FIRE BARRIER BACKER ROD FIRE BARRIER MATTRESS

FIRE BARRIER BLANKET FIRE BARRIER FILLERBOARD 1>>


GV2 / VEDA FRANCE - CS 63052 - 95972 Roissy CDG Cedex - France
Tél : + 33 (0)1 48 61 70 80 - Fax : + 33 (0)1 48 61 70 81 - Web : www.vedafrance.com - E-mail : contact@vedafrance.com
2

© All rights reserved - Non contractual drawings - 11/2014


COMPANY PROFILE
For more than 20 years, we have been engineering, manufacturing, and supplying reliable technical and
aesthetic profiles and solutions for all types of buildings. We market a complete range of unique and/or
patented building joints; structural movement joints, control joints, joint covers, fire barriers, waterstops,
stair nosings etc.

GV2 VEDA France is one of the leading manufacturer, specialized in providing engineering solutions for
building joints :

■■ Joint covers
• Aluminium and PVC clip affixed joint covers.
• Drilled and countersunk aluminium joint covers.
• Custom-made folded joint covers in galvanized or stainless steel, mill finished or anodized
aluminium.

■■ Smoke and fire barriers


• VEDAFEU C© backer rods for joint widths up to 200 mm.
• VEDAFEU M© mattresses for joint widths from 100 to 450 mm.
• VEDAFEU N© blankets for joint widths up to 840 mm.
• VEDAFEU FB© fillerboards for joint widths up to 60 mm.

■■ Structural movement joints


• Engineered movement joint systems either of all-metal type or with flexible rubber insert,
suitable for both horizontal and vertical, and standard or seismic joints.

Our products are supplied in numerous countries in Europe, Middle East, Africa, and Asia.

Through regional distributors, products of VEDA France are used in various government and private
projects, such as schools, hospitals, malls, industrial and military buildings, airports and rail terminals,
leisure centres, car parks, etc.

GV2 VEDA France’s continuous Research & Development in new systems is able to meet ever-challenging
building requirements.

To find out more about our range, please visit our website at www.vedafrance.com.

The GV2 VEDA France range meets the most stringent European and global performance standards
through strict quality checks conducted at factory and by world-class independent laboratories.
4
VEDA FRANCE RANGE

j Clip affixed joints covers j Floor joints covers j Compression profiles

j Vertical expansion joints j Mechanical floor joints j Carpark expansion joints

j Embedded all metal


expansion joints j
Surface mounted all metal
expansion joints j Heavy duty
expansion joints

Wide movement Special resilient flooring


j expansion jointS j expansion jointS j Control jointS

j Roof expansion joints j Stair nosing j Waterstops

© All rights reserved - Non contractual drawings - 11/2014


INDEX
06 WHAT IS AN
EXPANSION JOINT ?

EXPANSION JOINTS AND


FIRE BARRIERS LOCATION 07
08 VEDAFEU RANGE

VEDAFEU STRENGTHS 09
10 EUROPEAN REGULATIONS

HOW TO READ A
CLASSIFICATION REPORT ?
11
15 INTERNATIONAL
APPROVALS

FRANCE AND
WORLD SEISMICITY 16
18 NAPPES VEDAFEU
VEDAFEU N ROD
C© BACKER

VEDAFEU M© MATTRESS 22
24 VEDAFEU N© BLANKET

VEDAFEU FB© FILLERBOARD 26


6
WHAT IS AN EXPANSION JOINT ?
An expansion joint is an empty space, free of any material
between two parts of a structure designed to safely absorb
thermal expansion and contraction of building structures,
to absorb vibration or to allow horizontal, vertical or shear
movement due to soil settlement or seismic activity.

