REPORT FOR STEM PIPE REPAIR WORKS AT JAIGIRI TANK ZONE 5,AT

CHAINAGE 10.756 KM- PHASE - 1


***
J.Chokka Rao Devadula Lift Irrigation Scheme is taken up to lift 38.16 TMC of
water from river Godavari near Gangaram (V), Kannaigudem(M), Jayashankar Bhupalapally
( Dist) in phased manner viz., Phase-I, Phase-II and Phase-III for providing irrigation facilities
to the upland drought prone areas of Jayashankar Bhupalpally, Karimnagar, Warangal (Urban),
Warangal (Rural), Jangaon, Yadadri, Suryapet & Siddipet of Telangana Region to an extent of
6.21 Lakh Acres including Drinking water facilities. Subsequently, the Government of
Telangana have enhanced the present allocation of 38.16 TMC to 60TMC of water vide
G.O.Rt.No.25, Dt: 21.01.2015.
The work of Operation and maintenance of Phase-I of JCR-DLI Scheme to Lift 10 Cumecs
of water from river Godavari near Gangaram (V), Eturnagaram (M) Warangal District with existing
Pipeline from Intake to R.S.Ghanpur via Bheemghanpur, Pulkurthy and Dharmasagar in four
stages for period from July-2017 to June 2019 (24 months was awarded under Non-EPC system to
M/s. Power Solution, Hyderabad for an amount of Rs. 7,72,30,862/- at (-) 1.18 less than ECV of
Rs. 7,81,53,068/-.

On 31.05.2018 while site verification it was observed that the following one nos. stem
pipes of air valves are damaged and leakages are detected at below locations in Zone 5.
1) Zone 5 -- Stem pipe of air valve failure at Chainage 10.756 Km Jaigiri Tank ( Photo graph
for damaged stem pipe attached ). Frequently,the stem pipe 6mm thickness and 200 mm dia
pipe are being damaged in pumping season. Hence it is necessitated to increase the thickness
from 6mm to 10 mm , 200 mm dia pipe with external lining of tarcoal and internal with epoxy
coating .
In this regard the existing O & M contractor of JCR DLIS, Phase – I Operation &Maintenance
is hereby instructed to take up the rectification work immediately.

The O&M agency has started the work as per instruction and completed the rectification of 1no.
stem pipe of air valve on 27.06.2018 at the chainage 10.756 Km near Jigiri Tank in Zone 5 by
replacing 6mm thick pipe with 10 mm thick 200mm dia pipe with external lining of tarcoal and
internal Epoxy coating. ( Photo graph after repair stem pipe attached )

Hence, this report is submitted for favour of information and obtaining the early approval
from the competent authority.
REPORT FOR STEM PIPE REPAIR WORKS NEAR UNIKICHERLA AT ZONE E 5,
AT CHAINAGE 13.653KM PHASE - 1
***
J.Chokka Rao Devadula Lift Irrigation Scheme is taken up to lift 38.16 TMC of
water from river Godavari near Gangaram (V), Kannaigudem(M), Jayashankar Bhupalapally
( Dist) in phased manner viz., Phase-I, Phase-II and Phase-III for providing irrigation facilities
to the upland drought prone areas of Jayashankar Bhupalpally, Karimnagar, Warangal (Urban),
Warangal (Rural), Jangaon, Yadadri, Suryapet & Siddipet of Telangana Region to an extent of
6.21 Lakh Acres including Drinking water facilities. Subsequently, the Government of
Telangana have enhanced the present allocation of 38.16 TMC to 60TMC of water vide
G.O.Rt.No.25, Dt: 21.01.2015.
The work of Operation and maintenance of Phase-I of JCR-DLI Scheme to Lift 10 Cumecs
of water from river Godavari near Gangaram (V), Eturnagaram (M) Warangal District with existing
Pipeline from Intake to R.S.Ghanpur via Bheemghanpur, Pulkurthy and Dharmasagar in four
stages for period from July-2017 to June 2019 (24 months was awarded under Non-EPC system to
M/s. Power Solution, Hyderabad for an amount of Rs. 7,72,30,862/- at (-) 1.18 less than ECV of
Rs. 7,81,53,068/-.

