Determining sources of data 3) Data collection methods Determining the sample design and sample size
Organizing and conducting field survey
Processing and analyzing the collected data
8) Preparing the research report:
In our group, we are teaching Design and Technology for year 4 where we have to design Action aplan free moving car which can carry a stuffed animal using recycled material.
Our action plan in the development of our
group curriculum resources, scheme of work, activities and assessment procedures, we firstly decide to look at the different design of the model, which is possible for the student to do. Then they do research about the material they are going to use. After they have decide the materials, they discuss with their partner on how to design the car. Student now can identify the different parts of the materials, then choose the specific/suitable materials to be use for their model. When they have