-10th Corrigenda & Addenda to PWD (WB), SOR: 2015-16 Volume III: Road & Bridge Works

10th. ADDENDA & CORRIGENDA


TO THE PWD (WB), SCHEDULE OF RATES- 2015-16
Volume III: Road & Bridge Works

Dated: 28th June, 2017.

CORRIGENDA
OF SCHEDULEOFRATES- 2015-16

1.Following Corrections are to be made to the Item no. 14.05, page no. - 304
of SOR- 2015-16, as shown below:

All districts of
West Bengal and Darjeeling
Item DarjeelingPlain Hill Area
No. Description of Items Unit of Siliguri Sub- Remarke
Division
Rate (Rs) Rate (Rs)
14.05 a) Supplying transporting & fabrication of welded
steel girder as per approved drawing duly made up
built up sections of MS Plate, Angle, Channel of
different thickness including metalizing priming coat
followed by finish coat of paints of total thickness of
165pm . The rate shall be inclusive of supply of a"
the steels, labour consumables & machinery and a"
other materials & accessories required for
fabrication to complete in all respect with a" lead, lift
etc. The rate is also includes( i) Cost of to and fro
transportation between contractor's work shop & tonne 42000.00 44000.00
work site including a" lead, lift, loading, unloading
etc. (ii) Cost of inspection, testing of girders in
stages by nominated inspection agency.
Nomination of inspection agency for passing of
fabricated members and trial assembly wi" be
decided by Engineer-in-Charge. iii) Cost of
supplying & fixing of HSFGI High strength bolts (not
less than 8.8 grade). iv) Cost of blast-cleaning the
steel surface including supplying & applying of zinc
phosphate primer followed by finish coat of
micaceous iron oxide pigmented drying oil type
paint of total thickness of 165pm.

Note: Add cost & carriage of 1.05 MT Structural


steel to arrive at consolidated item rate.
b) Assembling, erection I launching of fabricated
steel girders in proper position, line, level,
alignment including erection of staging and
scaffolding, dismantling the same after completion
of work. The rate shall be inclusive a" complete in
a" respect with all materials, labour, tools & plants, tonne
lead and lift. This item pertains to erection of 13000.00 13000.00
girders by contractor's own cranes I derricks I
staging, machineries, plants & equipment etc.,
wherever required to complete the job, as per
approved drawing. The rate is inclusive of a"
standby cranes, equipment, machineries etc. as
directed by Engineer-in-charge to complete the
work.

1
'/
, .](1" Corrigenda & Addenda to PWD (WB), SOR: 2015-16 Volume III: Road & Bridge Works

Following Corrections are to be made to the item as shown below:


I-- In Place Of To be read as
Page No Item No. I 81. No. All dist. OfW.B. & Darjeeling Darjeeling Hill All dist. Of W.B. & Darjeeling Darjeeling Hill
Plain of Siliguri Sub-Dlvislon Area Plain of Siliguri Sub-Dlvision Area
Rate (Rs) Rate (Rs) RatelRs) Rate (Rs)
261 6.03 1188.00 2265.00 2004.00 2381.00

ADDENDA OF SCHEDULE OF RATES - 2015-16

All district of West


Bengal and Darjeeling
Section SI. No. Description Unit Darjeeling Plain of Hill Area
Siliguri Sub
Division Rate (Rs)
RateJR~
Providing and laying RCC Pipe NP3 as per
11.03 design in single row
(E)&(F) E) 1400 mm dia metre 1578.00 1588.00
New F) 1800 mm dia metre 2374.00 2389.00
11.04 Providing and laying RCC Pipe NP4 as per
Chapter (E)&(F) design in single row
11 New E) 1400 mm dia metre 1640.00 1650.00
F) 1800 mm dia metre 2417.00 2430.00
Pipe 11.05 Providing and laying RCC Pipe NP3 as per
Culverts (E)&(F) design in double row
New E) 1400 mm dia metre 3251.00 3431.00
F) 1800 mm dia metre 4882.00 5066.00
11.06 Providing and laying RCC Pipe NP4 as per
(E)&(F) design in double row
New E) 1400 mm dia metre 3401.00 3425.00
F) 1800 mm dia metre 4949.00 4979.00
12.10
In Hard Rock (7m dia Well)
I.C. metre 25377.00 26084.00
Depth in Hard Rock strata upto 3m
(New)
12.10
In Hard Rock (8m dia Well)
II.C. 25784.00 26491.00
Depth in Hard Rock strata upto 3m metre
(New)
12.10
In Hard Rock (9m dia Well)
III.C. metre 29803.00 30633.00
Depth in Hard Rock strata upto 3m
(New)
Chapter
12.10
12 In Hard Rock (10m dia Well)
IV.C. metre 35194.00 36298.00
Depth in Hard Rock strata upto 3m
(New)
I Sub-
12.10
I Structure In Hard Rock (11 m dia Well)
i V.C. metre 79901.00 82495.00
I Depth in Hard Rock strata upto 3m
(New)
12.10
In Hard Rock (12m dia Well)
VI.C. metre 185043.00 191477.00
Depth in Hard Rock strata upto 3m
(New)
I 12.14 Providing Bored Cast-m-sltu R.C.C. pile in
(a) (vii) position as per specifications ..
I (New) Using hydraulic piling rig:
i Pile diameter - 1800 mm metre 6203.00
,__
. ___l ~~~:'::':::':::_____:_:_::_:_:_:_:::_:_-----_j_~::__:__L__------'-------'

