Pressure Reducing Valves 544

Operation and Service Manual

Read this manual completely and keep it!


No warranty in case of damages caused by incorrect operation.

15.710112-V3.0 1
544 gb

Imprint
Pressure Reducing Valves 544
Operation and Service Manual

Publisher:
ALLDOS Eichler GmbH
Reetzstraße 85 • 76327 Pfinztal (Söllingen)
Postfach 1160 • 76317 Pfinztal
Tel. ++49 72 40 61-0 / Fax. ++49 72 40 61-211

Subject to change.

2
Installation Data

NOTE Please fill in this form following commissioning. It will


help you and your Grundfos Alldos servicing partner to
adjust the device during subsequent corrections.

Owner:
Grundfos Alldos customer No.:
Contract No.:
Order No. of device:
Serial number of device:
Put into service on:
Location of device:
Used for:

Installation Diagram

3
4
544 gb

Contents
Installation Data ............................................................................................... 3
Installation Diagram ........................................................................................ 3
1 Of General Interest ................................................................................ 6
1.1 Structure of the Documentation .................................................................. 6
1.2 Using this Paper ......................................................................................... 6
1.3 Warranty ..................................................................................................... 6
2 Safety Instructions ................................................................................ 7
2.1 Application of the Product ........................................................................... 7
2.2 Obligations of the Operating Authority ........................................................ 7
2.3 Averting Dangers ........................................................................................ 7
3 Technical Data ....................................................................................... 8
3.1 General Data .............................................................................................. 8
3.2 Servomotor ................................................................................................. 8
3.3 Accessories ................................................................................................ 8
3.4 Dimensioned Drawings ............................................................................... 9
4 Installation ............................................................................................ 10
4.1 Transport and Storage .............................................................................. 10
4.2 Unpacking ................................................................................................. 10
4.3 Installation Requirements ......................................................................... 10
4.4 Mounting ................................................................................................... 11
5 Commissioning .................................................................................... 14
5.1 Preparations for Commissioning ............................................................... 14
5.1.1 Gas Connections ........................................................................... 14
5.1.2 Mounting the Manometer .............................................................. 14
5.1.3 Electrical Connections
(only Versions with Servomotor) .................................................... 14
5.2 Checks before Commissioning ................................................................. 16
5.3 Commissioning ......................................................................................... 16
6 Operation ............................................................................................. 17
6.1 Description of the Device .......................................................................... 17
6.2 Operation .................................................................................................. 18
6.2.1 Versions without Servomotor ......................................................... 18
6.2.2 Versions with Servomotor .............................................................. 18
6.3 Possible Faults .......................................................................................... 19
7 Maintenance ......................................................................................... 20
7.1 Cleaning the Valve and replacing the Gaskets ......................................... 20
7.2 Adjusting the Limit Switches (only Versions with Servomotor) ................. 21
8 Spare Parts........................................................................................... 22
8.1 Spare Parts Drawings ............................................................................... 23

5
1 Of General Interest

1.1 Structure of the


Documentation
This Manual contains all information necessary for safe operation of the described
product:
❏ Technical Data
❏ Instructions for commissioning, operation and maintenance
❏ Safety Instructions
If you require further information or if any problems arise which are not reflected in
detail in this manual, contact Grundfos Alldos directly for the information needed.

1.2 Using this Paper


❏ Descriptions are written as plain text.
❏ Lists are indicated by squares (❏), sublists by dashes (-).
❏ Operation steps are indicated by bullets (●), substeps by small bullets (•).
❏ Cross-references are indicated by italic letters and an arrow (➜).
❏ The headings WARNING, CAUTION and NOTE have the following meaning:

WARNING Danger of injuries and accidents!


!

CAUTION Danger of incorrect operation or damage to the product!

NOTE There is an exceptional feature.

1.3 Warranty
Warranty in accordance with our general terms of sale and delivery shall only be
valid, if
❏ the product is used according to the information within this paper,
❏ the product is not being opened or used improperly,
❏ maintenance and repair is implemented exclusively by authorized and
qualified personnel,
❏ original spare parts are used for repairs,
❏ only parts approved by Grundfos Alldos are being used in the whole gas
dosing plant.
Warranty is not valid for typical wearing parts, e. g.
❏ gaskets, O-rings, diaphragms

6
2 Safety Instructions

2.1 Application of the Product


The pressure reducing valves 544 can be used for reducing the unregulated gas
pressure to a constant operation pressure for Grundfos Alldos Gas Dosing Systems
for water treatment as described in this manual.

WARNING Other applications are not intended and are not


! permitted. ALLDOS Eichler GmbH accept no
responsibility for damages caused by unintended use.

2.2 Obligations of the Opera-


ting Authority
The operating authority of the plant is responsible for
❏ obeying local safety regulations
❏ instructing the operation personnel
❏ providing the stipulated safety equipment
❏ arranging regular maintenance

2.3 Averting Dangers


WARNING Do not open components of the system! Cleaning and
! maintenance may only be executed by authorized
qualified personnel!

