I. DEMOLITION PERMITS
TARGET DATE FOR COMPLETION FOR BUILDING PERMIT APPLICATION JULY 10(not comply)
Sub-Total 269,433.83
Total Labor Cost 269,433.83
40,000.00
43.11%
6.40%
Amount Received:
100.00% 1,080,000.00 624,934.63 -
Summary of Items: (Major Ite
. CHB #6 (SB-Basbacio)
. CHB #4 (SB-Basbacio)
.
. Fortune Cement 233.0
. 243.0
. 270.0
. RSB 10mm 150.0
. RSB 10mm (SSLR) 145.0
. Sand(S-1) 1,200.0
.
.
. Sahara Cement(Fire Wall)
. Ga. 16 G.I. Tie Wire
.
.
.
OVERHEAD EXPENSES
.
.
Lighting Fixtures
.
.
.
.
.
.
.
.
X. TILE WORKS
(Tiles and Finishing Items)
II. Interiror
Common C.R. 3-Sets
.
.
.
.
(Additional Aircon)
Color Items
. SR Flat Choco Brown(FireWall) 645.0
. S&R Seal Gray 645.0
. Latex Mix Gray 245.0
. S&R White 645.0
. S&R Black 185.0
. Tulle White(Interior Color) 2,555.0
. Painting Items Duco Finished #066895 9,445.0
. Painting Materials for Cabinet Duco #069239 9,950.0
. Gutter Color, Terra Cota Brown 590.0
. DVS S/R Tulle White 2,800.0
. BS-701 600.0
. AE White 1,130.0
. Painting Materials Finishing Items #074517 6,015.0
. DV Top Coat and Other Materials 1,680.0
. Painting Materials Finishing Wall & Cabinet #069626
III.Mechanical Accessories
. Performa Concealed Hinges #1 120.0
. Hinges 3.5 x 3.5 120.0
. Performa Concealed Hinges #3 120.0
. Drawer Guide #18 140.0
. Drawer Guide #16 120.0
. Toxscrew #2 2.0
. 2x3x10 S4S Wood 530.0
. SGC BS16 Drawer Guide 16 360.0
. Hole Saw 200.0
. COT Drawer Guide 20" White 254.0
IV.Design
. Base Board 1x4x8 TRTD 290.0
Summary of Items: (Major Items)
Aug. Aug. Aug. Aug. Aug. Aug. Aug. Aug.
15 16 17 18 21 23 24 30 QTY. (Total as of Sept. Sub-Total Expenses FINAL COST
30)
Tue Wed Thu Fri Mon Wed Thu Wed
3,480.00
3,234.00
4,759.75 A
363.80
-
1,500.00
9.0 Receipt 1,350.00
1.0 Receipt 1,000.00
1.0 Receipt 1,000.00
1 1.0 Receipt 1,500.00 C
1 1.0 Receipt 250.00
1 1.0 Receipt 2,000.00
A. Barracks: 11,837.55
B.Tools/Equipment Item: 10,131.25
C. Other Expenses: 8,600.00
36.56% Sum(A.B.C) Total Actual: 30,568.80
-
-
Total Actual: 330.00
Total Estimated Plan: 24,060.06
Balanced 23,730.06
box - #4>
box - #3>
box - #2>
1.0 kl. 90.00 rolls
1.0 kl. 100.00 kls.
