uzbekistan
Telefax: +420-585-716 299 Shiagawa-ku, Tokyo, Phone: +65-6681 9688
141-0022 Japan Telefax: +65-6681 9689 38a, Oybek street, Tashkent
Phone: +81 35 448 1391 Телефон: (+998) 71 150 3290 / 71 150
Telefax: +81 35 448 9619 3291
Факс: (+998) 71 150 3292
www.grundfos.com
The name Grundfos, the Grundfos logo, and be think innovate are registered trademarks owned by Grundfos Holding A/S or Grundfos A/S, Denmark. All rights reserved worldwide. © Copyright Grundfos Holding A/S