You are on page 1of 21

Confidential Checked

ARCELORMITTAL MEXICO S.A. de C.V. WP Constructora S.A. de C.V.


ArcelorMittal Lazaro Cardenas

Detail Engineering

Piping List (/RLL)

for

Yard & Bay (89)

and for

Fluid and utility Equipment

for the

Fluid and Utility Facilities

WP Constructora S.A. de C.V.


ArcelorMittal Lazaro Cardenas

00 First issue 17/09/19 JLG AGA


Rev. Modification contents Date Made by Checked by

Mandator Contract No

C.7WY0 Project AM LC Date Name

Made by 02/09/19 JLG


IH Plant Fluid and Utility Facilities Checked by 12/09/19 AGA
Approved by 17/09/19 AGA
89 Area YARD & BAY SYSTEMS CM Eng. DE Secl. CU

Equipment Lang. EN Size Sheet No. Sheets

Material

SubGroup Mass Unit

Scale1 Scale2

SupplyGrp SAP Document No.

Consortial Partner

Partno Consortial Partner No.

Sub

RLL DocType Piping List Sub No.

Corresponding Doc.

001 CountNo Customer No.

Doc Title Piping List - Area Yard & Bay IH89 Substitute for

Replaced by

PT No: Rev: Page:


C_7WY0_IH_89-F/RLL001 00 1/21
Das vorliegende Dokument stellt das geistige Eigentum der jeweiligen Landesgesellschaft The content of the present document is subject to intellectual property rights of the respective
von Primetals Technologies dar und ist vertraulich. Die nicht Primetals Technologies Legal Entity and is confidential. The
genehmigte Verwendung oder Veröffentlichung sowie die zweckentfremdete Verwendung ist nicht unauthorized use or disclosure of this document or its use contrary to its intended purpose is
gestattet und wird rechtlich verfolgt. not permitted and shall be prosecuted.

7WY
AM Lazaro

LINE SCHEDULE
Area
IH89 YARD&BAY
Operating Design Test Insulation Processfluid
Piping Piping route Paint
Area Line-no. DN TRS Press. Temp Press. Temp Press. Thick. Remarks
Spec from to Fl. Cl. T. Cl. Con. Code
bar °C bar °C bar mm
IH89 IW-1010 80 D125J WPT-IW-0001 811 7.00 35.00 10.00 70.00 15.00 W 10 L IW
HEADER IW-1010
IH89 IW-1010 65 D125J HEADER IW-1010 811 7.00 35.00 10.00 70.00 15.00 W 10 L IW
SUPPLY HEAD TO ICP
IH89 IW-1020 40 D125J SUPPLY HEAD TO ICP 811 7.00 35.00 10.00 70.00 15.00 W 10 L IW
RH AREA SERVICE STATION
IH89 IW-1030 40 D125J SUPPLY HEAD TO ICP 811 7.00 35.00 10.00 70.00 15.00 W 10 L IW
RM AREA SERVICE STATION
IH89 IW-1040 40 D125J SUPPLY HEAD TO ICP 811 7.00 35.00 10.00 70.00 15.00 W 10 L IW
FM AREA SERVICE STATION
IH89 IW-1050 40 D125J SUPPLY HEAD TO ICP 811 7.00 35.00 10.00 70.00 15.00 W 10 L IW
DC AREA SERVICE STATION
IH89 IW-1060 40 D125J SUPPLY HEAD TO ICP 811 7.00 35.00 10.00 70.00 15.00 W 10 L IW
HSPM AREA SERVICE STATION
IH89 IW-1070 40 D125J SUPPLY HEAD TO ICP 811 7.00 35.00 10.00 70.00 15.00 W 10 L IW
HSPM AREA SERVICE STATION
IH89 IW-1080 40 D125J SUPPLY HEAD TO ICP 811 7.00 35.00 10.00 70.00 15.00 W 10 L IW
HSPM AREA SERVICE STATION

- all pressures are gauge pressures


Benennung / Title
LINE SCHEDULE
Job ID
Datum/Date Bearb./Prepared by Datum/Date Geprueft/Checked by Dok.Nr. / Doc.No. Blatt/Sheet von/of Rev.

28-08-19 AGA - - - 02/21 -


Das vorliegende Dokument stellt das geistige Eigentum der jeweiligen Landesgesellschaft The content of the present document is subject to intellectual property rights of the respective
von Primetals Technologies dar und ist vertraulich. Die nicht Primetals Technologies Legal Entity and is confidential. The
genehmigte Verwendung oder Veröffentlichung sowie die zweckentfremdete Verwendung ist nicht unauthorized use or disclosure of this document or its use contrary to its intended purpose is
gestattet und wird rechtlich verfolgt. not permitted and shall be prosecuted.

7WY
AM Lazaro

LINE SCHEDULE
Area
IH89 YARD&BAY
Operating Design Test Insulation Processfluid
Piping Piping route Paint
Area Line-no. DN TRS Press. Temp Press. Temp Press. Thick. Remarks
Spec from to Fl. Cl. T. Cl. Con. Code
bar °C bar °C bar mm
IH89 PW-1001 50 W150J HEADER PW-1001 812 6.00 37.00 7.00 60.00 10.50 W L PW
SUPPLY HEAD TO ICP
IH89 PW-1010 25 W150J HEADER IW-1001 812 6.00 37.00 7.00 60.00 10.50 W L PW
B05-E-BUILDING FM
IH89 PW-1070 50 W150J HEADER PW-1001 812 6.00 37.00 7.00 60.00 10.50 W L PW
WORK ROLL GRINDER
IH89 PW-1001 80 W150J HEADER PW-1001 812 6.00 37.00 7.00 60.00 10.50 W L PW
SUPPLY HEAD TO ICP
IH89 PW-1080 50 W150J HEADER PW-1001 812 6.00 37.00 7.00 60.00 10.50 W L PW
B13-ROLL SHOP
IH89 PW-1100 50 W150J HEADER PW-1001 812 6.00 37.00 7.00 60.00 10.50 W L PW
WORK ROLL GRINDER
IH89 PW-1110 40 W150J HEADER PW-1001 812 6.00 37.00 7.00 60.00 10.50 W L PW
HIGH PRESSURE CLEANER
IH89 PW-1120 50 W150J HEADER PW-1001 812 6.00 37.00 7.00 60.00 10.50 W L PW
BUR GRINDER
IH89 PW-1130 50 W150J HEADER PW-1001 812 6.00 37.00 7.00 60.00 10.50 W L PW
BUR GRINDER
IH89 PW-1140 50 W150J HEADER PW-1001 812 6.00 37.00 7.00 60.00 10.50 W L PW
WASHING MACHINE
IH89 PW-1150 40 W150J HEADER PW-1001 812 6.00 37.00 7.00 60.00 10.50 W L PW
SHEAREBLADE GRIDER
IH89 PW-1170 25 W150J HEADER PW-1001 812 6.00 37.00 7.00 60.00 10.50 W L PW
B02-RM MAIN PULPIT
IH89 PW-1180 50 W150J HEADER PW-1001 812 6.00 37.00 7.00 60.00 10.50 W L PW
WORK ROLL GRINDER
IH89 PW-1190 25 W150J HEADER PW-1001 812 6.00 37.00 7.00 60.00 10.50 W L PW
B01 SUPPLY PULPIT SLAB L.
- all pressures are gauge pressures
Benennung / Title
LINE SCHEDULE
Job ID
Datum/Date Bearb./Prepared by Datum/Date Geprueft/Checked by Dok.Nr. / Doc.No. Blatt/Sheet von/of Rev.