7 17.0 pcs. 2,414.00
200 200.0 pcs. 23,000.00 2x3>
10.0 sheets 6,500.00
3 3.0 sheets 1,464.00
10 10 20.0 sheets 12,640.00 P.lic 1/2
-
- #16>
1 1.0 pc. 89.00
-
-
Total Actual: 46,297.00
Total Estimated Plan: 140,680.00
Balanced 94,383.00
pcs. - CHB #6
pcs. -
pcs. - CHB #4
bags -
bags -
bags - C.Bags
pcs. -
pcs. - 10mm>
cu.m. -
cu.m. -
cu.m. - Sand>
boxes - S.Bag>
rolls - #16>
-
-
-
-
Total Actual: -
Total Estimated Plan: 344,362.85
Balanced 344,362.85
pcs. -
pcs. -
pcs. -
pcs. -
pcs. -
shts. -
pcs. -
pcs. -
pc. -
pcs. -
pcs. -
pcs. -
roll -
pcs. -
Total Actual: -
Total Estimated Plan: 8,460.00
Balanced 8,460.00
-
-
-
Total Actual: -
Total Estimated Plan: 73,050.00
Balanced 73,050.00
- pcs. -
- pcs. -
boxes -
boxes -
box -
pc. -
pcs. -
pcs. -
roll -
-
Sub-Total -
Sub-Total -
-
-
-
-
-
pc. -
Sub-Total -
Total Actual: -
Total Estimated Plan: 78,795.00
Balanced 78,795.00
pcs. -
pcs. -
pcs. -
Sub-Total: -
- bags - H.ABC>
- bags - O.ABC>
- bags -
bags - Cemrnt>
- unit -
- units -
- unit -
Sub-Total: -
Total Actual: -
Total Estimated Plan: 189,720.00
Balanced 189,720.00
-
pcs. -
pcs. -
pcs. -
pcs. -
pc. -
pcs. -
pcs. -
pcs. -
pcs. -
pcs. -
pc. -
-
pcs. -
pcs. -
pcs. -
pcs. -
pcs. -
pc. -
-
Receipt -
-
- pcs. -
-
-
-
Total Actual: -
Total Estimated Plan: 48,715.00
Balanced 48,715.00
Total Actual: -
Total Estimated Plan:
Balanced -
gal -
gals -
Receipt -
Receipt -
gals -
gals -
gals -
gal. -
ltrs -
gals -
gals -
gals -
tin -
tin -
tin -
tin -
ltr -
ltr -
pcs. -
bot -
bot -
Receipt -
ltr -
ltr -
gal. -
gals. -
ltr. -
bags -
bags -
bags -
unit - Ex bags>
pcs. -
-
gal -
gal -
ltr -
gals -
ltr -
tin -
Receipt -
Receipt -
gal -
tin -
gal -
gal -
Receipt -
Receipt -
Receipt
-
pcs. -
pcs. -
pcs. -
pcs. -
pcs. -
pcs. -
pc. -
pc. -
pc. -
pcs. -
pcs. -
pc. -
unit -
fts -
fts -
pcs. -
pc. -
pc. -
fts -
fts -
ltr -
ltr -
pcs. -
- pcs. -
-
Total Actual: -
Total Estimated Plan: 91,574.00
Balanced 91,574.00
shts -
shts -
shts -
shts -
pcs. -
shts -
pcs. -
pcs. -
pcs. -
pc. -
ltr -
kl. -
pcs. -
pcs. -
Receipt -
pairs -
yds -
trips -
Pairs -
Pairs -
Pairs -
Pairs -
Pairs -
pcs. -
pcs. -
pcs. -
unit -
units -
pcs. -
-
Total Actual: -
11,837.55 .A
10,131.25 .B 30,568.80
8,600.00 .C
30,568.80
83,610.00
53,041.20
330.00
24,060.06
23,730.06
- 96.00 96.00
- 81.00 81.00
238,305.00
963,882.68
963,882.68
725,577.68
- 2.0 2.0
- 4.0 4.0
- 2.0 2.0
- 2.0 2.0
2.00
-
217.0 600.0 383.0
46,297.00
140,680.00
94,383.00
- 1,405.0 1,405.00
- 632.0 632.00
- 162.0
- 76.9 76.94
- 4.0 4.00
4.0 4.00
-
344,362.85
344,362.85
-
8,460.00
8,460.00
-
73,050.00
73,050.00
-
78,795.00
78,795.00
230.00 per pcs. Contract
-
-
-
189,720.00
189,720.00
-
48,715.00
48,715.00
