You are on page 1of 8

02

01
No.
(m)
Chainage (m)

Pipe slope (%)


Size type of pipe
Ground level (m)

Escavation depth
Partial distance (m)
Pipe crown level (m)
1.10 0 2826.68 2827.48
1.09 3.07 2826.28 2827.08
1.10 6.05 2825.60 2826.40
1.10 11.09 2826.05 2826.86
1.09 13.08 2826.61 2827.40
1.09 16.10 2827.12 2827.91

1.10 31.04 2827.64 2828.44

REVISION:
1.12 50.96 2828.04 2828.86

1.17 70.96 2828.54 2829.41

1.16 91.01 2829.14 2830.00

Date:
1.18 110.97 2829.54 2830.42

1.15 131.00 2830.24 2831.09

1.15 150.80 2830.58 2831.43

May 2017
1.16 170.97 2830.78 2831.65

January 2016
1.17 191.01 2830.94 2831.82

1.15 230.93 2831.54 2832.40

1.12 271.01 2831.74 2832.56

1.12 291.00 2832.12 2832.94

1.12 311.19 2832.22 2833.04

Signature:
1.13 351.22 2832.58 2833.42

1.14 371.10 2832.82 2833.66

1.13 391.26 2832.92 2833.75

1.13 431.33 2833.10 2833.92

1.14 451.34 2833.48 2834.31

FLD
LEGEND
1.14 491.33 2833.82 2834.65

1.14 511.44 2834.00 2834.84

1.14 531.38 2834.25 2835.09

1.15 551.30 2834.44 2835.29

1.15 571.28 2834.68 2835.53

1.16 591.31 2834.94 2835.80

1.16 611.44 2835.05 2835.90

1.14 651.45 2835.43 2836.27

Ground level
1.15 671.44 2835.68 2836.52

Flushing device
1.16 711.34 2835.89 2836.75

Transmission main
1.16 731.40 2836.03 2836.88

NSR New Service Reservoir


1.13 751.26 2836.08 2836.91

1.12 791.27 2836.26 2837.08

1.12 811.16 2836.16 2836.97

BH
1.18 851.14 2835.56 2836.43

1.18 871.28 2835.50 2836.38

1.17 891.23 2835.28 2836.15

1.17 911.12 2835.03 2835.89

1.16 931.21 2834.87 2835.73

1.16 951.22 2834.59 2835.45

1.16 971.34 2834.48 2835.34

1.16 991.31 2834.37 2835.23

Washout
1.16 1011.44 2834.22 2835.08

Borehole
1.16 1031.26 2834.02 2834.88

1.16 1051.43 2833.85 2834.71

1.16 1071.87 2833.50 2834.36

DC Distribution Center
1.11 1092.09 2833.56 2834.37

Air Release Valve


1.11 1111.96 2833.64 2834.45

1.13 1132.10 2833.58 2834.41

1.10 1152.09 2833.88 2834.68

1.12 1172.09 2833.82 2834.65

1.12 1192.07 2834.02 2834.84