Observe Information Paper "Function and Safety of


Chlorination Plants"!

7
3 Technical Data

3.1 General Data


max. flow/
Order no. medium Diameter Connections Servomotor
96693065 (544-101) 40 kg/h Cl 2 DN 15 G 1/2 female thread -
96729018 (544-1017) 20 kg/h NH 3 DN 15 G 1/2 Innengewinde -
96729019 (544-102) 200 kg/h Cl 2 DN 25 G 1 female thread -
96729023 (544-1027) 100 kg/h NH3 DN 25 G 1 female thread -
96729024 (544-210-10000) 40 kg/h Cl2 DN 15 G 1/2 female thread 220-240V
95709193 (544-2107-10000) 20 kg/h NH 3 DN 15 G 1/2 female thread 220-240V
96729028 (544-220-10001) 200 kg/h Cl2 DN 25 G 1 female thread 220-240V
96729036 (544-2207) 100 kg/h NH3 DN 25 G 1 female thread 220-240V

3.2 Servomotor
Design Linear-attached actuator with no-voltage readjusting device
Regulating distance max. 25 mm
Closing time in case of power failure ca. 5.5 s (at maximum stroke)
Closing direction Running-in slide rod
Connection Internal connector block
Mains line Nominal diameter min. 1 mm2
Mains fuse (by customer) max. 6 A
Duty cycle continuous duty
Permissible ambient temperature 0 ... +50 °C
Degree of protection IP 54
Limit switches 2 path-dependent signal switches, max. load 10 A, 250 V AC
Additional features 2 path-dependent signal switches, max. load 10 A ohmic load, 5 A inductive load,
250 V AC
Manual operation 2 keys, switch for remote/local
Electrical data Index no. Voltage Nom. curent Power consumption
V000 220-240 V 50/60 Hz 22 mA 20 W
V001 110-120 V 50/60 Hz 60 mA 21,6 W

3.3 Accessories
Order no. Description
96688685 (541-010) Manometer 0-16 bar, G 1/4 (for chlorine)
96728842 (539-011) Wall mounting bracket, coated steel
96727550 (529-11) Connection set for Cu pipe 8x11 (only for G1/2, only for chlorine)
96727552 (529-112) Screwed flange pair (connection flange), groove/tongue, DN15
96727556 (529-12) Screwed flange pair (counter flange), groove/tongue, DN15

96706818 (529-113) Screwed flange pair(connection flange), groove/tongue, DN25

96727563 (529-14) Screwed flange pair (counter flange), groove/tongue, DN25

96727578 (529-22) Welding neck flange (counter flange), DIN 2635/2512, DN15

96698366 (529-24) Welding neck flange (counter flange), DIN 2635/2512, DN25

8
3.4 Dimensioned Drawings

529-12 529-112
529-14 529-113

541-010

H
~35

D
539-011
L1 T1
T2
529-11

L2
H

162

Order no. Connection H D L1 L2 T1 T2


96693065 (544-101) G1/2 200 120 198 240 128 240
96729019 (544-102) G1 220 150 240 - 128 255
96729024 (544-210) G 1/2 425 120 198 240 128 240
96729028 (544-220) G1 435 150 240 - 128 255
Measurements in mm

9
4 Installation

4.1 Transport and Storage


● Handle with care, do not throw!
❏ Dry and cool storage place.

4.2 Unpacking
● Observe when unpacking:
• No humidity should get into gas-leading parts!
• No foreign matter should get into gas-leading parts!
● Check the scope of delivery.
● Mount as soon as possible after unpacking.

4.3 Installation
Requirements
CAUTION In case of non-observance:
Danger of damages!

❏ Vibration-free location.
❏ When using a chlorine evaporator:
• Mount the pressure reducing valve after the evaporator.
❏ When usin a liquid chlorine trap and filter (Grundfos Alldos LiquFilt):
• Mount the pressure reducing valve after the trap.
● Observe permissible ambient temperature!

10
4.4 Mounting
CAUTION Observe the flow direction (arrow)!

Mounting with bracket 96728842 (539-011)


● Mark the bore holes and bore the the holes.
● Insert the dowels.
● Screw the bracket to the wall.
● Place the pressure reducing valve on the bracket and fix it with two hexago-
nal screws.

Mounting directly into the gas line


(only for versions without servomotor)
● Slightly apply glue (which is resistant to the gas being used, e.g. Loctite 577
for chlorine gas) onto the cleaned female and male threads.
If no appropriate glue is present:
• Use PTFE strip.
● Screw the pipe with G 1/2 or G 1 thread into the valve body.
● Observe the time necessary for the glue to harden.

Mounting with copper pipe


(only for G 1/2 pressure reducing valves)

NOTE Before connecting the pressure reducing valve with


copper pipe, it has to be fixed to the wall using the
bracket.