CAUSES OF MOVEMENTS

Concrete shrinkage Expansion and contraction Settlement


of the structure of the structure

Movements generated
by the environment
© All rights reserved - Non contractual drawings - 11/2014
Earthquakes
EXPANSION JOINTS AND
FIRE BARRIERS LOCATION

1
3
2

7
6

‘‘
1 – Joint de passerelle
u - Linking bridge
2 – Joint entre plancher et mur rideau
v - Curtain wall
3 – Joint de façade extérieure
wtoiture
4 – Joint de - Facade
5 – Joint étanche circulable
x - Roof
6 – Joint en tête de maçonnerie
y - Driveway
7 – Joint pour charges lourdes
z - Head of wall
 - Loading bay

‘‘
A solution to each configuration.
8
VEDAFEU RANGE

VEDAFEU C© fire barrier backer rod VEDAFEU M© fire barrier mattress

VEDAFEU N© fire barrier blanket VEDAFEU FB© fire barrier fillerboard

12 200 240
RESULTS
©
VEDAFEU C Backer rod
10 Joint width (mm)
100 300 450 Movement (mm)
©
VEDAFEU M Mattress
50
560 840
©
VEDAFEU N Blanket

0 10 50 100 150 200 240 300 450 560 840


joint width (mm)

RECOMMENDATIONS
©
VEDAFEU C
Backer rod VEDAFEU M© Mattress VEDAFEU N© Blanket

0 10 50 120 200 240 300 450 560 840 Joint width (mm)

VEDAFEU FB© fillerboard is not in this graph as it is used as formwork.

© All rights reserved - Non contractual drawings - 11/2014


VEDAFEU STRENGTHS
FOR GAPS FROM 10 TO 840 MM

FIRE BARRIER up to 240 MN (EI 240)

EXPANSION MOVEMENT up to + 50%

COMPRESSIBILITY up to 80%

NOT EXPOSED or EXPOSED to FIRE

HORIZONTAL or VERTICAL POSITION

WITHOUT or WITH JUNCTION

ALL KINDS of BUILDINGS

SAFE FOR THE HEALTH


EASY TO INSTALL AND FOR THE ENVIRONMENT
10
EUROPEAN REGULATIONS
Definitions

Reaction to fire Resistance to fire


Product’s tendency to produce smoke, Duration for which a fire protection
flames or burning droplets. It is defined by system helps to limit fire spread.
the Euroclass sytem classification

European Classification Standard EN 13501-2 (May 2004)

Fire resistance classification for special building components and systems. This standard details the test
procedures : position of the samples, movement capacity, junction types, joint width, etc.

European Test Method Standard EN 1366-4 (Novembre 2006) + A1 extension (June 2010)

Fire resistance testing of construction systems, part 4 : Expansion joint fillers. This standard details a test
method for fire-resistant joint filler according to their final use, with or without movement during the
tests. This standard was approved by the CEN (European Committee for Standardization) in April 2006.

In France, CSTB & Efectis are the only 2 official approved laboratories to deliver

‘‘ classification reports for expansion joint fillers.

Efectis is also a recognized laboratory in the Middle-East.

‘‘
Complying with the latest standards is
making sure everyone stays safe.

© All rights reserved - Non contractual drawings - 11/2014


HOW TO READ A CLASSIFICATION REPORT ?

BEFORE November 2006

RT
n Before the decree of the 22nd of March 2004, products such as fire
barrier backer rods, mattresses, blankets or strips could be certified by

PO
fire resistance test reports delivered by independent laboratories.

IE RE
TIT N
n A test report was delivered with no expiry date.

S
AN TIO
This document is no longer valid.

QU FICA
n Tests were not based on any test nor classification standard.

I
AN SS
n None of the following elements were considered : thermal insulation,

ES CLA
D
orientation, movement, junction and exposition to fire.
NC E
RE NC

AFTER
FE RA

November 2006
RE A F
ED ED

A classification report
1 is the only recognized and approved document.
RN IS V
CE TH

If the test has been conducted


2
ON E,

after November 2006, the


, C US

classification report is valid.


ME MIS
NA NT

A classification report is valid for 5 years


3
JO EVE

from the test date.