28-08-19 AGA - - - 03/21 -


Das vorliegende Dokument stellt das geistige Eigentum der jeweiligen Landesgesellschaft The content of the present document is subject to intellectual property rights of the respective
von Primetals Technologies dar und ist vertraulich. Die nicht Primetals Technologies Legal Entity and is confidential. The
genehmigte Verwendung oder Veröffentlichung sowie die zweckentfremdete Verwendung ist nicht unauthorized use or disclosure of this document or its use contrary to its intended purpose is
gestattet und wird rechtlich verfolgt. not permitted and shall be prosecuted.

7WY
AM Lazaro

LINE SCHEDULE
Area
IH89 YARD&BAY
Operating Design Test Insulation Processfluid
Piping Piping route Paint
Area Line-no. DN TRS Press. Temp Press. Temp Press. Thick. Remarks
Spec from to Fl. Cl. T. Cl. Con. Code
bar °C bar °C bar mm
IH89 PW-1001 100 W150J HEADER PW-0001 812 6.00 37.00 7.00 60.00 10.50 W L PW
SUPPLY HEAD TO ICP
IH89 PW-1160 25 W150J HEADER IW-1010 812 6.00 37.00 7.00 60.00 10.50 W L PW
B07-FM M PULPIT & OFFICE
IH89 PW-1060 50 W150J HEADER PW-1001 812 6.00 37.00 7.00 60.00 10.50 W L PW
WORK ROLL GRINDER
IH89 PW-1001 80 W150J HEADER PW-1001 812 6.00 37.00 7.00 60.00 10.50 W L PW
SUPPLY HEAD TO ICP
IH89 PW-1020 25 W150J SUPPLY HEAD TO ICP 812 6.00 37.00 7.00 60.00 10.50 W L PW
B8-E-BUILDING DOWNCOLLER
IH89 PW-1040 25 W150J SUPPLY HEAD TO ICP 812 6.00 37.00 7.00 60.00 10.50 W L PW
B09-DC MAIN PULPIT
IH89 PW-1050 25 W150J HEADER PW-1001 812 6.00 37.00 7.00 60.00 10.50 W L PW
B11-E-BUILDING HSPM
IH89 PW-0001 100 W150J WPT-PW-0001 812 6.00 37.00 7.00 60.00 10.50 W L PW
HEADER PW-1010
IH89 PW-1030 32 W150J SUPPLY HEAD TO ICP 812 6.00 37.00 7.00 60.00 10.50 W L PW
B18-SAMPLE&TESTING A-LAB

- all pressures are gauge pressures


Benennung / Title
LINE SCHEDULE
Job ID
Datum/Date Bearb./Prepared by Datum/Date Geprueft/Checked by Dok.Nr. / Doc.No. Blatt/Sheet von/of Rev.

28-08-19 AGA - - - 04/21 -


Das vorliegende Dokument stellt das geistige Eigentum der jeweiligen Landesgesellschaft The content of the present document is subject to intellectual property rights of the respective
von Primetals Technologies dar und ist vertraulich. Die nicht Primetals Technologies Legal Entity and is confidential. The
genehmigte Verwendung oder Veröffentlichung sowie die zweckentfremdete Verwendung ist nicht unauthorized use or disclosure of this document or its use contrary to its intended purpose is
gestattet und wird rechtlich verfolgt. not permitted and shall be prosecuted.

7WY
AM Lazaro

LINE SCHEDULE
Area
IH89 YARD&BAY
Operating Design Test Insulation Processfluid
Piping Piping route Paint
Area Line-no. DN TRS Press. Temp Press. Temp Press. Thick. Remarks
Spec from to Fl. Cl. T. Cl. Con. Code
bar °C bar °C bar mm
IH89 SW-1001 150 D125J WPT-IW-0001 815 8.00 37.00 9.00 60.00 13.50 W L SW
HEADER IW-1010
IH89 SW-0001 80 D125J HEADER IW-1010 815 8.00 37.00 9.00 60.00 13.50 W L SW
SUPPLY HEAD TO ICP
IH89 SW-1020 80 D125J SUPPLY HEAD TO ICP 815 8.00 37.00 9.00 60.00 13.50 W L SW
RH AREA SERVICE STATION
IH89 SW-1030 25 D125J SUPPLY HEAD TO ICP 815 8.00 37.00 9.00 60.00 13.50 W L SW
RM AREA SERVICE STATION
IH89 SW-1010 50 D125J SUPPLY HEAD TO ICP 815 8.00 37.00 9.00 60.00 13.50 W L SW
FM AREA SERVICE STATION

- all pressures are gauge pressures


Benennung / Title
LINE SCHEDULE
Job ID
Datum/Date Bearb./Prepared by Datum/Date Geprueft/Checked by Dok.Nr. / Doc.No. Blatt/Sheet von/of Rev.

28-08-19 AGA - - - 05/21 -


Das vorliegende Dokument stellt das geistige Eigentum der jeweiligen Landesgesellschaft The content of the present document is subject to intellectual property rights of the respective
von Primetals Technologies dar und ist vertraulich. Die nicht Primetals Technologies Legal Entity and is confidential. The
genehmigte Verwendung oder Veröffentlichung sowie die zweckentfremdete Verwendung ist nicht unauthorized use or disclosure of this document or its use contrary to its intended purpose is
gestattet und wird rechtlich verfolgt. not permitted and shall be prosecuted.

7WY
AM Lazaro

LINE SCHEDULE
Area
IH89 YARD&BAY
Operating Design Test Insulation Processfluid
Piping Piping route Paint
Area Line-no. DN TRS Press. Temp Press. Temp Press. Thick. Remarks
Spec from to Fl. Cl. T. Cl. Con. Code
bar °C bar °C bar mm
IH89 ICW-0019 600 D125J WTP ICW-0019 8241 6.50 35.00 8.50 60.00 12.75 W 10 L ICW
SUPPLY HEAD TO ICP
IH89 ICW-0010 600 D125J WTP ICW-0010 8241 6.50 35.00 8.50 60.00 12.75 W 10 L ICW
SUPPLY HEAD TO ICP
IH89 ICW-1019 300 D125J HEADER ICW-0019 8241 6.50 35.00 8.50 60.00 12.75 W 10 L ICW
SUPPLY HEAD TO RF AREA
IH89 ICW-1010 300 D125J HEADER ICW-0010 8241 6.50 35.00 8.50 60.00 12.75 W 10 L ICW
SUPPLY HEAD TO RF AREA
IH89 ICW-1040 300 D125J HEADER ICW-1010 8241 6.50 35.00 8.50 60.00 12.75 W 10 L ICW
SUPPLY HEAD TO RF AREA
IH89 ICW-1050 300 D125J HEADER ICW-1019 8241 6.50 35.00 8.50 60.00 12.75 W 10 L ICW
SUPPLY HEAD TO RF AREA
IH89 ICW-1010 100 D125J WTP ICW-0019 8241 6.50 35.00 8.50 60.00 12.75 W 10 L ICW
SUPPLY HEAD TO ICP
IH89 ICW-1019 100 D125J WTP ICW-0010 8241 6.50 35.00 8.50 60.00 12.75 W 10 L ICW
SUPPLY HEAD TO ICP
IH89 ICW-1020 50 D125J HEADER ICW-1010 8241 6.50 35.00 8.50 60.00 12.75 W 10 L ICW
SUPPLY RF AREA
IH89 ICW-1030 50 D125J HEADER ICW-1019 8241 6.50 35.00 8.50 60.00 12.75 W 10 L ICW
SUPPLY RF AREA
IH89 ICW-1140 80 D125J HEADER ICW-1010 8241 6.50 35.00 8.50 60.00 12.75 W 10 L ICW
SUPPLY HEAD TO RF AREA
IH89 ICW-1150 80 D125J HEADER ICW-1019 8241 6.50 35.00 8.50 60.00 12.75 W 10 L ICW
SUPPLY HEAD TO RF AREA
IH89 ICW-1060 400 D125J HEADER ICW-1010 8241 6.50 35.00 8.50 60.00 12.75 W 10 L ICW
SUPPLY FM AREA
IH89 ICW-1070 400 D125J HEADER ICW-1019 8241 6.50 35.00 8.50 60.00 12.75 W 10 L ICW
SUPPLY FM AREA
- all pressures are gauge pressures
Benennung / Title
LINE SCHEDULE
Job ID
Datum/Date Bearb./Prepared by Datum/Date Geprueft/Checked by Dok.Nr. / Doc.No. Blatt/Sheet von/of Rev.