On 31.05.2018 while site verification it was observed that the following two nos. stem
pipes of air valves are damaged and leakages are detected at below locations in Zone 5.
1) Zone 5 -- Stem pipe of air valve failure at Chainage 13.653 Km near Unikicherla ( V )
(Photo graph for damaged stem pipe attached ). Frequently,the stem pipe 6mm thickness
and 200 mm dia pipe are being damaged in pumping season. Hence it is necessitated to increase
the thickness from 6mm to 10 mm , 200 mm dia pipe with external lining of tarcoal and internal
with epoxy coating .
In this regard the existing O & M contractor of JCR DLIS, Phase – I Operation &Maintenance
is hereby instructed to take up the rectification work immediately.

The O&M agency has started the work as per instruction and completed the rectification of 1no.
stem pipe of air valve on 26.06.2018 at the chainage 13.653 Km near Unikicherla in Zone 5 by
replacing 6mm thick pipe with 10 mm thick 200mm dia pipe with external lining of tarcoal and
internal Epoxy coating. ( Photo graph after repair stem pipe attached )

Hence, this report is submitted for favour of information and obtaining the early approval
from the competent authority.
REPORT FOR 1 NO.STEM PIPE REPAIR WORK NEAR GOLABUDDARA ZONE 2,
AT CHAINAGE 3.250KM- PHASE - 1
***
J.Chokka Rao Devadula Lift Irrigation Scheme is taken up to lift 38.16 TMC of
water from river Godavari near Gangaram (V), Kannaigudem(M), Jayashankar Bhupalapally
( Dist) in phased manner viz., Phase-I, Phase-II and Phase-III for providing irrigation facilities
to the upland drought prone areas of Jayashankar Bhupalpally, Karimnagar, Warangal (Urban),
Warangal (Rural), Jangaon, Yadadri, Suryapet & Siddipet of Telangana Region to an extent of
6.21 Lakh Acres including Drinking water facilities. Subsequently, the Government of
Telangana have enhanced the present allocation of 38.16 TMC to 60TMC of water vide
G.O.Rt.No.25, Dt: 21.01.2015.
The work of Operation and maintenance of Phase-I of JCR-DLI Scheme to Lift 10 Cumecs
of water from river Godavari near Gangaram (V), Eturnagaram (M) Warangal District with existing
Pipeline from Intake to R.S.Ghanpur via Bheemghanpur, Pulkurthy and Dharmasagar in four
stages for period from July-2017 to June 2019 (24 months was awarded under Non-EPC system to
M/s. Power Solution, Hyderabad for an amount of Rs. 7,72,30,862/- at (-) 1.18 less than ECV of
Rs. 7,81,53,068/-.

On 03.06.2018 while site verification it was observed that the following two nos. stem
pipes of air valves are damaged and leakages are detected at below locations in Zone 2.
( 1 ) Zone 2 – 1 no. Stem pipe of air valve failure at Chainage 3.0 Km near Golabuddaram( V )
( Photo graph for damaged stem pipe attached ).Frequently,the stem pipe 6mm thickness
and 200 mm dia pipe are being damaged in pumping season.To improve the life of stem pipes for
smooth pumping it is necessitated to increase the thickness from 6mm to 10 mm , 200 mm dia
pipe ,3 mtr length with external lining of tar coal and internal with epoxy coating .

In this regard the existing O & M contractor of JCR DLIS, Phase – I Operation &Maintenance
is hereby instructed to take up the rectification work immediately.