● Slightly apply glue onto the male threads of the reducers and the female
threads of the valve.
● Screw in the reducers.
● Slide the union nut onto the connection nipple.
● Apply glue to the connection nipple thread.
● Screw the connection nipple into the reducers.

NOTE Before connecting the copper lines, the glue must be


completely hardened!

CAUTION
When tightening the copper pipe, press against the adhesive
area of the connection nipple in order to avoid
damaging and thus leakiness of this area.

11
Mounting of the connecting flanges

NOTE The pressure reducing valve with servomotor has to be


fixed to the wall using the bracket.

● Clean and degrease the thread of the pressure reducing valve, the double
nipple and the connection flanges.
● Slightly apply glue to one thread of each double nipple and the female
threads of the pressure reducing valve; screw both double nipples into the
pressure reducing valve.
● Place the threaded flange with groove for the inlet side ready.
● Slightly apply glue to the thread of the grooved flange and the thread of the
inlet side double nipple; screw the grooved flange onto the nipple.

CAUTION
Instantlydefinetheflangeposition(alignmentofthemountingholes)-
if the glue has hardened, even the slightest correction will
lead to leakiness.
Danger of gas leakage!

● Slightly apply glue to the thread of the tongue-faced flange and the thread of
the outlet-side double nipple; screw the tongue-faced flange onto the nipple.
● Instantly define the accurate position of the flange.
● Wait until the glue has hardened.

CAUTION Do not turn the flanges out of position any more!


The slightest movement will damage the adhesive area
and lead to leakiness.
Danger of gas leakage!

In case correction of the flange position cannot be avoided, it is necessary to heat


up the affected adhesive area. Screw the connection flange with double nipple out
of the valve body.
Before glueing the parts again, thoroughly remove the remaining glue from the
threads.

Mounting the counterflanges - in case of glued threaded flanges -


● Slightly apply glue to the thread of the inlet side pipework as well as the
female thread of the tongue-faced threaded flange.
● Screw the pipework into the tongue-faced threaded flange.
● Place the gasket into the groove of the connection flange.
● Apply the tongue-faced threaded flange to the grooved connection flange,
position the tongue-faced threaded flange and attach it to the connection
flange using the screws.

CAUTION
A tight sealing is obtained, if the tongue of the counterflange is
dipped into the groove of the connection flange! This
connection can be dismantled.

● Slightly apply glue to the threads of the outlet-side pipework and female
thread of the grooved threaded flange.

12
● Screw the pipework into the grooved threaded flange.
● Place the gasket into the groove of the counterflange.
● Apply the grooved threaded flange to the tongue-faced connection flange,
position the grooved threaded flange and attach it to the connection flange
using the screws.
● Wait until the glue has hardened!

Mounting the counterflanges - with welding neck flange -


● Place the gasket into the groove of the inlet-side connection flange.
● Apply the tongue-faced welding neck flange and attach it to the connection
flange using the screws.
● Tack-weld the pipework to the welding neck flange.

CAUTION
Do not heaten the adhesive areas; heat will destroy the adhesive
film and leads to leakiness!

● Weld the pipework with the tack-welded welding neck flange- detached from
the connection flange.
● Place the gasket into the groove of the outlet-side welding neck flange.
● Apply the welding neck flange to the connecting flange and fasten it using
the screws.
● Tack-weld the pipework to the welding neck flange.
● Unscrew the pipework with tack-welded welding neck flange from the
reducing valve and weld it.

13
5 Commissioning

5.1 Preparations for


Commissioning
5.1.1 Gas Connections

CAUTION Observe the flow direction (arrow)!

● Connect the ingoing line.


● Connect the outgoing line.

5.1.2 Mounting the Manometer


If a manometer is to be used, it must be mounted before commissioning:
● Loosen the covering screw.
● Put the protective ring onto the thread of the manometer.
● Slightly apply glue (which is resistant to the gas being used) onto the
cleaned thread.
If no glue is present:
• Use PTFE strip.
● Screw the manometer into the thread. Observe the direction of the scale!

5.1.3 Electrical Connections


(only Versions with Servomo-
tor)

WARNING Before connecting the mains line:


! Switch off mains voltage!
If the mains voltage is present, the valve opens!

The local safety regulations must be observed!

Protect the cable connections and plugs from


corrosion and moisture.

CAUTION Before connecting the mains cable:


Check that the power supply specified on the rating
plate corresponds to the local supply. An incorrect
supply voltage may destroy the device!

According to the connection diagram:


● Connect the mains line to the control panel of the evaporator (which is the
most usual application).
● If necessary, connect the contact of the local/remote switch to the control
station.
● If necessary, connect the contacts of the limit switches to the control station.

