• Organizational Chart
• Electrabel NL
• Maxima Power Plant
Operational Data
• Inspections and Outages
Forced Outage FL41
Forced Outage FL51
• Other issues
Hotspot Generator Step Up Transformer FL51
Hotspot on Busducts
Update on cBN Cladded HPC Blading
• Questions
19-9-2019 3
ORGANIZATIONAL CHART

GDF Suez

BEEI

Energy
BeNeLuxDe

Ebl Nl

19-9-2019 4
ELECTRABEL NL
Eemshaven
5x GE F9Fa CCGT
1x Siemens V94.2 CCGT
Wind

Maxima
2x Alstom GT26 CCGT Bergum
1x GE F9E OCGT 4x GE F6B CCGT

Zwolle
Headoffice

Rotterdam Harculo
Coal / Biomass 1x GE F9B CCGT

Gelderland
Coal / Biomass

Key Figures:
Total Installed Power: 5046 MW
Under Construction: 800 MW

Electricity sales 2010: 21,5 TWh


Gas sales 2010: 16,7 TWh

19-9-2019 5
MAXIMA POWER PLANT

19-9-2019 6
MAXIMA POWER PLANT

• 2x KA26-1 SS CCGT 440MW (@ des. point)


• Natural Gas
• GT26B2.2 ChU
• 28k EOH, 24k OH, 1.2k WCE regime
• Triple Pressure HRSG (AlstomWindsor)
• HP, IP and LP Turbine
• Hydrogen cooled generators, 50WT21H-120
• Supplies to 150 kV and 380 kV Grid

• 1x GE F9E peak unit, 119 MW

19-9-2019 7
OPERATIONAL DATA 31-05-2011

FL41 FL51
s/n G02658 G02660
First Firing 20-02-2010 02-04-2010
COD 28-10-2010 28-10-2010
EOH total 13217 10946
EOH since last A-insp 7336 5133
OH total 7508 6620
OH since last A-insp 5688 5449
Starts total 110 89
Starts since last A-insp 38 27
Next inspection B1 - July 2011 B1 - September 2011
Next C-inspection C1 - 2013 C1 - 2013

19-9-2019 8
INSPECTIONS AND OUTAGES

• EV baseload inspections during EPC


 Forced Outage of FL41 @ 2029 EOH(*), 268 OH,
32 Starts

• A1 inspections during EPC


 Forced Outage on FL51 @ 4274 EOH, 1537 OH,
62 Starts

(*)= EOH counting inaccurate b/o ODC fault


19-9-2019 9
FORCED OUTAGE FL41

• EV Baseload Borescope Inspection


• 3 internal BI plugs missing on TVC
• Damaged LPT2 BI Vane (pos. #40) impingement
plate
• Unscheduled opening of GT
• 4 Weeks delay for commissioning

19-9-2019 10
FORCED OUTAGE FL41

Source: Alstom

19-9-2019 11
FORCED OUTAGE FL41

Source: Alstom

19-9-2019 12
FORCED OUTAGE FL41

NEW OLD

19-9-2019 13
FORCED OUTAGE FL41

• RCA revealed accidental removal of internal BI plugs


during RRP preparations and not restored
• Plugs found in Tools Locker on-site
• Jet from MBH30 plenum to MBH20 cavity caused
damage to impingement plate
• Single LPT2 Vane (pos. #40) replaced
• Neighboring LPT2 Vanes Red Dye inspected
• Correct installation on other unit verified

19-9-2019 14
FORCED OUTAGE FL51

• A1 Borescope Inspection
• Broken off LPT3 Blade Tip Shroud
• Damaged SHSS C
• Damaged LPT4 Vanes
• Damaged LPT4 Blades
• Damaged SHSS D
• Damaged EGH Struts
• Unscheduled opening of GT
• 4 Weeks delay for commissioning / Reliability Runs

19-9-2019 15
FORCED OUTAGE FL51

Source: Alstom

LPT3 Blade Tip Shroud missing

19-9-2019 16
FORCED OUTAGE FL51

LPT3 Blade Tip Shroud missing

19-9-2019 17
FORCED OUTAGE FL51

SHSS C damaged

19-9-2019 18
FORCED OUTAGE FL51

LPT4 Vane damaged SHSS D damaged

19-9-2019 19
FORCED OUTAGE FL51

LPT4 Blade damaged

19-9-2019 20
FORCED OUTAGE FL51

LPT4 Blade damaged

19-9-2019 21
FORCED OUTAGE FL51

EGH Struts damaged

19-9-2019 22
FORCED OUTAGE FL51

• RCA investigation (subject to Confidentiality


Agreement)
• New Parts installed
New LPT3 Blade row
New SHSS C row
New LPT4 Blade row
Partially New LPT4 Vane row (12oo38)
New SHSS D row
• CIB’s 20100927 and 20110209 issued by Alstom
• Good cooperation between Alstom, Electrabel and
Laborelec during RCA

19-9-2019 23
OTHER ISSUES

• Hotspot on Generator Step Up Transformer FL51


• Hotspots on Busducts of both units
• Update on cBN Cladded HPC Blading?

19-9-2019 24
HOTSPOT GSUT FL51

• Dissolved gasses in GSUT (Areva)


• Hotspot temp. assumed to be >700ºC
• Kelmann online monitoring system used
• New GSUT delivered and installed under warranty by
Alstom
• RCA is ongoing

19-9-2019 25
HOTSPOTS ON BUSDUCTS

• Surface temperature of 135ºC


• Busducts in contact with eachother, causing
circulating current

19-9-2019 26
UPDATE ON CBN CLADDED HPC
BLADING?

• CFSI C_211994 states 12 cladded blades per row (row


18 – 22 HPC), as presented in 2009.
• cBN cladded blades installed only on rows 17, 21 and 22
(observed during FO of FL41 & FL51)

• Why was this CFSI changed and is there more info


available?
• Wasn’t blade tip cracking and liberation most observed
on rows 19 & 20?

19-9-2019 27
QUESTIONS

19-9-2019 28

You might also like