28-08-19 AGA - - - 06/21 -


Das vorliegende Dokument stellt das geistige Eigentum der jeweiligen The content of the present document is subject to intellectual property rights of the respective
Landesgesellschaft von Primetals Technologies dar und ist vertraulich. Die nicht Primetals Technologies Legal Entity and is confidential. The
genehmigte Verwendung oder Veröffentlichung sowie die zweckentfremdete Verwendung ist unauthorized use or disclosure of this document or its use contrary to its intended purpose
nicht gestattet und wird rechtlich verfolgt. is not permitted and shall be prosecuted.

7WY
AM Lazaro

LINE SCHEDULE
Area
IH89 YARD&BAY
Operating Design Test Insulation Processfluid
Piping Piping route Paint
Area Line-no. DN TRS Press. Temp Press. Temp Press. Thick. Remarks
Spec from to Fl. Cl. T. Cl. Con. Code
bar °C bar °C bar mm
IH89 ICW-1080 25 D125J HEADER ICW-1019 8241 6.50 35.00 8.50 60.00 12.75 W 10 L ICW
SUPPLY ROT AREA
IH89 ICW-1090 25 D125J HEADER ICW-1010 8241 6.50 35.00 8.50 60.00 12.75 W 10 L ICW
SUPPLY ROT AREA
IH89 ICW-1100 25 D125J HEADER ICW-1019 8241 6.50 35.00 8.50 60.00 12.75 W 10 L ICW
SUPPLY ROT AREA
IH89 ICW-1110 25 D125J HEADER ICW-1010 8241 6.50 35.00 8.50 60.00 12.75 W 10 L ICW
SUPPLY ROT AREA
IH89 ICW-1120 200 D125J HEADER ICW-1019 8241 6.50 35.00 8.50 60.00 12.75 W 10 L ICW
SUPPLY DC AREA
IH89 ICW-1130 200 D125J HEADER ICW-1010 8241 6.50 35.00 8.50 60.00 12.75 W 10 L ICW
SUPPLY DC AREA
IH89 ICW-1160 25 D125J HEADER ICW-1019 8241 6.50 35.00 8.50 60.00 12.75 W 10 L ICW
SUPPLY LABORATORY AREA
IH89 ICW-1170 25 D125J HEADER ICW-1010 8241 6.50 35.00 8.50 60.00 12.75 W 10 L ICW
SUPPLY LABORATORY AREA
IH89 ICW-1180 200 D125J HEADER ICW-1019 8241 6.50 35.00 8.50 60.00 12.75 W 10 L ICW
SUPPLY HSPM AREA
IH89 ICW-1190 200 D125J HEADER ICW-1010 8241 6.50 35.00 8.50 60.00 12.75 W 10 L ICW
SUPPLY HSPM AREA
IH89 ICW-1200 100 D125J HEADER ICW-1019 8241 6.50 35.00 8.50 60.00 12.75 W 10 L ICW
SUPPLY HSPM AREA
IH89 ICW-1210 100 D125J HEADER ICW-1010 8241 6.50 35.00 8.50 60.00 12.75 W 10 L ICW
SUPPLY HSPM AREA

- all pressures are gauge pressures


Benennung / Title
LINE SCHEDULE
Job ID
Datum/Date Bearb./Prepared by Datum/Date Geprueft/Checked by Dok.Nr. / Doc.No. Blatt/Sheet von/of Rev.

28-08-19 AGA - - - 07/21 -


Das vorliegende Dokument stellt das geistige Eigentum der jeweiligen Landesgesellschaft The content of the present document is subject to intellectual property rights of the respective
von Primetals Technologies dar und ist vertraulich. Die nicht Primetals Technologies Legal Entity and is confidential. The
genehmigte Verwendung oder Veröffentlichung sowie die zweckentfremdete Verwendung ist unauthorized use or disclosure of this document or its use contrary to its intended purpose is
nicht gestattet und wird rechtlich verfolgt. not permitted and shall be prosecuted.

7WY
AM Lazaro

LINE SCHEDULE
Area
IH89 YARD&BAY
Operating Design Test Insulation Processfluid
Piping Piping route Paint
Area Line-no. DN TRS Press. Temp Press. Temp Press. Thick. Remarks
Spec from to Fl. Cl. T. Cl. Con. Code
bar °C bar °C bar mm
IH89 FCW-0001 350 D150PJ REHEATING FURNACE 8242 6.00 92.00 7.00 100.00 10.50 W 10 L FCW
COOLER IH.82.42-FHE1
IH89 FCW-0020 350 D150PJ IH.82.42-FPU2 8242 6.00 92.00 7.00 100.00 10.50 W 10 L FCW
REHEATING FURNACE
IH89 FCW-0023 300 D150PJ EMERGENCY WATER TANK 8242 6.00 92.00 7.00 100.00 10.50 W 10 L FCW
HEADER FCW-0020
IH89 FCW-0025 300 D150PJ HEADER FCW-0001 8242 6.00 92.00 7.00 100.00 10.50 W 10 L FCW
SOFT WATER BASIN
IH89 FCW-0026 150 D150PJ EMERGENCY WATER TANK 8242 6.00 92.00 7.00 100.00 10.50 W 10 L FCW
HEADER FCW-0025
IH89 FCW-0027 100 D150PJ EMERGENCY WATER TANK 8242 6.00 92.00 7.00 100.00 10.50 W 10 L FCW
HEADER FCW-0001
IH89 FCW-1010 350 D150PJ FCW-0001 8242 6.00 92.00 7.00 100.00 10.50 W 10 L FCW
OPEN END
IH89 FCW-1020 350 D150PJ FCW-0020 8242 6.00 92.00 7.00 100.00 10.50 W 10 L FCW
OPEN END

- all pressures are gauge pressures


Benennung / Title
LINE SCHEDULE
Job ID
Datum/Date Bearb./Prepared by Datum/Date Geprueft/Checked by Dok.Nr. / Doc.No. Blatt/Sheet von/of Rev.

