You are on page 1of 29

406 VGP Chinabank Bldg.

, 6772 Ayala Avenue Makati City


Tel. No. 8817-0706

Company: BDO BDO BF Homes - Aguirre Date: March 28, 2023

RGM Bldg., 326 Aguirre Avenue, BF Homes,


Location: E-form No.: 2023PMOS-002954
Parañaque

Attention: Sir Joel P. Villamarin Date of Completion: February 26, 2023


Facilities Manager
We are pleased to submit our quotation for the ff. requirement;

Scope of Repair/replacement of lobby tiles and back office tiles; Repair/replacement of teller's back wall baseboard
works:

……………………
Items
Descriptions Quantity Unit Unit Cost Unit Price
Labor and Materials - Tiles 60x60
155 pcs 405 62,775.00
(grout, ABC adhesive,cement, etc.)

Labor and Materials - Tiles 30x30


12 pcs 300 3,600.00
(grout, ABC adhesive,cement, etc.)

Labor and Materials - Tiles 20x20


4 pcs 175 700.00
(grout, ABC adhesive,cement, etc.)
1/2" Marine Plywood 1 pc 525 525.00
Laminated Formica 1 pc 1200 1,200.00
Rugby 1 liter 900 900.00
Total Php69,700.00

5 Days Work Period: (4 Personnel)

-Inspection and Mobilization

Labor:
- Dismantling of existing tiles (chipping works) 8,000
- Replacement of new tiles 60x60 (155 pcs.)
- Replacement of new tiles 30x30 (12 pcs.)
- Replacement of new tiles 20x20 (4 pcs.)
- Grouting of replaced tiles
- Installation of baseboard at teller's back wall area

Total Php8,000.00
Grand Total (Labor and Materials) Php77,700.00
Margin Php13,209.00
12% VAT Php10,909.08
Total Cost Php101,818.08

Terms of payment:
- On the 30 days after completion of work
- Validity: 30 days from receipt hereof, subject to our confirmation thereafter
- Cancellation of purchased order, Job order, or Service contract will be charged 30% of the total contract price.

Prepared by:
Conforme:
Engr. Paula Sicat

Checked and verified by:

Engr. Brian Gan


Project Supervisor

Engr. Lorvico Tolentino


Facilities Manager
M&E and Project Management

CERTIFICATE OF COMPLETION

Project Title: Tiles repair/replacement at lobby area, back office area & Male CR
Back wall baseboard repair/replacement at Teller’s area

Location: BDO BF Homes – Aguirre, RGM Bldg., 326 Aguirre Avenue, BF Homes, Parañaque

This is to certify that Team Global Facility Solutions Inc. has satisfactorily completed and
delivered in BDO BF Homes – Aguirre, RGM Bldg., 326 Aguirre Avenue, BF Homes, Parañaque
on February 26, 2023, the following:

1. Dismantling of existing tiles (chipping works)

2. Replacement of 60x60 tiles at Lobby area (155 pcs.)

3. Replacement of 30x30 tiles at Back Office area (12 pcs.)

4. Replacement of 20x20 tiles at Male CR (4 pcs.)

5. Grouting of replaced tiles

6. Installation of baseboard at teller’s back wall area

7. E-Form No.: 2023PMOS-002954

Prepared by: Conforme:

______________________________
Engr. Paula Mae C. Sicat
Signature Over Printed Name/Date

Noted by:

Engr. Brian S. Gan


Project Supervisor

TeamGlobal Facility Solutions, Inc.


Suite 406, VGP-Chinabank Center, 6772 Ayala Ave., Makati City
Trunkline: +632 817.0706 * Fax: +632 501.5218 * Email: info@teamglobal.com.ph
BDO BF Homes Aguirre
Scope of work: Repair/replacement of 60x60 tiles at lobby area

BEFORE
BEFORE
BEFORE
BEFORE
BEFORE

ACTIVITY PHOTOS
ACTIVITY PHOTOS
ACTIVITY PHOTOS`
ACTIVITY PHOTOS`
ACTIVITY PHOTOS`
ACTIVITY PHOTOS`
ACTIVITY PHOTOS`
ACTIVITY PHOTOS`
AFTER
AFTER
Scope of work: Repair/replacement of 30x30 tiles at back office area

BEFORE
ACTIVITY PHOTOS
ACTIVITY PHOTOS
AFTER
Scope of work: Repair/replacement of 20x20 tiles at Male CR

BEFORE

ACTIVITY PHOTOS
AFTER
Scope of work: Repair/replace teller’s back wall baseboard

BEFORE

ACTIVITY PHOTOS
ACTIVITY PHOTOS
ACTIVITY PHOTOS

AFTER