Professional Documents
Culture Documents
01
No.
(m)
Chainage (m)
Escavation depth
Partial distance (m)
Pipe crown level (m)
1.10 0 2826.68 2827.48
1.09 3.07 2826.28 2827.08
1.10 6.05 2825.60 2826.40
1.10 11.09 2826.05 2826.86
1.09 13.08 2826.61 2827.40
1.09 16.10 2827.12 2827.91
REVISION:
1.12 50.96 2828.04 2828.86
Date:
1.18 110.97 2829.54 2830.42
May 2017
1.16 170.97 2830.78 2831.65
January 2016
1.17 191.01 2830.94 2831.82
Signature:
1.13 351.22 2832.58 2833.42
FLD
LEGEND
1.14 491.33 2833.82 2834.65
Ground level
1.15 671.44 2835.68 2836.52
Flushing device
1.16 711.34 2835.89 2836.75
Transmission main
1.16 731.40 2836.03 2836.88
BH
1.18 851.14 2835.56 2836.43
Washout
1.16 1011.44 2834.22 2835.08
Borehole
1.16 1031.26 2834.02 2834.88
DC Distribution Center
1.11 1092.09 2833.56 2834.37
CLIENT:
1.16 1232.24 2834.14 2835
PROJECT:
1.10 1272.37 2834.09 2834.89
PROJECT
1.09 1292.29 2834.15 2834.94
Consultant:
1.15 1733.00 2833.97 2834.82
Maputo, Mozambique
1.19 1833.04 2832.47 2833.36
Email:salomon.geral@tvcabo.co.mz
1.11 1993.41 2831.37 2832.18
ETHIOPIA
1.16 2198.49 2832.29 2833.15
ADDIS-ABABA
1.19 2247.64 2833.13 2834.01
2829.41
2830.00
2830.42
2831.09
2831.43
2831.65
2831.82
2832.40
2832.56
2832.94
2833.04
2833.42
2833.66
2833.75
2833.92
2834.31
2834.65
2834.84
2827.91
2827.08
2827.48
2826.86
2826.40
2828.44
2827.40
2828.54
2829.14
2829.54
2830.24
2830.58
2830.78
2830.94
2831.54
2831.74
2832.12
2832.22
2832.58
2832.82
2832.92
2833.10
2833.48
2833.82
2834.00
2826.05
2827.12
2826.28
2825.60
2827.64
2826.61
1.13 431.33
1.14 451.34
1.14 491.33
1.12 311.19
1.13 351.22
1.14 371.10
1.13 391.26
1.14 511.44
1.15 230.93
1.12 271.01
1.12 291.00
1.18 110.97
1.15 131.00
1.15 150.80
1.16 170.97
1.17 191.01
11.09
31.04
16.10
1.16 91.01
1.17 70.96
1.12 50.96
13.08
6.05
3.07
0
Escavation depth
1.09
1.09
1.10
1.10
1.10
1.10
1.09
(m)
Pipe slope (%)
NSR New Service Reservoir SHENO WATER SUPPLY P.O. BOX 1354 ETHIOPIA Station: 0+000 - 0+511.44
DC Distribution Center Drawing Nº: ShWSP - TM - 01.1
PROJECT Maputo, Mozambique
Ground level (m)
2834.84
2835.09
2835.29
2835.53
2835.80
2835.90
2836.27
2836.52
2836.75
2836.88
2836.91
2837.08
2836.97
2836.43
2836.38
2836.15
2835.89
2835.73
2835.45
2835.34
2835.23
2835.08
Size type of pipe
Pipe crown level (m)
2834.00
2834.25
2834.68
2835.05
2835.43
2835.68
2835.89
2836.03
2836.08
2836.26
2836.16
2835.56
2835.50
2835.28
2835.03
2834.87
2834.59
2834.48
2834.37
2834.22
2834.44
2834.94
1.16 1011.44
1.12 811.16
1.18 851.14
1.18 871.28
1.17 891.23
1.17 911.12
1.16 931.21
1.16 951.22
1.16 971.34
1.16 991.31
1.14 511.44
1.14 531.38
1.15 551.30
1.15 571.28
1.16 591.31
1.16 711.34
1.16 731.40
1.13 751.26
1.12 791.27
1.16 611.44
1.14 651.45
1.15 671.44
Escavation depth
(m)
Pipe slope (%)
NSR New Service Reservoir SHENO WATER SUPPLY P.O. BOX 1354 ETHIOPIA Station: 0+511.44 - 1+011.44
DC Distribution Center Drawing Nº: ShWSP - TM - 01.2
PROJECT Maputo, Mozambique
Ground level (m)
2835.08
2834.88
2834.71
2834.36
2834.37
2834.45
2834.41
2834.68
2834.65
2834.84
2834.82
2834.89
2834.89
2834.94
2835.15
2835.28
2835.08
2835.28
2835.58
2835.49
2835.74
2835.94
2836.15
2836.44
2835
Size type of pipe
2834.03
Pipe crown level (m)
2833.82
2834.02
2833.58
2833.88
2833.56
2833.96
2833.50
2834.22
2834.02
2833.85
2834.09
2834.15
2834.35
2834.49
2834.29
2834.47
2834.75
2834.65
2834.89
2835.07
2835.27
2835.57
2833.64
2834.14
Partial distance (m)
Chainage (m)
1.16 1011.44
1.16 1031.26
1.16 1051.43
1.16 1071.87
1.11 1092.09
1.11 1111.96
1.13 1132.10
1.10 1152.09
1.12 1172.09
1.12 1192.07
1.16 1212.20
1.16 1232.24
1.16 1252.28
1.10 1272.37
1.09 1292.29
1.10 1312.43
1.09 1332.43
