Some Brief Points on SCADA System

Kahramaa System Integration:

Its configuration must mirror the operational methodology employed by KAHRAMAA for
control of the water supply network.

The control Philosophy shall comply and fulfil all the requirements of NWCC control operation.

Scope of Work:

The scope of works include the supply, installation, configuration,


testing, and commissioning of all the required components and systems needed for the
implementation of the RTU at the RPS with full redundancy with high availability and reliability,
the scope includes but not limited to the following components for each station:

1. Redundant RTU for data communication with NWCC

2. Redundant Fiber SDH&PDH for data communication (4G Modems or Wimax may be
used with approval of KM if the fiber optic is not applicable)

3. All necessary cables between the supplied instruments/interpose panels and the RTU, and
all internal wiring in the supplied panel.

4. Fail safe philosophy shall be considered for the measurement and control signals.

Instrument Signals Connections and Wiring:

All enclosure wiring shall be in accordance with the requirements and recommendations of
the IEEE
Wiring Regulations 16th Edition.

Components:
All components shall be in accordance with the appropriate BS/IEC Standard or equivalent

240V AC Power Supplies:


1. Switching power supply functions over a wide range of voltages and frequencies
240 VAC +/- 15% and 50/60HZ +/- 3 Hz.
2.

3. It should be noted that the supply voltage is subject to harmonic distortion.


The equipment shall continue to operate correctly with a total harmonic content of up to
10% of supply voltage.

Graphical Displays:
Displays shall be updated in real time with both SCADA-generated and manually-entered
data without need for users to refresh the display.