28-08-19 AGA - - - 08/21 -


Das vorliegende Dokument stellt das geistige Eigentum der jeweiligen Landesgesellschaft The content of the present document is subject to intellectual property rights of the respective
von Primetals Technologies dar und ist vertraulich. Die nicht Primetals Technologies Legal Entity and is confidential. The
genehmigte Verwendung oder Veröffentlichung sowie die zweckentfremdete Verwendung ist nicht unauthorized use or disclosure of this document or its use contrary to its intended purpose is
gestattet und wird rechtlich verfolgt. not permitted and shall be prosecuted.

7WY
AM Lazaro

LINE SCHEDULE
Area
IH89 YARD&BAY
Operating Design Test Insulation Processfluid
Piping Piping route Paint
Area Line-no. DN TRS Press. Temp Press. Temp Press. Thick. Remarks
Spec from to Fl. Cl. T. Cl. Con. Code
bar °C bar °C bar mm
IH89 DWL-0010 700 D125J WTP DWL-0010 8243-1 5.00 35.00 7.50 60.00 11.25 W 10 L DWL
SUPPLY HEAD TO ICP
IH89 DWL-1010 500 D125J HEADER DWL-0010 8243-1 5.00 35.00 7.50 60.00 11.25 W 10 L DWL
DWL-1030
IH89 DWL-1030 250 D125J HEADER DWL-0010 8243-1 5.00 35.00 7.50 60.00 11.25 W 10 L DWL
FURNACE DISCHARGING
IH89 DWL-1040 400 D125J HEADER DWL-1010 8243-1 5.00 35.00 7.50 60.00 11.25 W 10 L DWL
DESCALING SYSTEM
IH89 DWL-1020 150 D125J HEADER DWL-1010 8243-1 5.00 35.00 7.50 60.00 11.25 W 10 L DWL
SLAB LOADING & CHARGING TABLE
IH89 DWL-1050 400 D125J HEADER DWL-1010 8243-1 5.00 35.00 7.50 60.00 11.25 W 10 L DWL
FINISHING MILL AREA
IH89 DWL-1060 200 D125J HEADER DWL-1010 8243-1 5.00 35.00 7.50 60.00 11.25 W 10 L DWL
ROLL COOLING AREA
IH89 DWL-1070 300 D125J HEADER DWL-1010 8243-1 5.00 35.00 7.50 60.00 11.25 W 10 L DWL
DOWN COOLER AREA

- all pressures are gauge pressures


Benennung / Title
LINE SCHEDULE
Job ID
Datum/Date Bearb./Prepared by Datum/Date Geprueft/Checked by Dok.Nr. / Doc.No. Blatt/Sheet von/of Rev.

28-08-19 AGA - - - 09/21 -


Das vorliegende Dokument stellt das geistige Eigentum der jeweiligen Landesgesellschaft The content of the present document is subject to intellectual property rights of the respective
von Primetals Technologies dar und ist vertraulich. Die nicht Primetals Technologies Legal Entity and is confidential. The
genehmigte Verwendung oder Veröffentlichung sowie die zweckentfremdete Verwendung ist nicht unauthorized use or disclosure of this document or its use contrary to its intended purpose is
gestattet und wird rechtlich verfolgt. not permitted and shall be prosecuted.

7WY
AM Lazaro

LINE SCHEDULE
Area
IH89 YARD&BAY
Operating Design Test Insulation Processfluid
Piping Piping route Paint
Area Line-no. DN TRS Press. Temp Press. Temp Press. Thick. Remarks
Spec from to Fl. Cl. T. Cl. Con. Code
bar °C bar °C bar mm
IH89 DWH-0010 1000 D150J WTP DWL-0010 8243-2 14.00 35.00 16.00 60.00 24.00 W 10 L DWH
SUPPLY HEAD TO ICP
IH89 DWH-1010 1000 D150J DWL-0010 8243-2 14.00 35.00 16.00 60.00 24.00 W 10 L DWH
SUPPLY HEAD TO ICP
IH89 DWH-1020 300 D150J WTP DWL-0010 8243-2 14.00 35.00 16.00 60.00 24.00 W 10 L DWH
RM SERVICES
IH89 DWH-1030 1000 D150J WTP DWL-0010 8243-2 14.00 35.00 16.00 60.00 24.00 W 10 L DWH
FM SERVICES
IH89 DWH-1040 100 D150J WTP DWL-0010 8243-2 14.00 35.00 16.00 60.00 24.00 W 10 L DWH
DC SERVICES

- all pressures are gauge pressures


Benennung / Title
LINE SCHEDULE
Job ID
Datum/Date Bearb./Prepared by Datum/Date Geprueft/Checked by Dok.Nr. / Doc.No. Blatt/Sheet von/of Rev.

28-08-19 CAAT - - - 10/21 -


Das vorliegende Dokument stellt das geistige Eigentum der jeweiligen Landesgesellschaft The content of the present document is subject to intellectual property rights of the respective
von Primetals Technologies dar und ist vertraulich. Die nicht Primetals Technologies Legal Entity and is confidential. The
genehmigte Verwendung oder Veröffentlichung sowie die zweckentfremdete Verwendung ist nicht unauthorized use or disclosure of this document or its use contrary to its intended purpose is
gestattet und wird rechtlich verfolgt. not permitted and shall be prosecuted.

7WY
AM Lazaro

LINE SCHEDULE
Area
IH89 YARD&BAY
Operating Design Test Insulation Processfluid
Piping Piping route Paint
Area Line-no. DN TRS Press. Temp Press. Temp Press. Thick. Remarks
Spec from to Fl. Cl. T. Cl. Con. Code
bar °C bar °C bar mm
IH89 FW-1030 300 D125J PUMPS-9014 8243-3 3.50 41.00 5.00 60.00 7.50 W 10 L FW
FW-1030
IH89 FW-1020 300 D125J FW-1030 8243-3 3.50 41.00 5.00 60.00 7.50 W 10 L FW
FLUME
IH89 FW-1010 300 D125J WTP FW-1008 8243-3 3.50 41.00 5.00 60.00 7.50 W 10 L FW
RM SERVICES
IH89 FW-0008 300 D125J WTP FW-1008 8243-3 3.50 41.00 5.00 60.00 7.50 W 10 L FW
CLARIFIER

- all pressures are gauge pressures


Benennung / Title
LINE SCHEDULE
Job ID
Datum/Date Bearb./Prepared by Datum/Date Geprueft/Checked by Dok.Nr. / Doc.No. Blatt/Sheet von/of Rev.

28-08-19 CAAT - - - 11/21 -


Das vorliegende Dokument stellt das geistige Eigentum der jeweiligen Landesgesellschaft The content of the present document is subject to intellectual property rights of the respective
von Primetals Technologies dar und ist vertraulich. Die nicht Primetals Technologies Legal Entity and is confidential. The
genehmigte Verwendung oder Veröffentlichung sowie die zweckentfremdete Verwendung ist nicht unauthorized use or disclosure of this document or its use contrary to its intended purpose is
gestattet und wird rechtlich verfolgt. not permitted and shall be prosecuted.