AR PR
B

Standard EN 13501-2
4
BE TO

Standard EN 1366-4
ST D
MU AN
LID
VA
BE
O
12
HOW TO READ A CLASSIFICATION REPORT ? (CONTINUED)
Fire resistance according to standard EN 13501-2.
5 EI : E = Smoke and fire barrier. I = thermal insulation. EI expressed in minutes.
H or V : H = horizontal construction support. V = vertical construction support.
M or X : M = movement. X = no movement. M and X expressed in percentage.
B or F : junction type. B = factory and on-site manufactured. F = on-site manufactured.
W = tested joint width. Expressed in millimeters.

Fireproofing Horizontal Movement Initial approved


& Thermal
insulation support of joint
in minutes H +50 % 560 mm

EI 240 - H - M50 - B - W 560


EI 240 - V - M20 - B - W 20 to 120 mm

Vertical Movement VALID for width


240 Junction
support of from
minutes type
V +20 % 20 to 120 mm

Understanding a classification
EXAMPLE Tested
Failed after WITHOUT MOVEMENT

8
60 minutes Refer to
ONLY

E 60 - H - X - F - W 60

NO «I» HORIZONTAL VALID for a


(THERMAL INSULATION) NO JUNCTION gap of 60 mm
SUPPORT ONLY
Refer to Refer to Refer to ONLY.
Not valid for
6 7 9 a range

© All rights reserved - Non contractual drawings - 11/2014


HOW TO READ A CLASSIFICATION REPORT ? (CONTINUED)
E or EI classification
6 An E classification
does not validate
+ an EI classification.
Joint fillers
must have an

+ = EI
E = Smoke, gas and I = thermal EI classification.
fire barrier insulation

Position : horizontal or vertical


7 A test carried out in
horizontal position
does not
validate a
vertical configuration.
Horizontal position Vertical position

Without movement or with movement


8 A test carried out
without
movement does not
validate a
configuration
Without movement With movement with movement.

Without junction or with junction


9 A test carried out
without
junction does not
validate a
configuration with
junction.
Without junction With junction

Exposure to fire
10 Fire barrier not
exposed to fire
Fire barrier
exposed to fire
A test carried out from
the non exposed
side to fire
does not validate
a configuration
exposed to fire.
14
SUMMARY OF POINTS TO CHECK
i f i c at i o n re port q 3
Class
1
1 Test date q
3
2
2 Validity q
3
3 s t a ndard s
ce w i t h
3 In accordan q3
4 EN 13501-2
an d 1366-4

45 Classification q
3

s i f i c at i on q
3
56 E or EI c l a s

Position :
67 horizontal o
r vertic al q
3

u t m o v e m e nt
Witho
7
8 or wit h m o v e m e ntq 3

i t h o u t j u n ction
W
8
9 or wit h j u n c t i o n q3

s u r e to f i re q
3
Expo
190
© All rights reserved - Non contractual drawings - 11/2014
INTERNATIONAL APPROVALS

BS 476
Part 20

ore) Bomba (M
(Singap TÜV (Singapore) alaysia)
Setsco

itters
Underwrries (UK)
Laborato Tecnalia
(Spain)
16
FRANCE AND WORLD SEISMICITY

FRANCE SEISMICITY
An earthquake is the result of a sudden
release of energy in the Earth’s crust that
creates seismic waves. Though we
cannot prevent an earthquake from occuring,
measures can be taken to minimize
consequences. In order to reduce the number
of victims, buildings and other structures
must be designed or modified to improve
their resistance to earthquakes.

Eurocodes : new european regulation

Eurocodes is a set of european standards


about the specifications of structural design
for the construction of buildings and other
infrastructures.
They are developped by the European Com-
mittee for Standardization. Chapter 8 defines
the design and specifications of structures for

‘‘ earthquake resistance.

‘‘
Earthquakes may create major building
disasters, with Veda France,
precaution can be taken.

