BOG RATE CALCULATION

BOG CALCULATION AT ISO TANK


BOG density = 10,18 kg/m3 @ Pressure 6,3 Bar
Vol ISO Tank (100%) = 20,51 m3
Remaing LNG at ISO Tank (5%) = 1,03 m3
Remaing Volume at ISO Tank (95%) = 19,49 m3
Gas Mass = 198,44 kg
1 kg = 1,30 Sm3
Gas Volume = 257,97 Sm3
1 m3 LNG = 585,00 Sm3 Gas
Total BOG Volume = 0,44 m3
Percentage of BOG = 2,15% Per day

BOG CALCULATION AT FILLING STATION


Diameter Flex Hose = 2 inchi 0,05 m
Length of Flex Hose = 6 m

BOG density = 2,33 kg/m3 @ pressure 1,3 Bar


Vol flexible hose 6m (100%) = 0,01 m3
Gas Mass = 0,03 kg
1 kg = 1,30 Sm3
Gas Volume = 0,04 Sm3
1 m3 LNG = 585,00 Sm3 Gas
Total BOG = 0,00006 m3
Percentage of BOG = 0,00030% Per day

BOG CALCULATION AT UNLOADING STATION


Diameter Flex Hose = 2 inchi 0,05 m
Length of Flex Hose = 6 m

BOG density = 2,33 kg/m3 @ pressure 1,3 Bar


Vol flexible hose 6m (100%) = 0,01 m3
Gas Mass = 0,03 kg
1 kg = 1,30 Sm3
Gas Volume = 0,04 Sm3
1 m3 LNG = 585,00 Sm3 Gas
Total BOG = 0,00006 m3
Percentage of BOG = 0,00030% Per day

BOG CALCULATION AT GROUND STORAGE


BOG density = 10,18 kg/m3 @ Pressure 6,3 Bar
Volume of Ground Storage (100%) = 105,00 m3
Maximum LNG Volume at Ground Storage (90%) = 94,50 m3
Remaing Capacity of Ground Storage (10%) = 10,50 m3
Gas Mass = 106,92 kg
1 kg = 1,30 Sm3
Gas Volume = 139,00 Sm3
1 m3 LNG = 585,00 Sm3 Gas
Total BOG Volume = 0,24 m3
Total BOG at Holding Time = 0,23% After 30 Days Holding Time
Percentage of BOG = 0,008% Per day

Cummulative BOG Calculation = 2,16% Per Day

Note :
1. Formula :
m=ρxv
V bog = m x (Sm3/kg)

2. BOG pada piping & utilities tidak dimasukkan dalam perhitungan BOG Rate
1 lt 0,001 m3