Sub: Quotation for GSB & Hoarding Installation in Bhubaneswar School Campus.

Dear Mam,

As discussed, please find below the detail quotation for:

1. GSB Installation at School front Gate in Bhubaneswar – Size 92 sqft:

Sl No Work / Material Specifications Amount (Rs.)


Size 23 x 4 = 92 sqft. 20 gauge iron frame,
Front Gate - Back Powder Coated side panel, 0.25mm GI sheet
1 24000
lit Board (GSB) for back cover, Star Flex, Branded Tubes,
Chokes.
Iron Pipe for Side 3 inch round pipe, 24 ft height for both side
2 8000
Support support with primer colouring
4ft of side support pipe to be grouted in
3 Concrete 3000
ground both side with concrete and cement
4 Transportation From office to Site 2000
5 Labour For Pole mounting and GSB Installation 3000
Total 40000
Tax 18% 7200
Grand Total 47200
2. Hoarding installation at School Campus – Size 200 sqft:

Sl No Work / Material Specifications Amount (Rs.)


Size 20ft x 10 ft.(03 nos main pillar) &
Hoarding
1 square pipe fitting (100 running ft) with 45000
installation
fitting & finishing
2 Star Flex Back Black Star Flex 3000
3 Flex Mounting Flex mounting Charges 1000
TOTAL 49000
Tax 18% 8820
Grand Total 57820

For any further clarification please call us, assuring you best services all times.