1.4 Laying of Gravel bedding and Compaction on excavated areas 107.15 sqm. ₱370.00
for re‐concreting preparation
1.5 Laying of Rebars on compacted areas (12mm Def. Bars) 107.15 sqm. ₱340.00
2. Civil Works
2.1 Re‐concreting of chipped elevated sidewalk to road level
(150mm thk.)
2.1.a. Along BDO Area (BPO 1&2) 4.95 cum. ₱5,475.00
2.1.b. Along Hypermarket Area 5.56 cum. ₱5,475.00
2.1.c. Along The SM Store 5.56 cum. ₱5,475.00
2.2 Restoration of Manhole Cover, Concreting and Plastering (0.60
x 0.60)
2.2.a Along Hypermarket Area (must be leveled to Road) 0.36 sqm. ₱750.00
2.2.b Along The SM Store ( must be leveled to Road) 0.36 sqm. ₱750.00
1 Mobilization/Demobilization
1 Permits and Licenses
Building Permit
Occupancy Permit
Fire Certificate/Permit
1 Temporary Facilities & Temporary Fencing
1 Temporary Water and Power Consumption
1 Safety and Security/Warehouseman
2 Overhead and Supervision
2 Materials Testing and Commissioning
2 As‐Built Plan (Archi, Structural)
TOTAL
₱49,289.00
₱3,125.00
₱6,968.00
₱39,645.50
₱36,431.00
₱27,101.25
₱30,441.00
₱30,441.00
₱270.00
₱270.00
₱7,560.00
₱9,688.00
₱9,688.00
₱9,606.00
₱0.00
₱30,000.00
₱290,523.75
₱34,862.85
₱325,386.60