Span

S. Road Arrangement
Bridge details
No description No. of Spans x
Span Length
1 Bridge on New four- lane (2 x 4 x 30m
Road No. 12.5m) High level (HL) (Total
U08 bridge with footpath on Length:120m)
(Manzel both sides; of
Creek) approximate length of
120m on the creek
including its
approaches.
2 Bridge on New two - lane (1 x 1 x 25m + 1 x
Road No. 12.5m) High level (HL) 30m + 1 x 25m
U09 bridge with footpath on (Total
(Manzel both sides; of Length:80m)
Creek) approximate length of
80m on the creek
including its
approaches.
3 Bridge on New four- lane (2 x 2 x 30m
Road No. 12.5m) High level (HL) (Total
U10 bridge with footpath on Length:60m)
(Manzel both sides; of
Creek) approximate length of
60m on the creek
including its
approaches.
4 Bridge at New two - lane (1 x 1 x 40m
Kamat Bay 12.5m) High level (HL) (Total
bridge with footpath on Length:40m)
both sides; of
approximate length of
40m on the creek
including its
approaches.