© All rights reserved - Non contractual drawings - 11/2014


WORLD SEISMICITY

accélération maximale du sol (m/s2)

0,2 0,4 0,8 1.6 2.4 4

ALÉA* SISMIQUE DANS LE MONDE


* Probabilité qu’un phénomène naturel se produise dans un temps et une zone donnés FAIBLE MODÉRÉÉ FORTE TRÈS FORTE


Design
to avoid

‘‘
Design
to consider

‘‘
We have developped and patented fire barrier
systems to fill joints up to 840 mm.
18 ‘‘ ©
VEDAFEU C BACKER ROD

‘‘
The most extensive range
in expansion joints
fire barriers.
FIRE STOP 4Hrs MOVEMENT JOINT WIDTH
EI 240 + 20 % 10 to 200 mm
TESTed d VEDAFEU C© BACKER ROD STRENGTHS
certifie

POSITIONS
Tested and certified for
horizontal and vertical applications. Horizontal position

Vertical position

EXPOSURE
Tested and certified
not exposed or exposed to fire.
Not exposed to fire Exposed to fire

COMPRESSIBILITY
Tested and certified up to - 80% compression.
Initial joint With compression

EXPANSION MOVEMENT
Tested and certified up to + 20% expansion.
Initial joint With movement

APPLICATIONS
Hospitals, industrial buildings, offices, housing, hotels,
malls, carparks, schools, train stations, airports, stadiums...

© All rights reserved - Non contractual drawings - 11/2014


OFFICIAL CLASSIFICATION
PV n° RS 08-162/A dated 15/12/2010
EI 240 – H – M20 – B – W 10 to 200

PV n° 11-A-441 dated 25/07/2011


EI 240 – V – M20 – B – W 20 to 120
Backer rod diameter according to initial joint width
with movement (M) + 20% according to mentioned above report.
Initial joint width
10 20 40 60 80 100 120
[mm]

ø backer rod 12 30 60 90 120 150 180


VEDAFEU C© [mm]
©
VEDAFEU C has also been tested and approved with movement of +7,5%.
Others classification reports available upon request : with sealant, with joint cover, exposed to fire, with waterproofing
membrane, etc.

CERTIFIED CONFIGURATIONS
D D
CERTIFIE CERTIFIE

NO WITH
sealant joint
NO cover
joint NO
cover sealant

D D
CERTIFIE CERTIFIE

WITH WITH
waterproofing
sealant
NO membrane
joint NO
cover joint cover
20
©
VEDAFEU C PROPERTIES
VEDAFEU C© fire barrier backer rod COMPRESSIBILITY tests
Load F (kN) and Immediate After 2 hours After 72 hours
Ref. Test VEDAFEU C© Compressibility form form form
thickness Øc (mm) recovery recovery recovery
F = 4 kN
1 69 % 83 % 88 % 90 %
Øc = 16 mm
VEDAFEU C© F = 50 kN
2 83% 78 % 84 % 86 %
Ø 60 Øc = 8 mm
F = 5 kN
3 70% 76 % 87 % 91 %
Øc = 16 mm
AVERAGE 74% 79 % 86 % 89 %
F = 30 kN
1 81% 55 % 69 % 74 %
Øc = 16 mm
VEDAFEU C© F = 30 kN
2 80% 62 % 69 % 71 %
Ø 100 Øc = 17 mm
F = 30 kN
3 85 % 57 % 62 % 63 %
Øc = 14 mm
AVERAGE 82 % 58 % 67 % 69 %
F = 100 kN
1 86 % 54 % 55 % 72 %
Øc = 19 mm
VEDAFEU C© F = 100 kN
2 88 % 56 % 57 % 67 %
Ø 150 Øc = 17 mm
F = 100 kN
3 88 % 68 % 71 % 81 %
Øc = 17 mm
AVERAGE 87 % 59 % 61 % 73 %

VEDAFEU C© THERMAL Properties


In accordance with the Thermal Regulation RT 2012

Thermal conductivity at Tm 50 100 200 300 400 500 °C DIN


average temperature - 0.041 0.049 0.073 0.096 0.136 0.144 W/mK 52612

The thermal value of Lambda VEDAFEU C© fire barrier backer rod is about 0.035 W/mK at 10°C and 0.040 W/mK at 50°C.
The thermal resistance R (m² K/W) is calculated by the ratio of the thickness of insulation on Lambda.