1.16 1212.20 2833.96 2834.82

CLIENT:
1.16 1232.24 2834.14 2835

1.16 1252.28 2834.03 2834.89

PROJECT:
1.10 1272.37 2834.09 2834.89

PROJECT
1.09 1292.29 2834.15 2834.94

1.10 1312.43 2834.35 2835.15

1.09 1332.43 2834.49 2835.28

1.09 1352.38 2834.29 2835.08

1.11 1372.48 2834.47 2835.28

1.13 1392.60 2834.75 2835.58

1.14 1412.81 2834.65 2835.49

1.15 1452.90 2834.89 2835.74

1.17 1472.89 2835.07 2835.94

1.18 1492.77 2835.27 2836.15

1.17 1512.79 2835.57 2836.44

SHENO WATER SUPPLY


1.14 1532.79 2836.07 2836.91

1.09 1553.05 2836.13 2836.92

1.10 1573.18 2835.95 2836.75

1.12 1593.13 2835.89 2836.71

1.11 1613.12 2835.59 2836.4

1.15 1633.08 2834.79 2835.65

1.16 1653.06 2834.63 2835.49

1.15 1673.07 2834.41 2835.26

1.15 1693.01 2833.95 2834.8

1.16 1712.99 2834.31 2835.17

Consultant:
1.15 1733.00 2833.97 2834.82

1.17 1753.00 2833.51 2834.38

P.O. BOX 1354


1.15 1773.05 2833.11 2833.96

1.21 1793.05 2833.05 2833.96

1.19 1813.03 2832.65 2833.55

Maputo, Mozambique
1.19 1833.04 2832.47 2833.36

Cell:+258 82 326 5523


Tel:+258 21 417 605/10
1.18 1853.01 2832.07 2832.96

1.17 1872.99 2831.94 2832.82

1.18 1892.96 2831.83 2832.71

1.17 1913.07 2831.87 2832.74

1.16 1933.28 2831.61 2832.47

1.14 1953.36 2831.51 2832.36

Av. da Malhangalene, No 620, R/C


1.14 1973.40 2831.31 2832.15

Email:salomon.geral@tvcabo.co.mz
1.11 1993.41 2831.37 2832.18

1.09 2013.40 2831.19 2831.98

1.10 2033.43 2831.29 2832.09

1.09 2053.40 2831.13 2831.92

1.08 2073.45 2831.34 2832.13

1.09 2093.46 2831.48 2832.28

1.15 2113.53 2831.42 2832.28

1.16 2133.53 2831.62 2832.48

1.17 2153.55 2831.59 2832.46

1.17 2173.54 2831.89 2832.77

ETHIOPIA
1.16 2198.49 2832.29 2833.15

ADDIS-ABABA
1.19 2247.64 2833.13 2834.01

Tel:+25191 123 1163


Email:ygry14@gmail.com 1.15 2302.45 2833.4 2834.25

1.14 2329.69 2833.81 2834.65


YGRY-Engineering Consulting PLC

1.16 2419.96 2834.89 2835.76


TRANSMISSION MAIN FROM BRIDGE TO DCR1

1.17 2491.89 2835.75 2836.62


Subject:

1.19 2578.40 2838 2838.89

1.21 2630.32 2839.41 2840.32

1.20 2680.04 2841.24 2842.14

1.17 2735.64 2844.41 2845.29

1.16 2762.63 2846.9 2847.76


1.17 2767.24 2846.21 2847.07
Station: 0+000 - 3+636.33

1.15 2825.78 2845.74 2846.59

1.18 2878.26 2845.03 2845.91

1.19 2913.17 2845.97 2846.86

1.08 2938.65 2844.57 2845.35

1.10 2967.02 2845.99 2846.79

1.12 3027.59 2846.59 2847.42


TRANSMISSION MAIN FROM BRIDGE TO DCR1

1.13 3074.55 2846.73 2847.56

1.08 3135.70 2846.92 2847.7

1.19 3172.20 2848.01 2848.91

1.18 3217.36 2850.99 2851.87


Scale: As Shown

1.16 3275.67 2855.25 2856.11

1.18 3309.21 2858.44 2859.31


Cad by: Salomon,Lda
Designed: N. Matsinhe

1.17 3327.04 2859.86 2860.73

1.19 3351.53 2862.43 2863.33

1.14 3376.26 2865.15 2865.99

1.17 3397.75 2868.16 2869.03

1.16 3413.79 2869.85 2870.71

1.15 3430.25 2871 2871.85

1.07 3460.25 2874 2874.77

1.10 3493.56 2877.93 2878.73

1.13 3522.35 2883.11 2883.95


Drawing Nº: ShWSP - TM - 01.0

1.19 3558.85 2890.41 2891.3


Date: May, 2017

1.21 3573.12 2892.13 2893.04

1.16 3585.43 2893.23 2894.09

1.11 3619.09 2895.25 2896.06


Checked: N. Matsinhe

1.16 3632.59 2897.14 2898


Approved: N. Matsinhe

1.16 3636.33 2897.29 2898.15


Ground level (m)
2828.86

2829.41

2830.00

2830.42

2831.09

2831.43

2831.65

2831.82

2832.40

2832.56

2832.94

2833.04

2833.42

2833.66

2833.75

2833.92

2834.31

2834.65

2834.84
2827.91
2827.08
2827.48

2826.86
2826.40

2828.44
2827.40

Size type of pipe


2826.68

Pipe crown level (m)


2828.04

2828.54

2829.14

2829.54

2830.24

2830.58

2830.78

2830.94

2831.54

2831.74

2832.12

2832.22

2832.58

2832.82

2832.92

2833.10

2833.48

2833.82

2834.00
2826.05
2827.12
2826.28
2825.60

2827.64
2826.61

Partial distance (m)


Chainage (m)

1.13 431.33

1.14 451.34

1.14 491.33
1.12 311.19

1.13 351.22

1.14 371.10

1.13 391.26

1.14 511.44
1.15 230.93

1.12 271.01

1.12 291.00
1.18 110.97

1.15 131.00

1.15 150.80

1.16 170.97

1.17 191.01
11.09

31.04
16.10

1.16 91.01
1.17 70.96
1.12 50.96
13.08
6.05
3.07
0

Escavation depth
1.09

1.09
1.10
1.10

1.10
1.10

1.09

(m)
Pipe slope (%)

REVISION: CLIENT: Consultant: Subject: Designed: N. Matsinhe


LEGEND
YGRY-Engineering Consulting PLC
Checked: N. Matsinhe
Air Release Valve
No. Date: Signature: Transmission main Email:ygry14@gmail.com TRANSMISSION MAIN FROM BRIDGE TO DCR1
Av. da Malhangalene, No 620, R/C Cad by: Salomon,Lda Approved: N. Matsinhe
01 January 2016 Ground level Washout Tel:+258 21 417 605/10 Tel:+25191 123 1163
PROJECT: Cell:+258 82 326 5523 Scale: As Shown Date: May, 2017
02 May 2017 FLD Flushing device BH Borehole Email:salomon.geral@tvcabo.co.mz
ADDIS-ABABA

NSR New Service Reservoir SHENO WATER SUPPLY P.O. BOX 1354 ETHIOPIA Station: 0+000 - 0+511.44
DC Distribution Center Drawing Nº: ShWSP - TM - 01.1
PROJECT Maputo, Mozambique
Ground level (m)
2834.84

2835.09

2835.29

2835.53

2835.80

2835.90

2836.27

2836.52

2836.75

2836.88

2836.91

2837.08

2836.97

2836.43

2836.38

2836.15

2835.89

2835.73

2835.45

2835.34

2835.23

2835.08
Size type of pipe
Pipe crown level (m)
2834.00

2834.25

2834.68

2835.05

2835.43

2835.68

2835.89

2836.03

2836.08

2836.26

2836.16

2835.56

2835.50

2835.28

2835.03

2834.87

2834.59

2834.48

2834.37

2834.22
2834.44

2834.94

Partial distance (m)


Chainage (m)

1.16 1011.44
1.12 811.16

1.18 851.14

1.18 871.28

1.17 891.23

1.17 911.12

1.16 931.21

1.16 951.22

1.16 971.34

1.16 991.31
1.14 511.44

1.14 531.38

1.15 551.30

1.15 571.28

1.16 591.31

1.16 711.34

1.16 731.40

1.13 751.26

1.12 791.27
1.16 611.44

1.14 651.45

1.15 671.44

Escavation depth
(m)
Pipe slope (%)