2
--- -----

10th Corrigenda & Addenda to PWD (WB), SOR: 2015-16


Volume III: Road & Bridge Works
12.25 Performing High Strain Dynamic Pile Load testing
(New) by using Pile Driving Analyzer as per IRC: 78.2014
standard procedure with a hammer of suitable
weight (1·2% of the test load or 5·7% of the dead
load on the pile or suitable energy as decided by
Engineer-in charge). The rate is inclusive of

I construction of suitable platform, fixing of strain


sensor & accelerometer, charges for hammer
holstinq arrangement & removing etc. The rate is

I
I
also inclusive of cost & carriage of all materials,
completion of field test, CAPWAP analysis &
submission of test results along with reports as per
direction of Engineer.in.charge.
a) For Test load 0 to 100 MT
i)Within 60 km from Rajbhaban Each 66662.00
ii)From 60·150 Km of Rajbhaban Each 79305.00
iii)Rest of South Bengal Each 94247.00
iv) For North Bengal Each 108384.00 108384.00
b)For T·estload 101 to 300 MT
i)Within 60 km from Rajbhaban Each 102292.00
ii)From 60-150 Km of Rajbhaban Each 118383.00
iii)Rest of South Bengal Each 140221.00
iv) For North Bengal Each 1161254.00 1161254.00
c)For Test load 301 to 500 MT
i)Within 60 km from Rajbhaban Each 126429.00
ii)From 60·150 Km of Rajbhaban Each 150565.00
iii)Rest of South Bengal Each 172977.00
iv) For North Bengal Each 198924.00 198924.00
Supply, testing, fitting, fixing and welding with stud guns
etc. of normal headed shear studs / shear connectors
25mm dia and 200 mm length conforming to IS: 3935-66
14.21 as per specifications of approved drawing along with
ferrules to top flange of girder for deck slabs as per the
(New) direction / approval of Engineer in charge. (In case the Sqm 338.00 338.00
shear connectors of any other size is required then
payment shall be made on pro-rata basis in proportion of
Chapter the weight of the shear connectors).
14 Providing and Painting of structural steel surfaces of
bridge members by fj'l'i.t blast cleaning or centrifugal
Super- blasting with a suitable abrasive materials like (."'v'''~!A
~~ in accordance with clause-III of IS 6586 : 1989
Structure
immediately before painting , to make the surface free
from grease, oil, rust and other foreign materials. The
14.22 rate includes supply of abrasive sand, fuel, cost of paint Sqm
(New) including all transportation, lead, lift and labour charges, 593.00 593.00
consumables, tools & plants complete in all respect but
exclusive of cost for staging/scaffolding. Painting of
approved Zinc-phosphate primer of OFT 65 micron
followed by finish coat of Micaceous iron oxide
l ~ ~p_ig_m_e_n_te_d_d_~_in_g_O_il_trr~_rai-n-to-f-D_F_T_75_m
__ic_ro_n_. ~ ~ ~~~~--~

-c. ~~\'1
~_.:J -: U1-~ \v'" (
..J< ~,;y ~ ~ r--
'l.'6\ ~ 'fcfw I ,,~) '-
- (TAPASHKR. DEY) WAJIT Y) (DEBASHIS OY) ,(SRI AR BHATTACHARYA)
SuoerintendingEngineer Superintending Engineer Superintending Engineer Engineer-in-Chief
3liuge Planning Circle Survey& Design Circle Planning & Monitoring Circle Public Works Department
tl"mber of the Combined Member of the Combined Member Convener of the Chairman of the Combined Schedule
HGt;,:duleCommittee PW Dte. & Schedule Committee PW Dte. & Combined Schedule Committee Committee PW Ote. & PW (Roads)
PW( Roads) Dte. PW (Roads) Ote. PW Ote. & PW (Roads) Ote. Ote.