VEDAFEU C© ACOUSTICAL Properties


In accordance with the NRA (New Acoustical Regulation 2012)
Acousting absorption (αs) 125 250 500 1000 2000 4000
Internal
according to frequencies (Hz) for a
0.10 0.16 0.38 0.51 0.59 0.61 measurements
diameter from 30 to 180 mm

© All rights reserved - Non contractual drawings - 11/2014


©
VEDAFEU C BACKER ROD
Installation instructions for
joint width from 10 to 120 mm
If necessary, remove formwork material such as polystyrene, honeycomb cardboard, etc.
The contact surfaces must be clean, dry and free from contamination. Remove dust, using a brush or a broom.

*
Apply a layer of VEDACOLLE C While the adhesive is still wet, Linking of 2 lengths ©
VEDAFEU C with junction.
with a brush on both sides of the insert VEDAFEU C © and firmly (patented).
joint. press it by hand till perfect fit.
For installation accessories, please refer to the concerned classification report.

EXAMPLES OF APPLICATION
j Expansion
joint ku Head of wall u

Application on floor, wall, ceiling with junctions. A single backer rod Application in carpark. Double backer rod
on head of wall. on head of wall.

l Curtain wall
m Others
applications

Windows and doors frames,


bearings protection,
through-penetrations, ...
Application on curtain wall.
22 ‘‘
VEDAFEU M© MATTRESS 100%
PATENTED

‘‘
NEW
Solutions for standard
or seismic joints.

fire stop 2Hrs MOVEMENT JOINT WIDTH


EI 120 SEISMIC + 50% 100 to 450 mm

TESTed d
certifie VEDAFEU M© MATTRESS STRENGTHS
POSITIONS
Tested and certified for
horizontal and vertical applications. Horizontal position Vertical position

COMPRESSIBILITY
Tested and certified up to - 95%.
Initial joint With compression

EXPANSION MOVEMENT
Tested and certified up to + 50%.
Initial joint With movement

EASY to handle and to install.

SAFE HANDLING for the health and the environment.

APPLICATIONS
Hospitals, industrial buildings, offices, housing, hotels,
malls, carparks, schools, train stations, airports, stadiums...

© All rights reserved - Non contractual drawings - 11/2014


OFFICIAL CLASSIFICATION
PV n° RS 12-124 dated 07/01/2013
EI 120 – H – M40 – B – W 100 to 300

PV n° 13-A-980 dated 14/01/2014


EI 120 – V – M50 – B – W 100 to 300

Installation instructions for


joint width from 100 to 300 mm
If necessary, remove formwork material such as polystyrene, honeycomb cardboard, etc.
The contact surfaces must be clean, dry and free from contamination. Remove dust, using a brush or a broom.

Apply the glue on both sides of the joint Apply the glue on the underside of the wings Press the mattress into the joint.
and on a width of 5 cm on the upper side and on the vertical side of the mattress
of the concrete slab. on a width of 6 cm.

Fix the wings of the mattress to the slab Mattress installed. Application on floor, wall and
every 20 cm using a pneumatic nailer. ceiling with junctions.

For installation accessories, please refer to the concerned classification report.


24 ‘‘ ©
VEDAFEU N BLANKET
100%
PATENTED

‘‘
Veda France, always
ahead in terms of fire
protection.

fire stop up to MOVEMENT JOINT WIDTH


4Hrs EI 240 SEISMIC + 50% 150 to 840 mm

TESTed d
certifie VEDAFEU N© BLANKET STRENGTHS
COMPRESSIBILITY
Tested and certified up to - 75% compression.
Initial joint With compression

EXPANSION MOVEMENT
Tested and certified up to + 50% expansion.
Initial joint With movement

EASY to handle and to install.