REVISION: CLIENT: Consultant: Subject: Designed: N. Matsinhe


LEGEND
YGRY-Engineering Consulting PLC
Checked: N. Matsinhe
Air Release Valve
No. Date: Signature: Transmission main Email:ygry14@gmail.com TRANSMISSION MAIN FROM BRIDGE TO DCR1
Av. da Malhangalene, No 620, R/C Cad by: Salomon,Lda Approved: N. Matsinhe
01 January 2016 Ground level Washout Tel:+258 21 417 605/10 Tel:+25191 123 1163
PROJECT: Cell:+258 82 326 5523 Scale: As Shown Date: May, 2017
02 May 2017 FLD Flushing device BH Borehole Email:salomon.geral@tvcabo.co.mz
ADDIS-ABABA

NSR New Service Reservoir SHENO WATER SUPPLY P.O. BOX 1354 ETHIOPIA Station: 0+511.44 - 1+011.44
DC Distribution Center Drawing Nº: ShWSP - TM - 01.2
PROJECT Maputo, Mozambique
Ground level (m)
2835.08

2834.88

2834.71

2834.36

2834.37

2834.45

2834.41

2834.68

2834.65

2834.84

2834.82

2834.89

2834.89

2834.94

2835.15

2835.28

2835.08

2835.28

2835.58

2835.49

2835.74

2835.94

2836.15

2836.44
2835
Size type of pipe

2834.03
Pipe crown level (m)
2833.82

2834.02
2833.58

2833.88
2833.56

2833.96
2833.50
2834.22

2834.02

2833.85

2834.09

2834.15

2834.35

2834.49

2834.29

2834.47

2834.75

2834.65

2834.89

2835.07

2835.27

2835.57
2833.64

2834.14
Partial distance (m)
Chainage (m)
1.16 1011.44

1.16 1031.26

1.16 1051.43

1.16 1071.87

1.11 1092.09

1.11 1111.96

1.13 1132.10

1.10 1152.09

1.12 1172.09

1.12 1192.07

1.16 1212.20

1.16 1232.24

1.16 1252.28

1.10 1272.37

1.09 1292.29

1.10 1312.43

1.09 1332.43

1.09 1352.38

1.11 1372.48

1.13 1392.60

1.14 1412.81

1.15 1452.90

1.17 1472.89

1.18 1492.77

1.17 1512.79
Escavation depth
(m)
Pipe slope (%)

REVISION: CLIENT: Consultant: Subject: Designed: N. Matsinhe


LEGEND
YGRY-Engineering Consulting PLC
Checked: N. Matsinhe
Air Release Valve
No. Date: Signature: Transmission main Email:ygry14@gmail.com TRANSMISSION MAIN FROM BRIDGE TO DCR1
Av. da Malhangalene, No 620, R/C Cad by: Salomon,Lda Approved: N. Matsinhe
01 January 2016 Ground level Washout Tel:+258 21 417 605/10 Tel:+25191 123 1163
PROJECT: Cell:+258 82 326 5523 Scale: As Shown Date: May, 2017
02 May 2017 FLD Flushing device BH Borehole Email:salomon.geral@tvcabo.co.mz
ADDIS-ABABA

NSR New Service Reservoir SHENO WATER SUPPLY P.O. BOX 1354 ETHIOPIA Station: 1+011.44 - 1+512.79
DC Distribution Center Drawing Nº: ShWSP - TM - 01.3
PROJECT Maputo, Mozambique
Ground level (m)
2836.44

2836.91

2836.92

2836.75

2836.71

2835.65

2835.49

2835.26

2835.17

2834.82

2834.38

2833.96

2833.96

2833.55

2833.36

2832.96

2832.82

2832.71

2832.74

2832.47

2832.36

2832.15

2832.18

2831.98
2836.4

Size type of pipe 2834.8


Pipe crown level (m)
2835.57

2836.07

2836.13

2835.95

2835.89

2835.59

2834.79

2834.63

2834.41

2833.95

2834.31

2833.97

2833.51

2833.11

2833.05

2832.65

2832.47

2832.07

2831.83

2831.87

2831.61

2831.51

2831.31

2831.37

2831.19
2831.94
Partial distance (m)
Chainage (m)