14
Connection diagram

open close open valve close valve

WE WE WE WE
M
~
1 S1 S2 S3 S4

- +
M

~ ~ local remote

M M 40 41 N 1 42 35 36 3 12 2 15 16 17 18 1920 21
open

close

L N PE
power supply local/remote switch limit switches
output potential-loaded output potential-free

25.544-2

15
5.2 Checks before
Commissioning
Before Commissioning:
● Check the whole system for tightness.
● If necessary, check the electrical connections.

5.3 Commissioning
The pressure reducing valve 544 is always part of a gas dosing system. Therefore
the other components determine the course of commissioning. Normally the
procedure is:

Versions without servomotor


13 ● Start the system.
● Loosen the nut (24) a bit and turn the adjusting screw (13) to the right or to
24 the left until the manometer shows the desired pressure.
● Tighten the nut (24).

Versions with servomotor


● Switch off the mains voltage.

WARNING Mortal danger!


! Switch off mains voltage before removing the cover of
the servomotor!

● Remove the cover of the servomotor.


● Set the "local/remote" switch to "local".
● Put the cover onto the servomotor.
● Switch on mains voltage.
● Start the system.
● Using the manual adjustment keys (at the lower side of the servomotor),
adjust the valve until the manometer shows the desired pressure.
● If the factory setting has to be changed: Adjust the limit switches
(➜ chapter 7.2).
● Switch off the mains voltage.
● Remove the cover of the servomotor.
● Set the "local/remote" switch to "remote".
● Put the cover onto the servomotor.
● Switch on mains voltage.

Suggested pressures
❏ 2-3 bar for Cl2
❏ 3-4 bar for NH3

16
6 Operation

6.1 Description of the Device


The pressure reducing valve 544 reduces the unregulated gas pressure of the gas
containers to a constant operation pressure.
It ensures the precise and pressure-independent functioning of the inlet valve of the
vacuum regulator and prevents re-liquefaction of the gas.
If the reducing valve is additionally equipped with an servomotor, it protects the
dosing unit in case of fault conditions against penetrating liquid gas by its immediate
shut-off function. In this case, the valve is controlled by the control panel of the
evaporator. In case of power failure, this version ensures immediate shut-off.
Via an adjusting screw the valve cone can be raised above the valve seat within
defined limits, so that the operating pressure can be adjusted to any setpoint value
between 2 and 3 bar for Cl2 (between 3 and 4 bar for NH3).
Pressure fluctuations are compensated for by the construction with spring-loaded
double diaphragm system, so that the operating pressure is kept constant (at
constant flow).
If the operating pressure exceeds the setpoint value, the spring-cone-diaphragm
system causes the valve to close.
If the pressure reducing valve 544 is connected to an Grundfos Alldos Gasdetect,
the valve will be immediately closed in case of a gas breakout.

17
6.2 Operation
Suggested pressures
❏ 2-3 bar for Cl2
❏ 3-4 bar for NH3

6.2.1 Versions without Servomotor

13 Adjusting the desired pressure


● Loosen the nut (24) a bit and turn the adjusting screw (13) to the right or to
24 the left until the manometer shows the desired pressure.
● Tighten the nut (24).

6.2.2 Versions with Servomotor

Automatic operation
No operation is necessary.

Switching from automatic to manual operation


● Switch off the mains voltage.

WARNING Mortal danger!


! Switch off mains voltage before removing the cover of
the servomotor!

● Remove the cover of the servomotor.


● Set the "local/remote" switch to "local".
● Put the cover onto the servomotor.
● Switch on mains voltage.

Manual operation
● At the control panel of the evaporator: Switch from automatic to manual
operation.
● Using the manual adjustment keys, adjust the valve until the manometer
shows the desired pressure.

Switching from manual to automatic operation


● Switch off the mains voltage.

WARNING Mortal danger!


! Switch off mains voltage before removing the cover of
the servomotor!

● Remove the cover of the servomotor.


● Set the "local/remote" switch to "remote".
● Put the cover onto the servomotor.
● Switch on mains voltage.
● At the control panel of the evaporator: Switch from manual to automatic
operation.

18
6.3 Possible Faults

Fault Cause Correction

Valve mounted in opposite flow


No gas flow. Mount the valve in the correct direction.
direction.

No gas flow (only valves with Establish power supply, possibly switch
No mains voltage.
servomotor). on the evaporator.

Servomotor is switched to manual Set the servomotor to automatic


operation and is in "closed" position. operation.

Valve closed because of a fault (e. g.


Eliminate the fault.
at the evaporator).

The pressure rises when the system is


switched off (the back pressure Replace the valve seat (17), clean the
Valve is not tight.
reaches the level of the admission valve cone.
pressure).

At maximum flow the back pressure


Desired flow rate cannot be reached. Back pressure too low.
must be set to at least 2 bar.

Valve soiled. Dismount the valve and clean it.

Gas supply not sufficient. Ensure sufficient gas supply.

Gas containers are almost empty. Replace the gas containers.