7WY
AM Lazaro

LINE SCHEDULE
Area
IH89 YARD&BAY
Operating Design Test Insulation Processfluid
Piping Piping route Paint
Area Line-no. DN TRS Press. Temp Press. Temp Press. Thick. Remarks
Spec from to Fl. Cl. T. Cl. Con. Code
bar °C bar °C bar mm
IH89 LCW-0010 1000 D125J WTP LCW-0010 8244-1 1.80 35.00 4.00 60.00 6.00 W 10 L LCW
LCW-1010
IH89 LCW-1010 1000 D125J HEADER LCW-0010 8244-1 1.80 35.00 4.00 60.00 6.00 W 10 L LCW
LCW-1020
IH89 LCW-1020 1000 D125J HEADER DWL-0010 8244-1 1.80 35.00 4.00 60.00 6.00 W 10 L LCW
WATER TANK
IH89 LCW-0034 1000 D125J WTP LCW-0034 8244-1 1.80 35.00 4.00 60.00 6.00 W 10 L LCW
LCW-1032
IH89 LCW-1034 1000 D125J COOLING TOWER 8244-1 1.80 35.00 4.00 60.00 6.00 W 10 L LCW
STRIP COOLING BASIN
IH89 LCW-0023 1000 D125J STRIP COOLING BASIN 8244-1 2.50 46.00 4.00 60.00 6.00 W 10 L LCW
LSW-0007
IH89 LSW-007 800 D125J LCW-0023 8244-1 2.50 46.00 4.00 60.00 6.00 W 10 L LSW
LSW-1010
IH89 LSW-1010 800 D125J LSW-1010 8244-1 2.50 46.00 4.00 60.00 6.00 W 10 L LSW
WATER TANK

- all pressures are gauge pressures


Benennung / Title
LINE SCHEDULE
Job ID
Datum/Date Bearb./Prepared by Datum/Date Geprueft/Checked by Dok.Nr. / Doc.No. Blatt/Sheet von/of Rev.

28-08-19 CAAT - - - 12/21 -


Das vorliegende Dokument stellt das geistige Eigentum der jeweiligen Landesgesellschaft The content of the present document is subject to intellectual property rights of the respective
von Primetals Technologies dar und ist vertraulich. Die nicht Primetals Technologies Legal Entity and is confidential. The
genehmigte Verwendung oder Veröffentlichung sowie die zweckentfremdete Verwendung ist nicht unauthorized use or disclosure of this document or its use contrary to its intended purpose
gestattet und wird rechtlich verfolgt. is not permitted and shall be prosecuted.

7WY
AM Lazaro

LINE SCHEDULE
Area
IH89 YARD&BAY
Operating Design Test Insulation Processfluid
Piping Piping route Paint
Area Line-no. DN TRS Press. Temp Press. Temp Press. Thick. Remarks
Spec from to Fl. Cl. T. Cl. Con. Code
bar °C bar °C bar mm
IH89 BA-0005 200 D150N BA-0005 8244-2 0.80 50.00 1.50 80.00 1.65 AIR 10 G BA
WTP SAND FILTERS
IH89 BW-0022 350 D125J BW-0022 8244-2 2.00 35.00 5.00 60.00 7.50 W 10 L BW
WTP SAND FILTERS
IH89 BWW-0003 350 D125J BWW-0003 8244-2 35.00 5.00 60.00 0.00 NO 10 L BWW
WTP SAND FILTERS
IH89 IWW-0100 100 D125J IWW-0100 8244-2 40.00 10.00 60.00 0.00 NO 10 L IWW
WTP SAND FILTERS

- all pressures are gauge pressures


Benennung / Title
LINE SCHEDULE
Job ID
Datum/Date Bearb./Prepared by Datum/Date Geprueft/Checked by Dok.Nr. / Doc.No. Blatt/Sheet von/of Rev.

28-08-19 AGA - - - 13/21 -


Das vorliegende Dokument stellt das geistige Eigentum der jeweiligen Landesgesellschaft The content of the present document is subject to intellectual property rights of the respective
von Primetals Technologies dar und ist vertraulich. Die nicht Primetals Technologies Legal Entity and is confidential. The
genehmigte Verwendung oder Veröffentlichung sowie die zweckentfremdete Verwendung ist nicht unauthorized use or disclosure of this document or its use contrary to its intended purpose
gestattet und wird rechtlich verfolgt. is not permitted and shall be prosecuted.

7WY
AM Lazaro

LINE SCHEDULE
Area
IH89 YARD&BAY
Operating Design Test Insulation Processfluid
Piping Piping route Paint
Area Line-no. DN TRS Press. Temp Press. Temp Press. Thick. Remarks
Spec from to Fl. Cl. T. Cl. Con. Code
bar °C bar °C bar mm
IH89 OX-1001 50 D150X TOP 3 50-LO-766-600 831 14.00 40.00 17.00 45.00 18.70 NI G OX
HEAD OX-1001
IH89 OX-1010 25 D150X HEAD OX-1001 831 14.00 40.00 17.00 45.00 18.70 NI G OX
ROLL HEAT UP
IH89 OX-1020 25 D150X HEAD OX-1001 HSM 831 14.00 40.00 17.00 45.00 18.70 NI G OX
SERVICE DROP EMERG. CUTTING
IH89 OX-1030 25 D150X HEAD OX-1001 HSM 831 14.00 40.00 17.00 45.00 18.70 NI G OX
SERVICE DROP EMERG. CUTTING
IH89 OX-1040 25 D150X HEAD OX-1001 HSM 831 14.00 40.00 17.00 45.00 18.70 NI G OX
SERVICE DROP EMERG. CUTTING
IH89 OX-1050 25 D150X HEAD OX-1001 HSM 831 14.00 40.00 17.00 45.00 18.70 NI G OX
SERVICE DROP EMERG. CUTTING
IH89 OX-1060 25 D150X HEAD OX-1001 HSM 831 14.00 40.00 17.00 45.00 18.70 NI G OX
SERVICE DROP EMERG. CUTTING
IH89 OX-1070 25 D150X HEAD OX-1001 HSM 831 14.00 40.00 17.00 45.00 18.70 NI G OX
SERVICE DROP EMERG. CUTTING
IH89 OX-1080 25 D150X HEAD OX-1001 HSM 831 14.00 40.00 17.00 45.00 18.70 NI G OX
SERVICE DROP EMERG. CUTTING
IH89 OX-1090 25 D150X HEAD OX-1001 HSM 831 14.00 40.00 17.00 45.00 18.70 NI G OX
SERVICE DROP EMERG. CUTTING
IH89 OX-1100 25 D150X HEAD OX-1001 HSPM 831 14.00 40.00 17.00 45.00 18.70 NI G OX
SERVICE DROP EMERG. CUTTING
IH89 OX-1110 25 D150X HEAD OX-1001 HSPM 831 14.00 40.00 17.00 45.00 18.70 NI G OX
SERVICE DROP EMERG. CUTTING

- all pressures are gauge pressures


Benennung / Title
LINE SCHEDULE
Job ID
Datum/Date Bearb./Prepared by Datum/Date Geprueft/Checked by Dok.Nr. / Doc.No. Blatt/Sheet von/of Rev.

28-08-19 AGA - - - 14/21 -


Das vorliegende Dokument stellt das geistige Eigentum der jeweiligen The content of the present document is subject to intellectual property rights of the respective
Landesgesellschaft von Primetals Technologies dar und ist vertraulich. Die nicht Primetals Technologies Legal Entity and is confidential. The
genehmigte Verwendung oder Veröffentlichung sowie die zweckentfremdete Verwendung ist unauthorized use or disclosure of this document or its use contrary to its intended purpose
nicht gestattet und wird rechtlich verfolgt. is not permitted and shall be prosecuted.

