DATE Emergency 8/8/2019 8/8/2019 Assembly point -Installation of sign post -1masons -Cement Wheelbarrow -1heper -Aggregate Spades -Sand Trowel -Water Construction of -Excavation -2 masons -Cement 8/8/2019 8/8/2019 Generator shed -Casting of slab -2 helpers -Aggregate Wheelbarrow -Installing Pols -Sand Back hoe Excavator -Fixing iron sheets -Pols Spades -Roofing -Roofing nails Trowel -5inch nail -Water Installation of -Purchase and Transportation 2 Operators -10trips of Tipper truck 8/8/2019 9/8/2019 Boulders to -Installation boulders Excavator protect the diversion drift. Improvement -Laying of Marram 1mason -1Trip of Plate Compactor 8/9/2019 8/8/2019 of Kitchen floor -Applying Moisture 2helpers Marram and seat -Levelling and compaction -Water Installation -Installation of seats -6pcs of 8’’x1’’ -8pcs of poles Installation of -Installation of base footings 1 Operator -Belt for the High up crane 10/8/2019 11/8/2019 Containers for -Carrying and lifting from Nalakasi 1 Mason High up crane workshop and camp to Secondary camp store -Transporting to site Installation of -Gathering and assembling from 2Carpenters -Rivet gun -Tipper truck 9/8/2019 12/8/2019 prefabricated elements and fittings from the 3Helpers -Tape Measure office primary camp. -Strings -Fixing and Installation. Construction of -Excavation of Foundation 2Masons -Cement Wheelbarrow 8/8/2019 12/8/2019 Ablution for -Blinding and backfill 2helpers -Aggregate Back hoe Excavator Senior staffs -Floor slab -Sand Spades -Superstructure wall(Timber poles -Roofing nails Trowel and Iron sheet) -5inch nail Harmer -Roofings -Water -Plumbing works -Iron sheet -Timber(4x2) -Iron sheets -timber poles
Construction of -Substructure wall construction 2masons -Cement Wheelbarrow 8/8/2019 17/8/2019
Huts For Senior -Superstructure wall construction 2helpers -Sand Back hoe Excavator Staffs. -Roofing -Bricks Spades -Plumbing works -Grass Trowel -Plastering -Poles -Purlins -Rebar -Links Dismantling -Measurements and taking -Rigor Team -will be Moverble crane 15th/8/2019 25th/8/2019 Bailey Bridge dimension requested by -Greasing and removing primary the Rigor head member -Unbolting and lifting using a moval crane -Storage for use in the next repair Steel Cutting, -Request and deliverance of Rebar Steel Gloves Welding machine 15th/8/2019 15th/10/019 Bending and T16,Links for the abutment Fixtures Eye protection Grinding machine formwork footings team wears Torque Wretch preparation Safty boots Bending table Hollow pipe Excavation of -Taking levels 3operators Total station 25th/8/2019 5th/9/2019 Foundation -Excavation 1 Surveyor Staff Abutment -Compaction 1Helper Tipper Truck Laboratory test Equipment Ground -Request and Delivery of materials 2 operator CRR Tipper truck 6th/9/2019 14th/9/2019 Improvement at site. Masons Geogrid Jumper -Storage and usage for backfill on Blinding Excavator the subgrade of the foundation Hardcore Back hoe abutment.