SAFE HANDLING for the health and the environment.

APPLICATIONS
Hospitals, industrial buildings, offices, housing, hotels,
malls, carparks, schools, train stations, airports, stadiums...

© All rights reserved - Non contractual drawings - 11/2014


OFFICIAL CLASSIFICATION
Initial Maximum
Ref. Official classification Joint cover
gap [mm] gap [mm]
N 150 EI 120 150 225 EI 120 - H - M50 - B - W 150 yes
N 150 EI 180 150 225 EI 180 - H - M50 - B - W 150 yes
N 150 EI 240 150 225 EI 240 - V - M50 - B - W 150 yes
N 200 EI 180 200 300 EI 180 - H - M50 - B - W 200 yes
N 400 EI 60 400 600 EI 60 - H - M50 - B - W 400 optional
N 400 EI 120 400 600 EI 120 - H - M50 - B - W 400 yes
N 560 EI 240 560 840 EI 240 - H - M50 - B - W 560 yes

©
VEDAFEU N BLANKET
Installation instructions for
joint width from 100 to 560 mm
If necessary, remove formwork material such as polystyrene, honeycomb cardboard, etc.
The contact surfaces must be clean, dry and free from contamination. Remove dust, using a brush or a broom.

Make sure that the joint edges Flatten the blanket against the ©
Keep the pressure on the flange VEDAFEU N blanket in place.
are straight and clean concrete with the flange. before fixing with pneumatic
to get a good contact nailer.
between the blanket and
its supports.

Joint cover affixed with Detail. Application on floor, wall


Section.
VEDAFLEX SIL sealant or screws
and ceiling with junctions.
and plugs.
For installation accessories, please refer to the concerned classification report.
26 ‘‘ ©
VEDAFEU FB FILLERBOARD
2-IN-1 PRODUCT, it materializes

‘‘
the expansion joint while
pouring the concrete and is 100%
PATENTED
4-hour fire rated.

4-Hr fire stop MOVEMENT JOINT WIDTH


EI 240 UP TO + 20 % 20 to 60 mm
TESTed d
CERTIFIe VEDAFEU FB© FILLERBOARD STRENGTHS
EXPOSURE
Tested and certified
not exposed or exposed to fire.
Not exposed to fire Exposed to fire

COMPRESSIBILITY
Tested and certified up to - 60%.
initial joint With compression

EXPANSION MOVEMENT
Tested and certified up to + 20%.
initial joint With movement

EASY to handle and to install. It is a substitute to materials


(honeycomb cardboard, polystyrene ...) used to realize
the expansion joint while pouring the concrete.

APPLICATIONS
Hospitals, industrial buildings, offices, housing, hotels,
malls, carparks, schools, train stations, airports, stadiums...

© All rights reserved - Non contractual drawings - 11/2014


OFFICIAL CLASSIFICATION
PV n° 12-F-148 du 01/03/2012 PV n° 12-F-148 du 01/03/2012
EI 240 – H – M20 – B – W 20 à 40 EI 240 – H – M15 – B – W 20 à 60

