ALLOWABLE PILE CAPACITY BASED ON CPT

PC Pile : 25x25cm, 35x35cm, 40x40cm


Safety Factor : Friction = 5.0 & End Bearing = 3.0
Project : PEMBANGUNAN SMKN 71 JAKARTA TIMUR
Location : Jl.Rajiman Widyadiningrat Pulo Jahe RT.09/05-Jatinegara,Jakarta Timur
DATA : SONDIR UKURAN TIANG PANCANG (CM )
25 35 40
Soil Parameter Allowable Tension Allowable Compression
Depth Elv. Sondir Capacity (ton) Capacity (ton)
(m) (m) Type qc Tf
Kg/cm2 Kg/cm
25x25 35x35 40x40 25x25 35x35 40x40
0 0 S1 0 0 0.00 - - 0.00 0.00 0.00
1 -1 5 56 1.12 1.57 1.79 2.16 3.61 4.46
2 -2 10 112 2.24 3.14 3.58 4.32 7.22 8.92
3 -3 20 200 4.00 5.60 6.40 8.17 13.77 17.07
4 -4 21 272 5.44 7.62 8.70 9.82 16.19 19.90
5 -5 50 382 7.64 10.70 12.22 18.06 31.11 38.89
5.6 -5.6 250 492 9.84 13.78 15.74 61.92 115.86 149.08

0 0 S2 0 0 0.00 - - 0.00 0.00 0.00


1 -1 14 66 1.32 1.85 2.11 4.24 7.56 9.58
2 -2 14 114 2.28 3.19 3.65 5.20 8.91 11.11
3 -3 21 204 4.08 5.71 6.53 8.46 14.29 17.73
4 -4 25 282 5.64 7.90 9.02 10.85 18.10 22.36
5 -5 16 336 6.72 9.41 10.75 10.05 15.94 19.29
6 -6 185 478 9.56 13.38 15.30 48.10 88.93 113.96
6.2 -6.2 250 498 9.96 13.94 15.94 62.04 116.03 149.27

0 0 S3 0 0 0.00 - - 0.00 0.00 0.00


1 -1 25 100 2.00 2.80 3.20 7.21 13.01 16.53
2 -2 10 154 3.08 4.31 4.93 5.16 8.40 10.26
3 -3 25 204 4.08 5.71 6.53 9.29 15.92 19.86
4 -4 14 294 5.88 8.23 9.41 8.80 13.95 16.87
5 -5 25 368 7.36 10.30 11.78 12.57 20.51 25.11
6 -6 50 468 9.36 13.10 14.98 19.78 33.52 41.64
6.8 -6.8 250 578 11.56 16.18 18.50 63.64 118.27 151.83

PAKAI TIANG PANCANG #25X25


L = 6 Sd 7 M
Pizin = 40 ton
Tizin = 10 ton