1.09 2013.40
1.17 1512.79

1.14 1532.79

1.09 1553.05

1.10 1573.18

1.12 1593.13

1.11 1613.12

1.15 1633.08

1.16 1653.06

1.15 1673.07

1.15 1693.01

1.16 1712.99

1.15 1733.00

1.17 1753.00

1.15 1773.05

1.21 1793.05

1.19 1813.03

1.19 1833.04

1.18 1853.01

1.17 1872.99

1.18 1892.96

1.17 1913.07

1.16 1933.28

1.14 1953.36

1.14 1973.40

1.11 1993.41
Escavation depth
(m)
Pipe slope (%)

REVISION: CLIENT: Consultant: Subject: Designed: N. Matsinhe


LEGEND
YGRY-Engineering Consulting PLC
Checked: N. Matsinhe
Air Release Valve
No. Date: Signature: Transmission main Email:ygry14@gmail.com TRANSMISSION MAIN FROM BRIDGE TO DCR1
Av. da Malhangalene, No 620, R/C Cad by: Salomon,Lda Approved: N. Matsinhe
01 January 2016 Ground level Washout Tel:+258 21 417 605/10 Tel:+25191 123 1163
PROJECT: Cell:+258 82 326 5523 Scale: As Shown Date: May, 2017
02 May 2017 FLD Flushing device BH Borehole Email:salomon.geral@tvcabo.co.mz
ADDIS-ABABA

NSR New Service Reservoir SHENO WATER SUPPLY P.O. BOX 1354 ETHIOPIA Station: 1+512.79 - 2+013.40
DC Distribution Center Drawing Nº: ShWSP - TM - 01.4
PROJECT Maputo, Mozambique
Ground level (m)
2831.98

2832.09

2831.92

2832.13

2832.28

2832.28

2832.48

2832.46

2832.77

2833.15

2834.01

2834.25

2834.65

2835.76

2836.62

2838.89
Size type of pipe
Pipe crown level (m)
2831.19

2831.29

2831.13

2831.48

2831.42

2831.62

2831.59

2831.89

2832.29

2833.13

2833.81

2834.89

2835.75
2831.34

2833.4

2838
Partial distance (m)
Chainage (m)
1.09 2013.40

1.10 2033.43

1.09 2053.40

1.08 2073.45

1.09 2093.46

1.15 2113.53

1.16 2133.53

1.17 2153.55

1.17 2173.54

1.16 2198.49

1.19 2247.64

1.15 2302.45

1.14 2329.69

1.16 2419.96

1.17 2491.89

1.19 2578.40
Escavation depth
(m)
Pipe slope (%)

REVISION: CLIENT: Consultant: Subject: Designed: N. Matsinhe


LEGEND
YGRY-Engineering Consulting PLC
Checked: N. Matsinhe
Air Release Valve
No. Date: Signature: Transmission main Email:ygry14@gmail.com TRANSMISSION MAIN FROM BRIDGE TO DCR1
Av. da Malhangalene, No 620, R/C Cad by: Salomon,Lda Approved: N. Matsinhe
01 January 2016 Ground level Washout Tel:+258 21 417 605/10 Tel:+25191 123 1163
PROJECT: Cell:+258 82 326 5523 Scale: As Shown Date: May, 2017
02 May 2017 FLD Flushing device BH Borehole Email:salomon.geral@tvcabo.co.mz
ADDIS-ABABA

NSR New Service Reservoir SHENO WATER SUPPLY P.O. BOX 1354 ETHIOPIA Station: 2+013.40 - 2+578.40
DC Distribution Center Drawing Nº: ShWSP - TM - 01.5
PROJECT Maputo, Mozambique
Ground level (m)
2838.89