19
7 Maintenance

Rates for cleaning and maintenance:


❏ Replace gaskets every two years.
❏ In case of dirt accumulations.
❏ In case of malfunction.
❏ If the back pressure (the pressure after the reducing valve) rises for more
than 1.5 bar when the system is switched off. Then the valve is leaky.

WARNING Switch off the whole system before doing cleaning and
! maintenance work!

Before re-starting, check the tightness!

Danger of gas breakout!

7.1 Cleaning the Valve and


replacing the Gaskets
● Switch off the whole system.
● Take the valve off the line.
If the valve is mounted directly into the line: disassemble the valve.
● If present, take off the servomotor.
● Loosen the nut (24) and relieve the valve by turning the adjustment screw
(13).
● Loosen the screws (1.9) and take off the upper part, including diaphragms
(1.10, 1.11) and O-ring (1.20).
● Loosen the screws (1.1), take out the cover (1.2) and the valve cone (1.4)
with spring (1.5) and cap (1.7).
● Loosen the screws (1.8) and take out the cover (1.3) and the valve seat
(1.17) with O-ring (1.18).
● Clean all parts with hot water (ca. 40 °C) and dry them well.

CAUTION Danger of corrosion when mounting moist parts!

● Replace O-rings (1.18, 1.20) and flat gasket (1.6) by new ones.
● Remount all parts in reverse sequence.
• For versions with servomotor, observe assembly dimensions:

46,5 mm (R ½")
36,5 mm (R1") min. 1 mm

• The silver diaphragm must be placed at the gas-leading side (for


direction of installation, see spare parts drawing).

20
● If present, remount the servomotor.
● Remount the valve into the line.
● Restart the system.
● Check the tightness.
● Adjust the desired back pressure.

7.2 Adjusting the Limit


Switches (only Versions
with Servomotor)
If the back pressure should be adjusted to a different value than the factory setting,
the corresponding limit switch must also be adjusted.
At the servomotor, four limit switches are present:
❏ Two limit switches for controlling the motor:
S1 open
S2 closed
❏ Two limit switches for signalling the state of the valve:
S3 open
S4 closed
Normally the limit switches for "closed" need not be adjusted.
The limit switches S3 and S4 for signalling must be adjusted in a way that they switch
shortly before the limit switches S1 and S2. Otherwise the servomotor would stop
before its new position could be signalized.

Adjusting the "open" limit switches


● At first, set the valve manually to the desired pressure
(➜ chapter 5.3).
● Switch off the mains voltage.

WARNING Mortal danger!


! Switch off mains voltage before removing the cover of
the servomotor!

● Remove the cover of the servomotor.

CAUTION Do not loosen the locknuts (A)!

● Turn the cam S1 with a screwdriver until it operates the switch.


● Turn the cam S3 with a screwdriver until it operates the switch earlier than S1.
● Put the cover onto the servomotor.
● Switch on mains voltage.

21
8 Spare Parts

Spare parts sets


96688978 (553-181) Spare parts set for 544-101, -210 (Cl2)
95709195 (553-1817) Spare parts set for 544-1017, -2107 (NH3)
91835913 (553-182) Spare parts set for 544-102, -220 (Cl2)
91835914 (553-1827) Spare parts set for 544-1027, -2207 (NH3)

22
8.1 Spare Parts Drawings
Parts marked with * are part of the spare parts sets.

96693065 (544-101)

1.7 1.8 1.9 1.12 13

1.10*/1.11*

1.6*
1.5*
1.4
1.3
1.2

1.1

1.16 1.18* 1.20* 1.21 1.23 1.14* 1.15


1.17* 1.19 1.25 1.22* 24 12.2800-300

96729019 (544-102)

1.16 1.19 1.9 1.22* 1.23 1.14*


1.2 1.8 1.25 1.21 1.12 1.15

1.18*
1.7
1.5*
1.6*
1.1

1.3 1.4 1.10*/1.11* 13


1.17* 1.20* 24 12.2594-200

23
544 gb

96729028 (544-220-10001)

1 2 3 5

6 7 12.2615-110

96729024 (544-210-10000)

1 2 3 5

6 7 12.2615-120

24
Declaration of conformity

Declaration of conformity
GB: EU declaration of conformity DE: EG-Konformitätserklärung
We, Grundfos, declare under our sole responsibility that the product Wir, Grundfos, erklären in alleiniger Verantwortung, dass das Produkt
Pressure reducing valve 544, to which this declaration relates, is in Pressure reducing valve 544, auf das sich diese Erklärung bezieht, mit
conformity with these Council directives on the approximation of the laws den folgenden Richtlinien des Rates zur Angleichung der
of the EU member states: Rechtsvorschriften der EU-Mitgliedsstaaten übereinstimmt:

ES: Declaración de conformidad de la UE GR: ∆ήλωση συμμόρφωσης EE


Nosotros, Grundfos, declaramos bajo nuestra propia responsabilidad Εμείς, η Grundfos, δηλώνουμε με αποκλειστικά δική μας ευθύνη ότι τα
que el producto Pressure reducing valve 544, al cual se refiere esta προϊόντα Pressure reducing valve 544, στα οποία αναφέρεται η παρούσα
declaración, está conforme con las Directivas del Consejo en la δήλωση, συμμορφώνονται με τις εξής Οδηγίες του Συμβουλίου περί
aproximación de las leyes de los Estados Miembros del UE: προσέγγισης των νομοθεσιών των κρατών μελών της ΕΕ:

FR: Déclaration de conformité UE


Nous, Grundfos, déclarons sous notre seule responsabilité, que
le produit Pressure reducing valve 544, auquel se réfère cette
déclaration, est conforme aux Directives du Conseil concernant le
rapprochement des législations des Etats membres UE relatives aux
normes énoncées ci-dessous:

— Machinery Directive (2006/42/EC).


Standard used: DIN EN ISO 12100:2010.
— Low Voltage Directive (2014/35/EU).
Standard used: EN 60204-1:2007.
— EMC Directive (2014/30/EU).
Standards used: EN 61000-6-2:2006, EN61000-6-4:2007+A1:2011.

This EU declaration of conformity is only valid for products with


servomotor.

This EU declaration of conformity is only valid when published as part of


the Grundfos installation and operating instructions.

Pfinztal, 1st May 2016

Ulrich Stemick
Technical Director
Grundfos Water Treatment GmbH
Reetzstr. 85, D-76327 Pfinztal, Germany

Person authorised to compile technical file and


empowered to sign the EU declaration of conformity.
Argentina Denmark Korea Slovakia