The O&M agency has started the work as per instruction and completed the rectification of 1no.
stem pipe of air valve on 20.06.2018 at the chainage 3.0 Km near Golabuddaram( V ) in Zone 2
by replacing 6mm thick pipe with 10 mm thick 200mm dia pipe with external lining of tarcoal and
internal Epoxy coating.
Hence, this report is submitted for favour of information and obtaining the early approval
from the competent authority.
REPORT FOR 1 NO.STEM PIPE REPAIR WORKS RAMK RISHANAPUR ( V ) ZONE 2,
AT CHAINAGE 15.4 KM - PHASE - 1
***
J.Chokka Rao Devadula Lift Irrigation Scheme is taken up to lift 38.16 TMC of
water from river Godavari near Gangaram (V), Kannaigudem(M), Jayashankar Bhupalapally
( Dist) in phased manner viz., Phase-I, Phase-II and Phase-III for providing irrigation facilities
to the upland drought prone areas of Jayashankar Bhupalpally, Karimnagar, Warangal (Urban),
Warangal (Rural), Jangaon, Yadadri, Suryapet & Siddipet of Telangana Region to an extent of
6.21 Lakh Acres including Drinking water facilities. Subsequently, the Government of
Telangana have enhanced the present allocation of 38.16 TMC to 60TMC of water vide
G.O.Rt.No.25, Dt: 21.01.2015.
The work of Operation and maintenance of Phase-I of JCR-DLI Scheme to Lift 10 Cumecs
of water from river Godavari near Gangaram (V), Eturnagaram (M) Warangal District with existing
Pipeline from Intake to R.S.Ghanpur via Bheemghanpur, Pulkurthy and Dharmasagar in four
stages for period from July-2017 to June 2019 (24 months was awarded under Non-EPC system to
M/s. Power Solution, Hyderabad for an amount of Rs. 7,72,30,862/- at (-) 1.18 less than ECV of
Rs. 7,81,53,068/-.

On 13.8.2017 while site verification it was observed that the following one no. stem
pipes of air valves are damaged and leakages are detected at below locations in Zone 2.

( 1 ) Zone 2 – 1 no. Stem pipe of air valve failure at Chainage 15.4 Km near Ramkrishanapur( V )
( Photo graph for damaged stem pipe attached ).Frequently,the stem pipe 6mm thickness
and 200 mm dia pipe are being damaged in pumping season.To improve the life of stem pipes for
smooth pumping it is necessitated to increase the thickness from 6mm to 10 mm , 200 mm dia
pipe, 3 mtr length with external lining of tarcoal and internal with epoxy coating .

In this regard the existing O & M contractor of JCR DLIS, Phase – I Operation &Maintenance
is hereby instructed to take up the rectification work immediately

The O&M agency has started the work as per instruction and completed the rectification of 1no.
stem pipe of air valve on 16.8.2017 at the chain age 15.4 KM near Ramkrishanapur in Zone 2 by
replacing 6mm thick pipe with 10 mm thick 200mm dia pipe with external lining of tarcoal and
internal Epoxy coating.
Hence, this report is submitted for favour of information and obtaining the early approval
from the competent authority.
REPORT FOR 1 NO.STEM PIPE REPAIR WORKS NALLAKUNTA ( V ) ZONE 2,
AT CHAINAGE 19.0KM - PHASE - 1

***
J.Chokka Rao Devadula Lift Irrigation Scheme is taken up to lift 38.16 TMC of
water from river Godavari near Gangaram (V), Kannaigudem(M), Jayashankar Bhupalapally
( Dist) in phased manner viz., Phase-I, Phase-II and Phase-III for providing irrigation facilities
to the upland drought prone areas of Jayashankar Bhupalpally, Karimnagar, Warangal (Urban),
Warangal (Rural), Jangaon, Yadadri, Suryapet & Siddipet of Telangana Region to an extent of
6.21 Lakh Acres including Drinking water facilities. Subsequently, the Government of
Telangana have enhanced the present allocation of 38.16 TMC to 60TMC of water vide
G.O.Rt.No.25, Dt: 21.01.2015.
The work of Operation and maintenance of Phase-I of JCR-DLI Scheme to Lift 10 Cumecs
of water from river Godavari near Gangaram (V), Eturnagaram (M) Warangal District with existing
Pipeline from Intake to R.S.Ghanpur via Bheemghanpur, Pulkurthy and Dharmasagar in four
stages for period from July-2017 to June 2019 (24 months was awarded under Non-EPC system to
M/s. Power Solution, Hyderabad for an amount of Rs. 7,72,30,862/- at (-) 1.18 less than ECV of
Rs. 7,81,53,068/-.

