KONTRAKTOR :
ITEM PEK. GALIAN TANAH
STA. 0 + 00 STA. 0 + 10
1020 8
1050
STA. 0 + 30 STA. 0 + 40
810
710
STA. 0 + 60 STA. 0 + 70
830
Luas Rata-Rata
STATION Lebar Lebar Rata -rata penampang Luas
penampang
M' M2
0 + 00 9.60 12.80
9.30 13.55
0 + 10 9.00 14.30
9.45 13.90
0 + 20 9.90 13.50
10.20 19.00
0 + 30 10.50 24.50
10.35 19.70
0 + 40 10.20 14.90
9.30 20.05
0 + 50 8.40 25.20
8.25 29.80
0 + 60 8.10 34.40
7.60 26.35
0 + 70 7.10 18.30
7.30 20.95
0 + 80 7.50 23.60
7.90 21.45
0 + 86 8.30 19.30
JU
SUB. TOTAL VOLUME G
K UP DATA ( QUANTITY )
AN TALUD KERAMBA TRANSIT INDUK IKAN DI DANAU SENTANI
Minggu Ke 3
990
STA. 0 + 20
840
STA. 0 + 50
750
STA. 0 + 80
830
STA. 0 + 86
Panjang Volume
M' M3
10.00 135.50
10.00 139.00
10.00 190.00
10.00 197.00
10.00 200.50
10.00 298.00
10.00 263.50
10.00 209.50
6.00 128.70
JUMLAH = 1,761.70
SUB. TOTAL VOLUME GALIAN = 1,761.70