1.09 1352.38
1.11 1372.48
1.13 1392.60
1.14 1412.81
1.15 1452.90
1.17 1472.89
1.18 1492.77
1.17 1512.79
Escavation depth
(m)
Pipe slope (%)
NSR New Service Reservoir SHENO WATER SUPPLY P.O. BOX 1354 ETHIOPIA Station: 1+011.44 - 1+512.79
DC Distribution Center Drawing Nº: ShWSP - TM - 01.3
PROJECT Maputo, Mozambique
Ground level (m)
2836.44
2836.91
2836.92
2836.75
2836.71
2835.65
2835.49
2835.26
2835.17
2834.82
2834.38
2833.96
2833.96
2833.55
2833.36
2832.96
2832.82
2832.71
2832.74
2832.47
2832.36
2832.15
2832.18
2831.98
2836.4
2836.07
2836.13
2835.95
2835.89
2835.59
2834.79
2834.63
2834.41
2833.95
2834.31
2833.97
2833.51
2833.11
2833.05
2832.65
2832.47
2832.07
2831.83
2831.87
2831.61
2831.51
2831.31
2831.37
2831.19
2831.94
Partial distance (m)
Chainage (m)
1.09 2013.40
1.17 1512.79
1.14 1532.79
1.09 1553.05
1.10 1573.18
1.12 1593.13
1.11 1613.12
1.15 1633.08
1.16 1653.06
1.15 1673.07
1.15 1693.01
1.16 1712.99
1.15 1733.00
1.17 1753.00
1.15 1773.05
1.21 1793.05
1.19 1813.03
1.19 1833.04
1.18 1853.01
1.17 1872.99
1.18 1892.96
1.17 1913.07
1.16 1933.28
1.14 1953.36
1.14 1973.40
1.11 1993.41
Escavation depth
(m)
Pipe slope (%)
NSR New Service Reservoir SHENO WATER SUPPLY P.O. BOX 1354 ETHIOPIA Station: 1+512.79 - 2+013.40
DC Distribution Center Drawing Nº: ShWSP - TM - 01.4
PROJECT Maputo, Mozambique
Ground level (m)
2831.98
2832.09
2831.92
2832.13
2832.28
2832.28
2832.48
2832.46
2832.77
2833.15
2834.01
2834.25
2834.65
2835.76
2836.62
2838.89
Size type of pipe
Pipe crown level (m)
2831.19
2831.29
2831.13
2831.48
2831.42
2831.62
2831.59
2831.89
2832.29
2833.13
2833.81
2834.89
2835.75
2831.34
2833.4
2838
Partial distance (m)
Chainage (m)
1.09 2013.40
1.10 2033.43
1.09 2053.40
1.08 2073.45
1.09 2093.46
1.15 2113.53
1.16 2133.53
1.17 2153.55
1.17 2173.54
1.16 2198.49
1.19 2247.64
1.15 2302.45
1.14 2329.69
1.16 2419.96
1.17 2491.89
1.19 2578.40
Escavation depth
(m)
Pipe slope (%)
NSR New Service Reservoir SHENO WATER SUPPLY P.O. BOX 1354 ETHIOPIA Station: 2+013.40 - 2+578.40
DC Distribution Center Drawing Nº: ShWSP - TM - 01.5
PROJECT Maputo, Mozambique
Ground level (m)
2838.89
2840.32
2842.14
2845.29
2847.76
2847.07
2846.59
2845.91
2846.86
2845.35
2846.79
2847.42
Size type of pipe
Pipe crown level (m)
2839.41
2841.24
2844.41
2846.21
2845.74
2845.03
2845.97
2844.57
2845.99
2846.59
2846.9
2838
1.12 3027.59
1.19 2578.40
1.21 2630.32
1.20 2680.04
1.17 2735.64
1.16 2762.63
1.17 2767.24
1.15 2825.78
1.18 2878.26
1.19 2913.17
1.08 2938.65
1.10 2967.02
Escavation depth
(m)
Pipe slope (%)
NSR New Service Reservoir SHENO WATER SUPPLY P.O. BOX 1354 ETHIOPIA Station: 2+578.40 - 3+027.59
DC Distribution Center Drawing Nº: ShWSP - TM - 01.6
PROJECT Maputo, Mozambique
Ground level (m)
2847.42
2847.56
2848.91
2851.87
2856.11
2859.31
2860.73
2863.33
2865.99
2869.03
2870.71
2871.85
2874.77
2878.73
2883.95
2893.04
2894.09
2896.06
2898.15
2847.7
2891.3
2898
Size type of pipe
Pipe crown level (m)
2846.59
2846.73
2846.92
2848.01
2850.99
2855.25
2859.86
2862.43
2865.15
2868.16
2869.85
2877.93
2883.11
2890.41
2892.13
2893.23
2895.25
2897.29
2858.44
2897.14
2871
2874
Partial distance (m)
Chainage (m)
1.12 3027.59
1.13 3074.55
1.08 3135.70
1.19 3172.20
1.18 3217.36
1.16 3275.67
1.18 3309.21
1.17 3327.04
1.19 3351.53
1.14 3376.26
1.17 3397.75
1.16 3413.79
1.15 3430.25
1.07 3460.25
1.10 3493.56
1.13 3522.35
1.19 3558.85
1.21 3573.12
1.16 3585.43
1.11 3619.09
1.16 3632.59
1.16 3636.33
Escavation depth
(m)
Pipe slope (%)
NSR New Service Reservoir SHENO WATER SUPPLY P.O. BOX 1354 ETHIOPIA Station: 3+027.59 - 3+636.33
DC Distribution Center Drawing Nº: ShWSP - TM - 01.7
PROJECT Maputo, Mozambique