Grundfos companies
Bombas GRUNDFOS de Argentina S.A. GRUNDFOS DK A/S GRUNDFOS Pumps Korea Ltd. GRUNDFOS s.r.o.
Ruta Panamericana km. 37.500 Centro Martin Bachs Vej 3 6th Floor, Aju Building 679-5 Prievozská 4D
Industrial Garin DK-8850 Bjerringbro Yeoksam-dong, Kangnam-ku, 135-916 821 09 BRATISLAVA
1619 - Garin Pcia. de B.A. Tlf.: +45-87 50 50 50 Seoul, Korea Phona: +421 2 5020 1426
Phone: +54-3327 414 444 Telefax: +45-87 50 51 51 Phone: +82-2-5317 600 sk.grundfos.com
Telefax: +54-3327 411 111 E-mail: info_GDK@grundfos.com Telefax: +82-2-5633 725
www.grundfos.com/DK
Slovenia
Australia Latvia GRUNDFOS d.o.o.
GRUNDFOS Pumps Pty. Ltd. Estonia SIA GRUNDFOS Pumps Latvia Šlandrova 8b, SI-1231 Ljubljana-Črnuče
P.O. Box 2040 GRUNDFOS Pumps Eesti OÜ Deglava biznesa centrs Phone: +386 1 568 0610
Regency Park Peterburi tee 92G Augusta Deglava ielā 60, LV-1035, Rīga, Telefax: +386 1 568 0619
South Australia 5942 11415 Tallinn Tālr.: + 371 714 9640, 7 149 641 E-mail: slovenia@grundfos.si
Phone: +61-8-8461-4611 Tel: + 372 606 1690 Fakss: + 371 914 9646
Telefax: +61-8-8340 0155 Fax: + 372 606 1691
South Africa
Lithuania Grundfos (PTY) Ltd.
Austria Finland GRUNDFOS Pumps UAB Corner Mountjoy and George Allen Roads
GRUNDFOS Pumpen Vertrieb Ges.m.b.H. OY GRUNDFOS Pumput AB Smolensko g. 6 Wilbart Ext. 2
Grundfosstraße 2 Trukkikuja 1 LT-03201 Vilnius Bedfordview 2008
A-5082 Grödig/Salzburg FI-01360 Vantaa Tel: + 370 52 395 430 Phone: (+27) 11 579 4800
Tel.: +43-6246-883-0 Phone: +358-(0)207 889 500 Fax: + 370 52 395 431 Fax: (+27) 11 455 6066
Telefax: +43-6246-883-30 Telefax: +358-(0)207 889 550 E-mail: lsmart@grundfos.com
Malaysia
Belgium France GRUNDFOS Pumps Sdn. Bhd. Spain
N.V. GRUNDFOS Bellux S.A. Pompes GRUNDFOS Distribution S.A. 7 Jalan Peguam U1/25 Bombas GRUNDFOS España S.A.
Boomsesteenweg 81-83 Parc d’Activités de Chesnes Glenmarie Industrial Park Camino de la Fuentecilla, s/n
B-2630 Aartselaar 57, rue de Malacombe 40150 Shah Alam E-28110 Algete (Madrid)
Tél.: +32-3-870 7300 F-38290 St. Quentin Fallavier (Lyon) Selangor Tel.: +34-91-848 8800
Télécopie: +32-3-870 7301 Tél.: +33-4 74 82 15 15 Phone: +60-3-5569 2922 Telefax: +34-91-628 0465
Télécopie: +33-4 74 94 10 51 Telefax: +60-3-5569 2866
Belarus Sweden
Представительство ГРУНДФОС в Germany Mexico GRUNDFOS AB
Минске GRUNDFOS Water Treatment GmbH Bombas GRUNDFOS de México S.A. de (Box 333) Lunnagårdsgatan 6
220125, Минск Reetzstraße 85 C.V. 431 24 Mölndal
ул. Шафарнянская, 11, оф. 56 D-76327 Pfinztal (Söllingen) Boulevard TLC No. 15 Tel.: +46 31 332 23 000
Тел.: +7 (375 17) 286 39 72, 286 39 73 Tel.: +49 7240 61-0 Parque Industrial Stiva Aeropuerto Telefax: +46 31-331 94 60
Факс: +7 (375 17) 286 39 71 Telefax: +49 7240 61-177 Apodaca, N.L. 66600
E-mail: minsk@grundfos.com E-mail: gwt@grundfos.com Phone: +52-81-8144 4000
Switzerland
Telefax: +52-81-8144 4010 GRUNDFOS ALLDOS International AG
Bosnia/Herzegovina Germany Schönmattstraße 4
GRUNDFOS Sarajevo GRUNDFOS GMBH Netherlands CH-4153 Reinach
Trg Heroja 16, Schlüterstr. 33 GRUNDFOS Netherlands Tel.: +41-61-717 5555
BiH-71000 Sarajevo 40699 Erkrath Veluwezoom 35 Telefax: +41-61-717 5500
Phone: +387 33 713 290 Tel.: +49-(0) 211 929 69-0 1326 AE Almere E-mail: grundfosalldos-CH@grundfos.com
Telefax: +387 33 659 079 Telefax: +49-(0) 211 929 69-3799 Postbus 22015
e-mail: grundfos@bih.net.ba E-mail: infoservice@grundfos.de 1302 CA ALMERE
Switzerland
Service in Deutschland: Tel.: +31-88-478 6336 GRUNDFOS Pumpen AG
Brazil E-mail: kundendienst@grundfos.de Telefax: +31-88-478 6332 Bruggacherstrasse 10
BOMBAS GRUNDFOS DO BRASIL E-mail: info_gnl@grundfos.com CH-8117 Fällanden/ZH
Av. Humberto de Alencar Castelo Branco, Greece Tel.: +41-44-806 8111
630 GRUNDFOS Hellas A.E.B.E. New Zealand Telefax: +41-44-806 8115
CEP 09850 - 300 20th km. Athinon-Markopoulou Av. GRUNDFOS Pumps NZ Ltd.
São Bernardo do Campo - SP P.O. Box 71 17 Beatrice Tinsley Crescent
Taiwan
Phone: +55-11 4393 5533 GR-19002 Peania North Harbour Industrial Estate GRUNDFOS Pumps (Taiwan) Ltd.
Telefax: +55-11 4343 5015 Phone: +0030-210-66 83 400 Albany, Auckland 7 Floor, 219 Min-Chuan Road
Telefax: +0030-210-66 46 273 Phone: +64-9-415 3240 Taichung, Taiwan, R.O.C.
Bulgaria Telefax: +64-9-415 3250 Phone: +886-4-2305 0868