On 03.06.2018 while site verification it was observed that the following two nos. stem
pipes of air valves are damaged and leakages are detected at below locations in Zone 2.

( 1) Zone 2 – 1 no. Stem pipe of air valve failure at Chainage 19.0 Km near Nallakunta ( V )
( Photo graph for damaged stem pipe attached )Frequently,the stem pipe 6mm thickness
and 200 mm dia pipe are being damaged in pumping season.To improve the life of stem pipes for
smooth pumping it is necessitated to increase the thickness from 6mm to 10 mm , 200 mm dia
pipe with external lining of tarcoal and internal with epoxy coating .

In this regard the existing O & M contractor of JCR DLIS, Phase – I Operation &Maintenance
is hereby instructed to take up the rectification work immediately

The O&M agency has started the work as per instruction and completed the rectification of 1no.
stem pipe of air valve on 21.06.2018 at the chain age 19.0 Km near Nallakunta(V) in Zone 2 by
replacing 6mm thick pipe with 10 mm thick 200mm dia pipe with external lining of tarcoal and
internal Epoxy coating. ( Photo graph after repair stem pipe attached )

Hence, this report is submitted for favour of information and obtaining the early approval
from the competent authority.
REPORT FOR 1 NO.STEM PIPE REPAIR WORKS NEAR ZAKARAM ( V ) ZONE 3,
AT CHAINAGE 4.386KM - PHASE - 1

***
J.Chokka Rao Devadula Lift Irrigation Scheme is taken up to lift 38.16 TMC of
water from river Godavari near Gangaram (V), Kannaigudem(M), Jayashankar Bhupalapally
( Dist) in phased manner viz., Phase-I, Phase-II and Phase-III for providing irrigation facilities
to the upland drought prone areas of Jayashankar Bhupalpally, Karimnagar, Warangal (Urban),
Warangal (Rural), Jangaon, Yadadri, Suryapet & Siddipet of Telangana Region to an extent of
6.21 Lakh Acres including Drinking water facilities. Subsequently, the Government of
Telangana have enhanced the present allocation of 38.16 TMC to 60TMC of water vide
G.O.Rt.No.25, Dt: 21.01.2015.
The work of Operation and maintenance of Phase-I of JCR-DLI Scheme to Lift 10 Cumecs
of water from river Godavari near Gangaram (V), Eturnagaram (M) Warangal District with existing
Pipeline from Intake to R.S.Ghanpur via Bheemghanpur, Pulkurthy and Dharmasagar in four
stages for period from July-2017 to June 2019 (24 months was awarded under Non-EPC system to
M/s. Power Solution, Hyderabad for an amount of Rs. 7,72,30,862/- at (-) 1.18 less than ECV of
Rs. 7,81,53,068/-.

On 03.06.2018 while site verification it was observed that the following one no. stem
pipes of air valves is damaged and leakages are detected at below locations in Zone 3.

( 1 )Zone 3 – 1 no. Stem pipe of air valve failure at Chainage 4.386 Km near Zakaram forest ( V )
( Photo graph for damaged stem pipe attached )Frequently,the stem pipe 6mm thickness
and 200 mm dia pipe are being damaged in pumping season.To improve the life of stem pipes for
smooth pumping it is necessitated to increase the thickness from 6mm to 10 mm , 200 mm dia
pipe ,length 3 mtr with external lining of tar coal and internal with epoxy coating .

In this regard the existing O & M contractor of JCR DLIS, Phase – I Operation &Maintenance
is hereby instructed to take up the rectification work immediately

The O&M agency has started the work as per instruction and completed the rectification of 1no.
stem pipe of air valve on 2.06.2018 at the chain age 4.386 Km near Zakaram(V) in Zone 3 by
replacing 6mm thick pipe with 10 mm thick 200mm dia pipe,length 3 mtr with external lining of
tarcoal and internal Epoxy coating.
Hence, this report is submitted for favour of information and obtaining the early approval
from the competent authority.
REPORT FOR 1 NO.STEM PIPE REPAIR WORKS NEAR KAMAREDDYPALLI ( V ) ZONE 4,
AT CHAINAGE 4.281KM - PHASE - 1