2840.32

2842.14

2845.29

2847.76
2847.07

2846.59

2845.91

2846.86

2845.35

2846.79

2847.42
Size type of pipe
Pipe crown level (m)
2839.41

2841.24

2844.41

2846.21

2845.74

2845.03

2845.97

2844.57

2845.99

2846.59
2846.9
2838

Partial distance (m)


Chainage (m)

1.12 3027.59
1.19 2578.40

1.21 2630.32

1.20 2680.04

1.17 2735.64

1.16 2762.63
1.17 2767.24

1.15 2825.78

1.18 2878.26

1.19 2913.17

1.08 2938.65

1.10 2967.02
Escavation depth
(m)
Pipe slope (%)

REVISION: CLIENT: Consultant: Subject: Designed: N. Matsinhe


LEGEND
YGRY-Engineering Consulting PLC
Checked: N. Matsinhe
Air Release Valve
No. Date: Signature: Transmission main Email:ygry14@gmail.com TRANSMISSION MAIN FROM BRIDGE TO DCR1
Av. da Malhangalene, No 620, R/C Cad by: Salomon,Lda Approved: N. Matsinhe
01 January 2016 Ground level Washout Tel:+258 21 417 605/10 Tel:+25191 123 1163
PROJECT: Cell:+258 82 326 5523 Scale: As Shown Date: May, 2017
02 May 2017 FLD Flushing device BH Borehole Email:salomon.geral@tvcabo.co.mz
ADDIS-ABABA

NSR New Service Reservoir SHENO WATER SUPPLY P.O. BOX 1354 ETHIOPIA Station: 2+578.40 - 3+027.59
DC Distribution Center Drawing Nº: ShWSP - TM - 01.6
PROJECT Maputo, Mozambique
Ground level (m)
2847.42

2847.56

2848.91

2851.87

2856.11

2859.31

2860.73

2863.33

2865.99

2869.03

2870.71

2871.85

2874.77

2878.73

2883.95

2893.04

2894.09

2896.06

2898.15
2847.7

2891.3

2898
Size type of pipe
Pipe crown level (m)
2846.59

2846.73

2846.92

2848.01

2850.99

2855.25

2859.86

2862.43

2865.15

2868.16

2869.85

2877.93

2883.11

2890.41

2892.13

2893.23

2895.25

2897.29
2858.44

2897.14
2871

2874
Partial distance (m)
Chainage (m)
1.12 3027.59

1.13 3074.55

1.08 3135.70

1.19 3172.20

1.18 3217.36

1.16 3275.67

1.18 3309.21

1.17 3327.04

1.19 3351.53

1.14 3376.26

1.17 3397.75

1.16 3413.79

1.15 3430.25

1.07 3460.25

1.10 3493.56

1.13 3522.35

1.19 3558.85

1.21 3573.12

1.16 3585.43

1.11 3619.09

1.16 3632.59
1.16 3636.33
Escavation depth
(m)
Pipe slope (%)

REVISION: CLIENT: Consultant: Subject: Designed: N. Matsinhe


LEGEND
YGRY-Engineering Consulting PLC
Checked: N. Matsinhe
Air Release Valve
No. Date: Signature: Transmission main Email:ygry14@gmail.com TRANSMISSION MAIN FROM BRIDGE TO DCR1
Av. da Malhangalene, No 620, R/C Cad by: Salomon,Lda Approved: N. Matsinhe
01 January 2016 Ground level Washout Tel:+258 21 417 605/10 Tel:+25191 123 1163
PROJECT: Cell:+258 82 326 5523 Scale: As Shown Date: May, 2017
02 May 2017 FLD Flushing device BH Borehole Email:salomon.geral@tvcabo.co.mz
ADDIS-ABABA

NSR New Service Reservoir SHENO WATER SUPPLY P.O. BOX 1354 ETHIOPIA Station: 3+027.59 - 3+636.33
DC Distribution Center Drawing Nº: ShWSP - TM - 01.7
PROJECT Maputo, Mozambique