PV n° 13-F-131441 du 16/04/2014 PV n° 13-F-131441 du 16/04/2014


EI 240 – V – M20 – B – W 20 EI 240 – V – M7,5 – B – W 20 à 60

‘‘
VEDAFEU FB© can be installed as

‘‘
fire stop fillers with a height from
140 mm ONLY. Protection with joint cover
or sealant is possible.
28
VEDAFEU FB© PROPERTIES
VEDAFEU FB© fillerboard COMPRESSIBILITY tests
Load F (kN) and Immediate After 2 hours
Ref. Test VEDAFEU FB© Compressibility form form
thickness Ec to F (mm) recovery recovery
1 F = 7.4 kN - Ec = 7 mm 64 % 88 % 96 %
2 F = 5.7 kN - Ec = 7 mm 67 % 82 % 91 %
VEDAFEU FB©
20 3 F = 8,4 kN - Ec = 6 mm 70 % 81 % 93 %
4 F = 9,0 kN - Ec = 8 mm 63 % 85 % 98 %
5 F = 8,8 kN - Ec = 7 mm 65 % 81 % 95 %
AVERAGE 66% 83 % 95 %
1 F = 11,1 kN - Ec = 17 mm 58 % 91 % 94 %
2 F = 11.4 kN - Ec = 18 mm 55 % 93 % 97 %
VEDAFEU FB©
3 F = 12.9 kN - Ec = 19 mm 54 % 92 % 95 %
40
4 F = 11,1 kN - Ec = 15 mm 60 % 92 % 98 %
5 F = 11,3 kN - Ec = 18 mm 55 % 91 % 94 %
AVERAGE 56 % 92 % 96 %
1 F = 8,0 kN - Ec = 25 mm 59 % 93 % 96 %
2 F = 6,7 kN - Ec = 22 mm 63 % 89 % 97 %
VEDAFEU FB©
3 F = 9,2 kN - Ec = 27 mm 55 % 93 % 97 %
60
4 F = 7.3 kN - Ec = 23 mm 62 % 89 % 98 %
5 F = 6,1 kN - Ec = 19 mm 68 % 88 % 97 %
AVERAGE 62 % 90 % 97 %

VEDAFEU FB© THERMAL Properties


In accordance with the Thermal Regulation RT 2012
Thickness 20 40 60 100 140 200 mm
Internal
Thermal resistance Thermal
0.4 0.9 1.4 2.3 3.2 4.6 m2.K/W measurements
resistance
The thermal resistance R (m² K/W) is calculated by the ratio of the thickness of insulation on Lambda.

VEDAFEU FB© ACOUSTICAL Properties


In accordance with the NRA (New Acoustical Regulation 2012)
Acousting absorption (αs) 125 250 500 1000 2000 4000
Internal
according to frequencies (Hz) for
0.10 0.16 0.38 0.51 0.59 0.61 measurements
a thickness from 20 to 60 mm

© All rights reserved - Non contractual drawings - 11/2014


©
VEDAFEU FB FILLERBOARD
Installation instructions for
joint width from 20 to 60 mm

v v

Side
A u
eA
Sid u

1. Attach the anchoring springs to the upper 2. Install the VEDAFEU FB© fillerboard 3. Concrete slab sideupoured.
part of the VEDAFEU FB© fillerboard on along the wooden formwork.
Side A according to the fig. 1.

100%
u PATENTED
Side B

v
v
4. Attach the anchoring springs to the lower 5. Concrete slab sidevpoured.
part of the VEDAFEU FB© fillerboards on
Side B according to the fig. 2.

75

Fig. 1
300

‘‘300

Side
FaceA
A

1200
300 205

30
20

205
Fig. 2
300
1200

Side B
Face B

300 300 75
30

20

‘‘
Junction system patented.
No risk of gas or fire leak.
30
Notes

© All rights reserved - Non contractual drawings - 11/2014


VEDA FRANCE
A specification tool

u r w e b s i t e
Vi s i t o e . c o m
v e d a f r a n c
www.

ISO 9001:2008 GV2 / VEDA FRANCE - CS 63052 - 95972 Roissy CDG Cedex - France
BUREAU VERITAS Tél : + 33 (0)1 48 61 70 80 - Fax : + 33 (0)1 48 61 70 81
Certification
Web : www.vedafrance.com - E-mail : contact@vedafrance.com
32

© All rights reserved - Non contractual drawings - 11/2014

GV2 / VEDA FRANCE - CS 63052 - 95972 Roissy CDG Cedex - France


Tél : + 33 (0)1 48 61 70 80 - Fax : + 33 (0)1 48 61 70 81 - Web : www.vedafrance.com - E-mail : contact@vedafrance.com

You might also like