***
J.Chokka Rao Devadula Lift Irrigation Scheme is taken up to lift 38.16 TMC of
water from river Godavari near Gangaram (V), Kannaigudem(M), Jayashankar Bhupalapally
( Dist) in phased manner viz., Phase-I, Phase-II and Phase-III for providing irrigation facilities
to the upland drought prone areas of Jayashankar Bhupalpally, Karimnagar, Warangal (Urban),
Warangal (Rural), Jangaon, Yadadri, Suryapet & Siddipet of Telangana Region to an extent of
6.21 Lakh Acres including Drinking water facilities. Subsequently, the Government of
Telangana have enhanced the present allocation of 38.16 TMC to 60TMC of water vide
G.O.Rt.No.25, Dt: 21.01.2015.
The work of Operation and maintenance of Phase-I of JCR-DLI Scheme to Lift 10 Cumecs
of water from river Godavari near Gangaram (V), Eturnagaram (M) Warangal District with existing
Pipeline from Intake to R.S.Ghanpur via Bheemghanpur, Pulkurthy and Dharmasagar in four
stages for period from July-2017 to June 2019 (24 months was awarded under Non-EPC system to
M/s. Power Solution, Hyderabad for an amount of Rs. 7,72,30,862/- at (-) 1.18 less than ECV of
Rs. 7,81,53,068/-.

On 03.06.2018 while site verification it was observed that the following one no. stem
pipes of air valves is damaged and leakages are detected at below locations in Zone 4.

( 1 )Zone 4 – 1 no. Stem pipe of air valve failure at Chainage 4.281 Km near Kamareddypalli ( V )
( Photo graph for damaged stem pipe attached )Frequently,the stem pipe 6mm thickness
and 200 mm dia pipe are being damaged in pumping season.To improve the life of stem pipes for
smooth pumping it is necessitated to increase the thickness from 6mm to 10 mm , 200 mm dia
pipe ,length 3 mtr with external lining of tar coal and internal with epoxy coating .

In this regard the existing O & M contractor of JCR DLIS, Phase – I Operation &Maintenance
is hereby instructed to take up the rectification work immediately

The O&M agency has started the work as per instruction and completed the rectification of 1no.
stem pipe of air valve on 24.06.2018 at the chain age 4.281Km near Kamareddypalli (V) in Zone
4 by replacing 6mm thick pipe with 10 mm thick 200mm dia pipe,length 3 mtr with external lining
of tarcoal and internal Epoxy coating.
Hence, this report is submitted for favour of information and obtaining the early approval
from the competent authority.
REPORT FOR 1 NO.STEM PIPE REPAIR WORKS NEAR KAMAYPALI ( V ) ZONE 4,
AT CHAINAGE 5.391KM - PHASE - 1

***
J.Chokka Rao Devadula Lift Irrigation Scheme is taken up to lift 38.16 TMC of
water from river Godavari near Gangaram (V), Kannaigudem(M), Jayashankar Bhupalapally
( Dist) in phased manner viz., Phase-I, Phase-II and Phase-III for providing irrigation facilities
to the upland drought prone areas of Jayashankar Bhupalpally, Karimnagar, Warangal (Urban),
Warangal (Rural), Jangaon, Yadadri, Suryapet & Siddipet of Telangana Region to an extent of
6.21 Lakh Acres including Drinking water facilities. Subsequently, the Government of
Telangana have enhanced the present allocation of 38.16 TMC to 60TMC of water vide
G.O.Rt.No.25, Dt: 21.01.2015.
The work of Operation and maintenance of Phase-I of JCR-DLI Scheme to Lift 10 Cumecs
of water from river Godavari near Gangaram (V), Eturnagaram (M) Warangal District with existing
Pipeline from Intake to R.S.Ghanpur via Bheemghanpur, Pulkurthy and Dharmasagar in four
stages for period from July-2017 to June 2019 (24 months was awarded under Non-EPC system to
M/s. Power Solution, Hyderabad for an amount of Rs. 7,72,30,862/- at (-) 1.18 less than ECV of
Rs. 7,81,53,068/-.