7WY
AM Lazaro

LINE SCHEDULE
Area
IH89 YARD&BAY
Operating Design Test Insulation Processfluid
Piping Piping route Paint
Area Line-no. DN TRS Press. Temp Press. Temp Press. Thick. Remarks
Spec from to Fl. Cl. T. Cl. Con. Code
bar °C bar °C bar mm
IH89 NI-1001 65 D150N TOP 3 65-N-767-600 832 8.00 40.00 10.00 45.00 11.00 NI G NI
HEAD NI-1001
IH89 NI-1001 50 D150N HEADER NI-1001 832 8.00 40.00 10.00 45.00 11.00 NI G NI
NI-1020
IH89 NI-1010 50 D150N HEADER NI-1001 832 8.00 40.00 10.00 45.00 11.00 NI G NI
FURNACE PURGING
IH89 NI-1020 50 D150N HEADER NI-1001 832 8.00 40.00 10.00 45.00 11.00 NI G NI
ROLL SHOP PURGING

- all pressures are gauge pressures


Benennung / Title
LINE SCHEDULE
Job ID
Datum/Date Bearb./Prepared by Datum/Date Geprueft/Checked by Dok.Nr. / Doc.No. Blatt/Sheet von/of Rev.

28-08-19 AGA - - - 15/21 -


Das vorliegende Dokument stellt das geistige Eigentum der jeweiligen The content of the present document is subject to intellectual property rights of the respective
Landesgesellschaft von Primetals Technologies dar und ist vertraulich. Die nicht Primetals Technologies Legal Entity and is confidential. The
genehmigte Verwendung oder Veröffentlichung sowie die zweckentfremdete Verwendung ist unauthorized use or disclosure of this document or its use contrary to its intended purpose
nicht gestattet und wird rechtlich verfolgt. is not permitted and shall be prosecuted.

7WY
AM Lazaro

LINE SCHEDULE
Area
IH89 YARD&BAY
Operating Design Test Insulation Processfluid
Piping Piping route Paint
Area Line-no. DN TRS Press. Temp Press. Temp Press. Thick. Remarks
Spec from to Fl. Cl. T. Cl. Con. Code
bar °C bar °C bar mm
IH89 CA-0002 150 D150N TOP 1 CA-0002 834 7.00 40.00 10.00 60.00 11.00 AIR 10 G CA
HEAD CA-0002
IH89 CA-1002 50 D150N HEAD CA-0002 834 7.00 40.00 10.00 60.00 11.00 AIR 10 G CA
HEAD ROLL SHOP
IH89 CA-1010 50 D150N HEAD CA-1002 834 7.00 40.00 10.00 60.00 11.00 AIR 10 G CA
HSM PNEUMATIC SYSTEMS
IH89 CA-1110 25 D150N HEAD CA-1002 834 7.00 40.00 10.00 60.00 11.00 AIR 10 G CA
FM SERVICE DROP
IH89 CA-1100 50 D150N HEADER CA-1002 834 7.00 40.00 10.00 60.00 11.00 AIR 10 G CA
FM MEASUREMENT DEVICES
IH89 CA-1090 32 D150N HEADER CA-1002 834 7.00 40.00 10.00 60.00 11.00 AIR 10 G CA
FM PNEUMATIC SYSTEMS
IH89 CA-1080 25 D150N HEADER CA-0002 834 7.00 40.00 10.00 60.00 11.00 AIR 10 G CA
HSM SERVICE DROP
IH89 CA-1020 25 D150N HEADER CA-1002 834 7.00 40.00 10.00 60.00 11.00 AIR 10 G CA
ROLL SHOP SERVICE DROP
IH89 CA-1030 25 D150N HEADER CA-1002 834 7.00 40.00 10.00 60.00 11.00 AIR 10 G CA
ROLL SHOP SERVICE DROP
IH89 CA-1035 25 D150N HEADER CA-1002 834 7.00 40.00 10.00 60.00 11.00 AIR 10 G CA
ROLL SHOP SERVICE DROP
IH89 CA-1040 25 D150N HEADER CA-1002 834 7.00 40.00 10.00 60.00 11.00 AIR 10 G CA
ROLL SHOP SERVICE DROP
IH89 CA-1045 25 D150N HEADER CA-1002 834 7.00 40.00 10.00 60.00 11.00 AIR 10 G CA
ROLL SHOP SERVICE DROP
IH89 CA-1055 25 D150N HEADER CA-1002 834 7.00 40.00 10.00 60.00 11.00 AIR 10 G CA
ROLL SHOP SERVICE DROP
IH89 CA-1060 25 D150N HEADER CA-1002 834 7.00 40.00 10.00 60.00 11.00 AIR 10 G CA
ROLL SHOP SERVICE DROP
- all pressures are gauge pressures
Benennung / Title
LINE SCHEDULE
Job ID
Datum/Date Bearb./Prepared by Datum/Date Geprueft/Checked by Dok.Nr. / Doc.No. Blatt/Sheet von/of Rev.

28-08-19 AGA - - - 16/21 -


Das vorliegende Dokument stellt das geistige Eigentum der jeweiligen The content of the present document is subject to intellectual property rights of the respective
Landesgesellschaft von Primetals Technologies dar und ist vertraulich. Die nicht Primetals Technologies Legal Entity and is confidential. The
genehmigte Verwendung oder Veröffentlichung sowie die zweckentfremdete Verwendung ist unauthorized use or disclosure of this document or its use contrary to its intended purpose
nicht gestattet und wird rechtlich verfolgt. is not permitted and shall be prosecuted.

7WY
AM Lazaro

LINE SCHEDULE
Area
IH89 YARD&BAY
Operating Design Test Insulation Processfluid
Piping Piping route Paint
Area Line-no. DN TRS Press. Temp Press. Temp Press. Thick. Remarks
Spec from to Fl. Cl. T. Cl. Con. Code
bar °C bar °C bar mm
IH89 CA-1070 25 D150N HEADER CA-1002 834 7.00 40.00 10.00 60.00 11.00 AIR 10 G CA
ROLL SHOP SERVICE DROP
IH89 CA-1120 65 D150N HEADER CA-1002 834 7.00 40.00 10.00 60.00 11.00 AIR 10 G CA
ROT PNEUMATIC SYSTEMS
IH89 CA-1130 50 D150N HEADER CA-1002 834 7.00 40.00 10.00 60.00 11.00 AIR 10 G CA
ROT SERVICE DROP
IH89 CA-1140 25 D150N HEADER CA-1002 834 7.00 40.00 10.00 60.00 11.00 AIR 10 G CA
HSM SERVICE DROP
IH89 CA-1150 25 D150N HEADER CA-1002 834 7.00 40.00 10.00 60.00 11.00 AIR 10 G CA
LABORATORY SERVICE DROP
IH89 CA-1160 25 D150N HEADER CA-1002 834 7.00 40.00 10.00 60.00 11.00 AIR 10 G CA
HSPM SERVICE DROP
IH89 CA-1170 25 D150N HEADER CA-1002 834 7.00 40.00 10.00 60.00 11.00 AIR 10 G CA
HSPM SERVICE DROP
IH89 CA-1180 65 D150N HEADER CA-1002 834 7.00 40.00 10.00 60.00 11.00 AIR 10 G CA
HSPM CONSUMERS
IH89 CA-1190 32 D150N HEADER CA-1002 834 7.00 40.00 10.00 60.00 11.00 AIR 10 G CA
HSPM DEVICE EMG
IH89 CA-1200 25 D150N HEADER CA-1002 834 7.00 40.00 10.00 60.00 11.00 AIR 10 G CA
HSPM SERVICE DROP
IH89 CA-1210 32 D150N HEADER CA-1002 834 7.00 40.00 10.00 60.00 11.00 AIR 10 G CA
HSPM DEVICE EMG
IH89 CA-1220 25 D150N HEADER CA-1002 834 7.00 40.00 10.00 60.00 11.00 AIR 10 G CA
HSPM SERVICE DROP

- all pressures are gauge pressures


Benennung / Title
LINE SCHEDULE
Job ID
Datum/Date Bearb./Prepared by Datum/Date Geprueft/Checked by Dok.Nr. / Doc.No. Blatt/Sheet von/of Rev.