Grundfos Bulgaria EOOD Hong Kong Telefax: +886-4-2305 0878
Slatina District GRUNDFOS Pumps (Hong Kong) Ltd. Norway
Iztochna Tangenta street no. 100 Unit 1, Ground floor GRUNDFOS Pumper A/S
Thailand
BG - 1592 Sofia Siu Wai Industrial Centre Strømsveien 344 GRUNDFOS (Thailand) Ltd.
Tel. +359 2 49 22 200 29-33 Wing Hong Street & Postboks 235, Leirdal 92 Chaloem Phrakiat Rama 9 Road,
Fax. +359 2 49 22 201 68 King Lam Street, Cheung Sha Wan N-1011 Oslo Dokmai, Pravej, Bangkok 10250
email: bulgaria@grundfos.bg Kowloon Tlf.: +47-22 90 47 00 Phone: +66-2-725 8999
Phone: +852-27861706 / 27861741 Telefax: +47-22 32 21 50 Telefax: +66-2-725 8998
Canada
GRUNDFOS Canada Inc.
Telefax: +852-27858664
Poland Turkey
2941 Brighton Road Hungary GRUNDFOS Pompy Sp. z o.o. GRUNDFOS POMPA San. ve Tic. Ltd. Sti.
Oakville, Ontario GRUNDFOS Hungária Kft. ul. Klonowa 23 Gebze Organize Sanayi Bölgesi
L6H 6C9 Park u. 8 Baranowo k. Poznania Ihsan dede Caddesi,
Phone: +1-905 829 9533 H-2045 Törökbálint, PL-62-081 Przeźmierowo 2. yol 200. Sokak No. 204
Telefax: +1-905 829 9512 Phone: +36-23 511 110 Tel: (+48-61) 650 13 00 41490 Gebze/ Kocaeli
Telefax: +36-23 511 111 Fax: (+48-61) 650 13 50 Phone: +90 - 262-679 7979
China Telefax: +90 - 262-679 7905
Grundfos Alldos India Portugal E-mail: satis@grundfos.com
Dosing & Disinfection GRUNDFOS Pumps India Private Limited Bombas GRUNDFOS Portugal, S.A.
ALLDOS (Shanghai) Water Technology 118 Old Mahabalipuram Road Rua Calvet de Magalhães, 241
Ukraine
Co. Ltd. Thoraipakkam Apartado 1079 Бізнес Центр Європа
West Unit, 1 Floor, No. 2 Building (T 4-2) Chennai 600 097 P-2770-153 Paço de Arcos Столичне шосе, 103
278 Jinhu Road, Jin Qiao Export Process- Phone: +91-44 4596 6800 Tel.: +351-21-440 76 00 м. Київ, 03131, Україна
ing Zone Telefax: +351-21-440 76 90 Телефон: (+38 044) 237 04 00
Pudong New Area
Indonesia Факс.: (+38 044) 237 04 01
Shanghai, 201206 PT. GRUNDFOS POMPA Romania E-mail: ukraine@grundfos.com
Graha Intirub Lt. 2 & 3 GRUNDFOS Pompe România SRL
Phone: +86 21 5055 1012
Jln. Cililitan Besar No.454. Makasar, Bd. Biruintei, nr 103
United Arab Emirates
Telefax: +86 21 5032 0596 GRUNDFOS Gulf Distribution
E-mail: grundfosalldos-CN@grundfos.com Jakarta Timur Pantelimon county Ilfov
ID-Jakarta 13650 Phone: +40 21 200 4100 P.O. Box 16768
China Phone: +62 21-469-51900 Telefax: +40 21 200 4101 Jebel Ali Free Zone
GRUNDFOS Pumps (Shanghai) Co. Ltd. Telefax: +62 21-460 6910 / 460 6901 E-mail: romania@grundfos.ro Dubai
10F The Hub, No. 33 Suhong Road Phone: +971-4- 8815 166
Minhang District
Ireland Russia Telefax: +971-4-8815 136
GRUNDFOS (Ireland) Ltd. ООО Грундфос
Shanghai 201106
Unit A, Merrywell Business Park Россия, 109544 Москва, ул. Школьная
United Kingdom
PRC GRUNDFOS Pumps Ltd.
Phone: +86-21 6122 5222 Ballymount Road Lower 39
Dublin 12 Тел. (+7) 495 737 30 00, 564 88 00 Grovebury Road
Telefax: +86-21 6122 5333 Leighton Buzzard/Beds. LU7 4TL
Phone: +353-1-4089 800 Факс (+7) 495 737 75 36, 564 88 11
Croatia Telefax: +353-1-4089 830 E-mail grundfos.moscow@grundfos.com Phone: +44-1525-850000
GRUNDFOS CROATIA d.o.o. Telefax: +44-1525-850011
Italy Serbia
Cebini 37, Buzin
GRUNDFOS Pompe Italia S.r.l. GRUNDFOS Predstavništvo Beograd
U.S.A.
HR-10010 Zagreb GRUNDFOS Pumps Corporation
Phone: +385 1 6595 400 Via Gran Sasso 4 Dr. Milutina Ivkovića 2a/29
I-20060 Truccazzano (Milano) YU-11000 Beograd 17100 West 118th Terrace
Telefax: +385 1 6595 499 Olathe, Kansas 66061
www.hr.grundfos.com Tel.: +39-02-95838112 Phone: +381 11 26 47 877 / 11 26 47 496
Telefax: +39-02-95309290 / 95838461 Telefax: +381 11 26 48 340 Phone: +1-913-227-3400
Czech Republic Telefax: +1-913-227-3500
Japan Singapore
GRUNDFOS s.r.o.
GRUNDFOS Pumps K.K. GRUNDFOS (Singapore) Pte. Ltd.
Uzbekistan
Čapkovského 21 Grundfos Tashkent, Uzbekistan The Repre-
779 00 Olomouc Gotanda Metalion Bldg. 5F, 25 Jalan Tukang
5-21-15, Higashi-gotanda Singapore 619264 sentative Office of Grundfos Kazakhstan in
Phone: +420-585-716 111 Uzbekistan
Telefax: +420-585-716 299 Shiagawa-ku, Tokyo, Phone: +65-6681 9688
141-0022 Japan Telefax: +65-6681 9689 38a, Oybek street, Tashkent
Phone: +81 35 448 1391 Телефон: (+998) 71 150 3290 / 71 150
Telefax: +81 35 448 9619 3291
Факс: (+998) 71 150 3292