On 03.06.2018 while site verification it was observed that the following one no. stem
pipes of air valves is damaged and leakages are detected at below locations in Zone 4.

( 1 )Zone 4 – 1 no. Stem pipe of air valve failure at Chainage 5.391 Km near Kamareddypalli ( V )
( Photo graph for damaged stem pipe attached )Frequently,the stem pipe 6mm thickness
and 200 mm dia pipe are being damaged in pumping season.To improve the life of stem pipes for
smooth pumping it is necessitated to increase the thickness from 6mm to 10 mm , 200 mm dia
pipe ,length 3 mtr with external lining of tar coal and internal with epoxy coating .

In this regard the existing O & M contractor of JCR DLIS, Phase – I Operation &Maintenance
is hereby instructed to take up the rectification work immediately

The O&M agency has started the work as per instruction and completed the rectification of 1no.
stem pipe of air valve on 24.06.2018 at the chain age 5.381 Km near Zakaram(V) in Zone 4 by
replacing 6mm thick pipe with 10 mm thick 200mm dia pipe,length 3 mtr with external lining of
tarcoal and internal Epoxy coating.

Hence, this report is submitted for favour of information and obtaining the early approval
from the competent authority.
REPORT FOR 1 NO.STEM PIPE REPAIR WORKS NEAR RS Ghanpur ( V )
AT CHAINAGE 2.4KM - PHASE - 2

***
J.Chokka Rao Devadula Lift Irrigation Scheme is taken up to lift 38.16 TMC of
water from river Godavari near Gangaram (V), Kannaigudem(M), Jayashankar Bhupalapally
( Dist) in phased manner viz., Phase-I, Phase-II and Phase-III for providing irrigation facilities
to the upland drought prone areas of Jayashankar Bhupalpally, Karimnagar, Warangal (Urban),
Warangal (Rural), Jangaon, Yadadri, Suryapet & Siddipet of Telangana Region to an extent of
6.21 Lakh Acres including Drinking water facilities. Subsequently, the Government of
Telangana have enhanced the present allocation of 38.16 TMC to 60TMC of water vide
G.O.Rt.No.25, Dt: 21.01.2015.
The work of Operation and maintenance of Phase-I of JCR-DLI Scheme to Lift 10 Cumecs
of water from river Godavari near Gangaram (V), Eturnagaram (M) Warangal District with existing
Pipeline from Intake to R.S.Ghanpur via Bheemghanpur, Pulkurthy and Dharmasagar in four
stages for period from July-2017 to June 2019 (24 months was awarded under Non-EPC system to
M/s. Power Solution, Hyderabad for an amount of Rs. 7,72,30,862/- at (-) 1.18 less than ECV of
Rs. 7,81,53,068/-.

On 03.06.2018 while site verification it was observed that the following one no. stem
pipes of air valves is damaged and leakages are detected at below locations in Zone 4.

( 1 )Zone 4 – 1 no. Stem pipe of air valve failure at Chainage 5.391 Km near Kamareddypalli ( V )
( Photo graph for damaged stem pipe attached )Frequently,the stem pipe 6mm thickness
and 200 mm dia pipe are being damaged in pumping season.To improve the life of stem pipes for
smooth pumping it is necessitated to increase the thickness from 6mm to 10 mm , 200 mm dia
pipe ,length 3 mtr with external lining of tar coal and internal with epoxy coating .

In this regard the existing O & M contractor of JCR DLIS, Phase – I Operation &Maintenance
is hereby instructed to take up the rectification work immediately

The O&M agency has started the work as per instruction and completed the rectification of 1no.
stem pipe of air valve on 24.06.2018 at the chain age 5.381 Km near Zakaram(V) in Zone 4 by
replacing 6mm thick pipe with 10 mm thick 200mm dia pipe,length 3 mtr with external lining of
tarcoal and internal Epoxy coating.

Hence, this report is submitted for favour of information and obtaining the early approval
from the competent authority.