28-08-19 AGA - - - 17/21 -


Das vorliegende Dokument stellt das geistige Eigentum der jeweiligen Landesgesellschaft The content of the present document is subject to intellectual property rights of the respective
von Primetals Technologies dar und ist vertraulich. Die nicht Primetals Technologies Legal Entity and is confidential. The
genehmigte Verwendung oder Veröffentlichung sowie die zweckentfremdete Verwendung ist nicht unauthorized use or disclosure of this document or its use contrary to its intended purpose
gestattet und wird rechtlich verfolgt. is not permitted and shall be prosecuted.

7WY
AM Lazaro

LINE SCHEDULE
Area
IH89 YARD&BAY
Operating Design Test Insulation Processfluid
Piping Piping route Paint
Area Line-no. DN TRS Press. Temp Press. Temp Press. Thick. Remarks
Spec from to Fl. Cl. T. Cl. Con. Code
bar °C bar °C bar mm
IH89 IA-0008 150 D150N TOP 1 IA-0008 835 7.00 40.00 10.00 80.00 11.00 AIR 10 G IA
HEAD IA-0008
IH89 IA-1008 150 D150N HEAD IA-0008 835 7.00 40.00 10.00 80.00 11.00 AIR 10 G IA
HEAD IH835
IH89 IA-1150 65 D150N HEAD IA-1008 835 7.00 40.00 10.00 80.00 11.00 AIR 10 G IA
FURNACE PNEUMATIC SYSTEMS
IH89 IA-1140 25 D150N HEAD IA-1008 835 7.00 40.00 10.00 80.00 11.00 AIR 10 G IA
FURNACE CAMERAS&A.VALVS.
IH89 IA-1310 80 D150N HEAD IA-1008 835 7.00 40.00 10.00 80.00 11.00 AIR 10 G IA
FURNACE HANDLING&INSTS.
IH89 IA-1010 50 D150N HEAD IA-1008 835 7.00 40.00 10.00 80.00 11.00 AIR 10 G IA
SAND FILTERS ACTUAT. VALVES
IH89 IA-1020 80 D150N HEADER IA-1008 835 7.00 40.00 10.00 80.00 11.00 AIR 10 G IA
ROLL SHOP HEADER IA-1008
IH89 IA-1130 25 D150N HEADER IA-1008 835 7.00 40.00 10.00 80.00 11.00 AIR 10 G IA
CAMERA WITHING BAY
IH89 IA-1120 25 D150N HEADER IA-1008 835 7.00 40.00 10.00 80.00 11.00 AIR 10 G IA
CAMERA WITHING BAY
IH89 IA-1110 25 D150N HEADER IA-1008 835 7.00 40.00 10.00 80.00 11.00 AIR 10 G IA
CAMERA WITHING BAY
IH89 IA-1100 25 D150N HEADER IA-1008 835 7.00 40.00 10.00 80.00 11.00 AIR 10 G IA
CAMERA WITHING BAY
IH89 IA-1330 50 D150N HEADER IA-1008 835 7.00 40.00 10.00 80.00 11.00 AIR 10 G IA
FURNACE HYDRAULIC ROOM
IH89 IA-1030 25 D150N HEADER IA-1008 835 7.00 40.00 10.00 80.00 11.00 AIR 10 G IA
CAMERA WITHING BAY
IH89 IA-1040 25 D150N HEADER IA-1008 835 7.00 40.00 10.00 80.00 11.00 AIR 10 G IA
ROLL SHOP WORK ROLL GRINDER
- all pressures are gauge pressures
Benennung / Title
LINE SCHEDULE
Job ID
Datum/Date Bearb./Prepared by Datum/Date Geprueft/Checked by Dok.Nr. / Doc.No. Blatt/Sheet von/of Rev.

28-08-19 AGA - - - 18/21 -


Das vorliegende Dokument stellt das geistige Eigentum der jeweiligen The content of the present document is subject to intellectual property rights of the respective
Landesgesellschaft von Primetals Technologies dar und ist vertraulich. Die nicht Primetals Technologies Legal Entity and is confidential. The
genehmigte Verwendung oder Veröffentlichung sowie die zweckentfremdete Verwendung ist unauthorized use or disclosure of this document or its use contrary to its intended purpose
nicht gestattet und wird rechtlich verfolgt. is not permitted and shall be prosecuted.

7WY
AM Lazaro

LINE SCHEDULE
Area
IH89 YARD&BAY
Operating Design Test Insulation Processfluid
Piping Piping route Paint
Area Line-no. DN TRS Press. Temp Press. Temp Press. Thick. Remarks
Spec from to Fl. Cl. T. Cl. Con. Code
bar °C bar °C bar mm
IH89 IA-1050 25 D150N HEADER IA-1008 835 7.00 40.00 10.00 80.00 11.00 AIR 10 G IA
ROLL SHOP WORK ROLL GRINDER
IH89 IA-1060 25 D150N HEADER IA-1008 835 7.00 40.00 10.00 80.00 11.00 AIR 10 G IA
ROLL SHOP WORK ROLL GRINDER
IH89 IA-1070 25 D150N HEADER IA-1008 835 7.00 40.00 10.00 80.00 11.00 AIR 10 G IA
ROLL SHOP WORK ROLL GRINDER
IH89 IA-1080 25 D150N HEADER IA-1008 835 7.00 40.00 10.00 80.00 11.00 AIR 10 G IA
ROLL SHOP BUR GRINDER
IH89 IA-1090 25 D150N HEADER IA-1008 835 7.00 40.00 10.00 80.00 11.00 AIR 10 G IA
ROLL SHOP BUR GRINDER
IH89 IA-1160 50 D150N HEAD IA-1008 835 7.00 40.00 10.00 80.00 11.00 AIR 10 G IA
ROT ACTUAT. VALVES; F. DEVICES
IH89 IA-1170 50 D150N HEAD IA-1008 835 7.00 40.00 10.00 80.00 11.00 AIR 10 G IA
ROT ACTUAT. VALVES; F. DEVICES
IH89 IA-1180 50 D150N HEAD IA-1008 835 7.00 40.00 10.00 80.00 11.00 AIR 10 G IA
ROT ACTUAT. VALVES; F. DEVICES
IH89 IA-1190 25 D150N HEAD IA-1008 835 7.00 40.00 10.00 80.00 11.00 AIR 10 G IA
DC ACTUAT. VALVES; F. DEVICES
IH89 IA-1320 25 D150N HEAD IA-1008 835 7.00 40.00 10.00 80.00 11.00 AIR 10 G IA
CH ACTUAT. VALVES; INSTS.
IH89 IA-1200 40 D150N HEAD IA-1008 835 7.00 40.00 10.00 80.00 11.00 AIR 10 G IA
LABORATORY
IH89 IA-1210 25 D150N HEADER IA-1008 835 7.00 40.00 10.00 80.00 11.00 AIR 10 G IA
CAMERA WITHING BAY
IH89 IA-1220 40 D150N HEAD IA-1008 835 7.00 40.00 10.00 80.00 11.00 AIR 10 G IA
AUTOMATIC EYE STRAPPING MACHNE
IH89 IA-1230 25 D150N HEAD IA-1008 835 7.00 40.00 10.00 80.00 11.00 AIR 10 G IA
MARKING MACHINE; P. CYLINDER
- all pressures are gauge pressures
Benennung / Title
LINE SCHEDULE
Job ID
Datum/Date Bearb./Prepared by Datum/Date Geprueft/Checked by Dok.Nr. / Doc.No. Blatt/Sheet von/of Rev.

