You are on page 1of 1

Ruj.

Tuan:
Ruj.Kami:
Tarikh:

Tajuk:
TOPOGRAFI SURVEY

Ruj.Tuan :

ITEM PERKARA RUJ.K.KEW KUANTITI KADAR (RM) JUMLAH (RM)


1 PREPARATORY WORK Part I,5.1 0.0 pday 743.00 /pday 0.00
2 MOBILIZATION AND DEMOBILIZATION Part I,5.2 0.0 km /km 0.00
3 PLANIMETRIC CONTROL
a.Flat and undulating Part I,1.5.1(I) 0.0 km 2,000.00 /km 0.00
b. Hilly area Part I,1.5.1(ii) 0.0 km 2,000.00 /km 0.00
c.Swampy area Part I,1.5.1(iii) 0.0 km 2,000.00 /km 0.00
d.Built Up area Part I,1.5.1(iv) 0.0 km 2,500.00 /km 0.00
4 DEMARCATION OF BOUNDARIES
a.Flat and undulating Part I,1.5.1(I) 0.0 km 2,000.00 /km 0.00
b. Hilly area Part I,1.5.1(ii) 0.0 km 2,000.00 /km 0.00
c.Swampy area Part I,1.5.1(iii) 0.0 km 2,000.00 /km 0.00
d.Built Up area Part I,1.5.1(iv) 0.0 km 2,500.00 /km 0.00
5 HEIGHT CONTROL AND CONNECTION Part I,1.6.1 0.0 km 464.37 /km 0.00
6 MONUMENTING OF TBMs (accessible) Part I,1.7.1 0.0 unit 185.75 /unit 0.00
7 SURVEY IN SECURITY AREAS Part I,1.8 0.0 km /km 0.00
8 SURVEY IN INACCESSIBLE AREAS Part I,1.9 0.0 km /km 0.00
9 REIMBURSABLE Part I,1.10
10 TOPOGRAPHICAL SURVEY
a.Flat and undulating area Part I,.5.9(i) 0.0 ha 594.40 /ha 0.00
b. Hilly area Part I,.5.9(ii) 0.0 ha 0.00 /ha 0.00
c.Swampy area Part I,.5.9(iii) 0.0 ha 743.00 /ha 0.00
d.Built Up area Part I,5.9(iv) 0.0 ha 743.00 /ha 0.00
11 GRID HEIGHTING
a.Developed area Part I,2.10.2(I) 0.0 km 3,715.00 /km 0.00
b.Built up area Part I,2.10.2(ii) 0.0 km 4,458.00 /km 0.00
c.Undeveloped area Part I,2.10.2(iii) 0.0 km 2,972.00 /km 0.00
d.Swampy area Part I,2.10.2(iv) 0.0 km 4,086.50 /km 0.00
12 Preparation of Land Acquisition Plans Part I,5.15
13 Processing,Conversion and Translation of Digital Data together Part I,5.16
14 with Quality Assurance
15 Transformation of Co-ordinates Part I,5.17
16 SUB-TOTAL 0.00
17 Government service tax 6% 0.00
GRAND TOTAL 0.00

You might also like