You are on page 1of 3

1/11/2019 Calculation Sheet Lifting Set DNV 2.

7-1

Sustaining Results Through Engineering Voer een trefwoord in Zoek

Home | Diensten | Werkwijze | Expertise | Referenties | Tools | Organisatie

Tools Wij zijn opzoek naar een Stress/FEA Engineer!

Publicaties Calculation Sheet Offshore Pad Eyes acc. to DNV 2.7-1


With this sheet a standard sling set including pad eyes is proposed in accordance with DNV 2.7-1
Online tools and/or EN 12079. The dimensions may be altered for an optimized design.

Code DNV Certification Notes No.2.7-1: April 2006


Calculation Sheet Lifting Set Sling type Steel Cored Rope Sling, grade 1770
DNV 2.7-1 Efficiency of sling termination K=0.9 (for ferrule secured eyes)
Design temperature -20 ºC
Shackle type Green pin anchor shackle with bolt - Type IV, Class 6
Links naar overige online tools
Design loads

Normen en Richtlijnen Tare mass T 3500 kg

Payload P 12000 kg

Load contingency CO 3%

Rating R 15965 kg

Working Load Limit WLLmin 20 tonnes

Number of slings n 4

Maximum sling angle ß 45° to vertical

Length between lugs LL 6000 mm

Width between lugs LW 2400 mm

Minimum sling length SL 4569 mm

Container length CL 6060 mm

Container width CW 2630 mm

Container height CH 2460 mm

Master link

WLL masterlink required WLLrqd 20 tonnes

WLL masterlink chosen 21,2 tonnes

size 26-8

Usage Factor UF 4

MBL master link chosen MBL 84,8 tonnes

Actual Factor Against Failure FAF 4,23

Quad assembly

WLL quad assembly required WLLrqd 20 tonnes

WLL quad assembly chosen WLLchs 21,2 tonnes

https://www.stemar.com/tools/node-27-nl-nl/calculation-lifting-set-according-dnv-2.7-1 1/3
1/11/2019 Calculation Sheet Lifting Set DNV 2.7-1
size 18-8

Usage Factor UF 4

MBL master link chosen MBL 84,8 tonnes

Actual Factor Against Failure FAF 4,23

Fore runner

Diam fore runner required Dfr;r 44 mm

Usage Factor UF 5

MBL fore runner chosen MBL 124 tonnes

Actual Factor Against Failure FAF 5,57

Reach Down Height quad RDHquad 1528 mm

» Minimum For Runer length of 228mm recommended

Sling legs

Diam sling legs required Dsl;r 32 mm

Usage Factor UF 5

MBL sling leg chosen MBL 65,8 tonnes

Actual Factor Against Failure FAF 8,36

Shackles

WLL shackle required WLLrqd 9,4 tonnes

WLL shackle chosen WLLchs 9,5 tonnes

Pin Diam d 32 mm

Inside Width a 47 mm

Inside Length c 108 mm

Pad-eyes

Resulting Sling Load RSL 221,5 kN

Material S355

Re;pl 345 N/mm2


With cheek plates

Hole Diam (<1,06*Pin Diam) DH 33 mm

Padeye radius H 60 mm

Plate thickness tp 25 mm

Cheek plate thickness tc 8 mm

Outer diameter of cheek plate Dcheek 80 mm

Total thickness t 41 mm

Filling grade Eye FGEye 0,87

Filling grade Pin FGpin 1,03

Shackle clearance CL 64 mm

Contact stress σcont 303,2 N/mm2


Tear out stress σtear 305,5 N/mm2
F 40 mm

E 75 mm

L 180 mm

This sheet is for study purposes only. Stemar Engineering is in no way responsible for any
consequences due to utilising this calculation sheet. Results must always be checked with regard to
code conformity by a qualified engineer.

https://www.stemar.com/tools/node-27-nl-nl/calculation-lifting-set-according-dnv-2.7-1 2/3
1/11/2019 Calculation Sheet Lifting Set DNV 2.7-1

Stemar Engineering BV

Berenkoog 32 | 1822 BJ Alkmaar


T: +31 (0)72 561 52 54 | F: +31 (0)72 562 36 37
W: www.stemar.com
K.v.K. Alkmaar 37045056

Contact Disclaimer & Privacy Policy Product sheets

Created by Trefnet · Powered by Shark CMS

https://www.stemar.com/tools/node-27-nl-nl/calculation-lifting-set-according-dnv-2.7-1 3/3

You might also like