28-08-19 AGA - - - 19/21 -


Das vorliegende Dokument stellt das geistige Eigentum der jeweiligen The content of the present document is subject to intellectual property rights of the respective
Landesgesellschaft von Primetals Technologies dar und ist vertraulich. Die nicht Primetals Technologies Legal Entity and is confidential. The
genehmigte Verwendung oder Veröffentlichung sowie die zweckentfremdete Verwendung ist unauthorized use or disclosure of this document or its use contrary to its intended purpose
nicht gestattet und wird rechtlich verfolgt. is not permitted and shall be prosecuted.

7WY
AM Lazaro

LINE SCHEDULE
Area
IH89 YARD&BAY
Operating Design Test Insulation Processfluid
Piping Piping route Paint
Area Line-no. DN TRS Press. Temp Press. Temp Press. Thick. Remarks
Spec from to Fl. Cl. T. Cl. Con. Code
bar °C bar °C bar mm
IH89 IA-1240 25 D150N HEADER IA-1008 835 7.00 40.00 10.00 80.00 11.00 AIR 10 G IA
DC CIRC. STRAPPING MACHINE
IH89 IA-1250 25 D150N HEADER IA-1008 835 7.00 40.00 10.00 80.00 11.00 AIR 10 G IA
DC CIRC. STRAPPING MACHINE
IH89 IA-1260 50 D150N HEADER IA-1008 835 7.00 40.00 10.00 80.00 11.00 AIR 10 G IA
HSPM COIL DISCHARGING
IH89 IA-1270 32 D150N HEADER IA-1008 835 7.00 40.00 10.00 80.00 11.00 AIR 10 G IA
HSPM HYDRAULIC SYSTEM
IH89 IA-1280 32 D150N HEADER IA-1008 835 7.00 40.00 10.00 80.00 11.00 AIR 10 G IA
HSPM ENTRY SECTION
IH89 IA-1290 32 D150N HEADER IA-1008 835 7.00 40.00 10.00 80.00 11.00 AIR 10 G IA
HSPM SCRAPE COPPER/P. ROLL
IH89 IA-1300 32 D150N HEADER IA-1008 835 7.00 40.00 10.00 80.00 11.00 AIR 10 G IA
HSPM EXIT SECTION

- all pressures are gauge pressures


Benennung / Title
LINE SCHEDULE
Job ID
Datum/Date Bearb./Prepared by Datum/Date Geprueft/Checked by Dok.Nr. / Doc.No. Blatt/Sheet von/of Rev.

28-08-19 AGA - - - 20/21 -


Das vorliegende Dokument stellt das geistige Eigentum der jeweiligen The content of the present document is subject to intellectual property rights of the respective
Landesgesellschaft von Primetals Technologies dar und ist vertraulich. Die nicht Primetals Technologies Legal Entity and is confidential. The
genehmigte Verwendung oder Veröffentlichung sowie die zweckentfremdete Verwendung ist unauthorized use or disclosure of this document or its use contrary to its intended purpose
nicht gestattet und wird rechtlich verfolgt. is not permitted and shall be prosecuted.

7WY
AM Lazaro

LINE SCHEDULE
Area
IH89 YARD&BAY
Operating Design Test Insulation Processfluid
Piping Piping route Paint
Area Line-no. DN TRS Press. Temp Press. Temp Press. Thick. Remarks
Spec from to Fl. Cl. T. Cl. Con. Code
bar °C bar °C bar mm
IH89 NG-1001 300 D150F TOP 3 300-NG-761-600 841 16.00 40.00 19.00 45.00 20.90 NI 10 G NG
HEADER NG-1001
IH89 NG-1010 200 D150F HEADER NG-1001 841 16.00 40.00 19.00 45.00 20.90 NI 10 G NG
FURNACE FUEL
IH89 NG-1020 50 D150F HEADER NG-1001 841 16.00 40.00 19.00 45.00 20.90 NI 10 G NG
SERVICE DROP EMERG. CUTTING
IH89 NG-1030 25 D150F THEADER NG-1001 841 16.00 40.00 19.00 45.00 20.90 NI 10 G NG
ROLL HEAT UP
IH89 NG-1040 25 D150F HEADER NG-1001 841 16.00 40.00 19.00 45.00 20.90 NI 10 G NG
SERVICE DROP EMERG. CUTTING
IH89 NG-1050 25 D150F HEADER NG-1001 841 16.00 40.00 19.00 45.00 20.90 NI 10 G NG
SERVICE DROP EMERG. CUTTING
IH89 NG-1060 25 D150F HEADER NG-1001 841 16.00 40.00 19.00 45.00 20.90 NI 10 G NG
SERVICE DROP EMERG. CUTTING
IH89 NG-1070 25 D150F HEADER NG-1001 841 16.00 40.00 19.00 45.00 20.90 NI 10 G NG
SERVICE DROP EMERG. CUTTING
IH89 NG-1080 25 D150F HEADER NG-1001 841 16.00 40.00 19.00 45.00 20.90 NI 10 G NG
SERVICE DROP EMERG. CUTTING
IH89 NG-1090 25 D150F HEADER NG-1001 841 16.00 40.00 19.00 45.00 20.90 NI 10 G NG
SERVICE DROP EMERG. CUTTING
IH89 NG-1100 25 D150F HEADER NG-1001 841 16.00 40.00 19.00 45.00 20.90 NI 10 G NG
SERVICE DROP EMERG. CUTTING
IH89 NG-1110 25 D150F HEADER NG-1001 841 16.00 40.00 19.00 45.00 20.90 NI 10 G NG
SERVICE DROP EMERG. CUTTING
IH89 NG-1120 25 D150F HEADER NG-1001 841 16.00 40.00 19.00 45.00 20.90 NI 10 G NG
SERVICE DROP EMERG. CUTTING

- all pressures are gauge pressures


Benennung / Title
LINE SCHEDULE
Job ID
Datum/Date Bearb./Prepared by Datum/Date Geprueft/Checked by Dok.Nr. / Doc.No. Blatt/Sheet von/of Rev.

28-08-19 AGA - - - 21/21 -

You might also like