A PEKERJAAN PONDASI
Pekerjaan Bowplank, Tanah & Pasangan Batu Kali
1 Pas.Bouwplank T.0,50M/m'
2 A1001 Galian Tanah Keras Dalam Max 2,00M/m3 47.25 m' 25,056.63 1,183,925.75
3 A1008 Pondasi Batu Kali 1:5/m3 49.28 m3 80,794.43 3,981,549.67
A1040 Pekerjaan Sloof 20/30 36.22 m3 750,418.06 27,180,141.97
4 Bekisting Sloof/m2 2xpakai dgn Papan 2/20
5 A1070 Pembesian Polos/kg 1.20 m2 55,256.83 66,308.20
6 A1053 Beton 1:2:3/m3,dgn Seplit 132.00 kg 17,810.83 2,351,030.00
A1025 1.20 m3 1,008,705.56 1,210,446.67
SUB TOTAL BIAYA PEKERJAAN PONDASI 35,973,402.26
B PEKERJAAN STRUKTUR
Kolom K1
1 Beton 1:2:3/m3,dgn Seplit
2 Pembesian Polos/kg
3 Bekisting Kolom/m2 2xpakai dgn Papan 2/20
B1005 Balok B1 m3
1.62 1,008,705.56 1,634,103.00
4 A1053 Beton 1:2:3/m3,dgn Seplit kg
178.20 17,810.83 3,173,890.50
5 B1015 Pembesian Polos/kg m2
0.65 117,607.08 76,209.39
6 Bekisting Balok/m2 2xpakai dgn Papan 2/20
B1005 Pelat Dak m3
0.80 1,008,705.56 806,964.44
7 A1053 Beton 1:2:3/m3,dgn Seplit kg
88.00 17,810.83 1,567,353.33
8 Pembesian Ulir/kg
B1018 0.32 m2 129,590.00 41,468.80
9 Bekisting Plat/m2 2xpakai dgn Triplex 12mm
B1005 3.16 m3 1,008,705.56 3,187,509.56
B1014 347.60 kg 17,810.83 6,191,045.67
B1023 1.26 m2 100,751.77 127,350.23
SUB TOTAL BIAYA PEKERJAAN STRUKTUR 16,805,894.92
Harga Satuan Jumlah Harga
No No ID Pekerjaan Volume Satuan Subtotal Total
Rp Rp