You are on page 1of 1

Action to be taken :

Concerned Section Action to be taken Solution Steps


RM Section/PM Spillage/ Weigh and note the quantity
Section/Manufacturing Breaking or any other all Kind of the spilled/ Breaked
Section/Production of wastages and Loss of /Lossed material as per SOP.
Section/Dispatch Section Material After approval from HOD and
Unit Head, same quantity is to
be deducted from the Stock
Inventory.

Start Preparing the incident


report with the cause of the
accident and appropriate
corrective action to avoid
recurrence of such incident.

We must need to maintain all


the record related to any kind
of wastages and losses in any
of the section.

Specially for RM Section: Standard Operating Procedure


for Sampling is need to be
Presently We are not Cross maintained.
Verifying Weight of All
barrels Weighing more than Physical Quantity/Count of
100 kg they also need to be material is same as in received
cross checked through Quantity.
Sampling Procedure before
acceptance to Store.

You might also like