You are on page 1of 3

Request For Information ( RFI )

JAWA-1 CCPP ( Samsung C&T )

TURBINE BUIDLING

No : 018-SD-08-2019
Date : August 21th 2019

1. Propose joint welding beam to post column


Additional backing plate (PL6x25) so that the results of full penetration welding
become perfect.

[22nd-Aug-2019] SCT response:


- Please pply connection detail of ‘steel work standard drawing’
2. Propose additional cover plate in beam
Additional cover plate (PL6) so that the painting results are perfect.

SG21
[22nd-Aug-2019] SCT response:
- Please apply typical connection detail of ‘steel work standard drawing’, instead of applying
additional cover plate.