ACTUAL JOINT INSPECTION REPORT
(Stringging)
Name of Project 150 kV OHTL HASANG HEEP
:
:
:
:
:
Date of Inspection :
Phase/ Name of
Location TOWER No
Stringging checked :
Work Discription Remarks
Type of Satisfact Unsatisfacto
Diamet Lenght
A) Insulator insulat ory ry Comments
er (mm) (m)
or (tick relevan column)
[Link] all insulator
2. Total remain insulator
Total all
Remain
B) Material title Marking quantit
quantity
y
1. Single Suspension
String set
[Link] Suspension
String set
[Link] Tension String
set
[Link] Tension String
set
[Link] Tension inverse
Insulator String set
[Link] suspension
jumper Insulator String
set
[Link] rod Suspension
for ACSRHAWK 240/40
[Link] Damper for
ACSR HAWK ACSR 240/40
[Link] Joint For ACSR
240/40
[Link] rod
suspension for OPGW
[Link] Damper
OPGW 60mm
[Link] set for
OPGW 66mm
13 Tension Set for OPGW
66mm
[Link] Box OPGW
[Link] rod
suspension GSW 55mm
[Link] Damper
GSW
[Link] clampfor
GSW 55mm
[Link] Clamp for
GSW 55mm
[Link] Span Joint GSW
55mm
Checked By Witnessed By
Witnessed By
Name Name Name