-
-
-
91,574.00
91,574.00
-
37,500.00
37,500.00
315,500.80
2,084,409.59 2,084,409.59 -
"Accumulated Funds" (Contractor's Profit Monthly)
Fund Release:
A.R. # 1 7-8 300,000.00 20,000.00 6.67%
A.R. # 1 7-11 780,000.00 20,000.00 2.56%
PARTIAL PROFIT:
ACTUAL POSTING EXPENSES:
PROJECT EXPENSES:
Balanced: Amount as: (8/31/2023) Total Revolving Fund:
Total Unpaid Receipt:
TOTAL BALANCE:
Payroll
Covered 8TH PAYROLL Aug 12 to Aug. 19 50,871.55
Payroll
Covered 9TH PAYROLL Aug. 20 to Aug. 27 35,207.83
Payroll
Covered 11TH PAYROLL Sept. 3 to Sept. 10 -
Payroll
13TH PAYROLL Sept. 18 to Sept. 24 -
Covered
O.R. #: Date: Amount: Description
Payroll
Covered 15TH PAYROLL Oct. 2 to Oct. 8 -
UNPAID RECEIPT
O.R. #: Date: Amount: Description
1954 3-Aug 8,740.00 Sand(S-1) 7.6cu.m. = P 1,150.00
Negotiation L.A.M Rosales
1955 3-Aug 8,459.00 Gravel(3/4) 7.69cu.m. = P 1,100.00
0428 16-Aug 8,740.00 Sand(S-1) 7.6cu.m. = P 1,150.00
Negotiation L.A.M Rosales
0428 16-Aug 8,459.00 Gravel(S-1) 7.6cu.m. = P 1,150.00
122,878.00
O.R. #: Date: Amount: Description
UNPAID RECEIPT
Contract Cost:
Additional Cost(Fence):
280,000.00 Aprox. Contract Cost: -
760,000.00
-
- Accumulated Funds:
- Balanced:
-
-
- Shoulder + Accumulated
-
-
-
1,040,000.00
40,000.00
584,934.63
4,950.00 (IYAM)
8,500.00 (MIX PROJECT)
638,384.63
441,615.38 shouldered
122,878.00
318,737.38
0 # days
0
Sept. 4 to Sept. 10
Major Items: -
Toll Pass:Diesel - -
Week Payroll: -
0 # days
0
Sept. 11 to Sept. 17
Major Items: -
Toll Pass:Diesel - -
Week Payroll: -
0 # days
0
Sept. 18 to Sept. 24
Major Items: -
Toll Pass:Diesel - -
Week Payroll: -
0 # days
0
Sept. 25 to Oct. 1
Major Items: -
Toll Pass:Diesel - -
Week Payroll: -
0 # days
0
Oct. 2 to Oct. 8
Major Items: -
Toll Pass:Diesel - -
Week Payroll: -
↘↘↘
150.00
Summary Expenses (Actual Work) 624,934.63
POSTING 624,934.63
-
Summ
PROPOSED 1-STOREY 3-UNIT COMMERCIAL BUILDING
Food/Meryenda
Payroll Expenses Rice Allow.
Budget
PLAN EXECUTION
ACTUAL
BALANCE
Summary Payroll(1-30)
Note: Red is completed
No.
O.H. Total Working Scope of Works
Days
1,500.00 19,370.00 6.0 Demolition of Exisiting Building
1,900.00 20,940.00 6.0 Demolition of Exisiting Building
1,600.00 19,080.00 6.0 Demolition(Completed) and Excavation of Wall Ftg/Fabrication of 10-Steel Co
1,900.00 16,045.00 6.0 Demolition(Completed) and Excavation of Wall Ftg/Fabrication of 10-Steel Co
2,550.00 26,145.00 6.0 Excavation of Footing 20sets Ongoing, 20sets Column Completed
1,500.00 25,947.00 5.5 Excavation of Footing 20sets Ongoing, Perimeter Wall Footing & Stirrups Ong
1,000.00 19,872.50 4.5 Excavation of 20-Footing Completed for Clarification for Engineering
3,362.00 50,871.55 8.0 Emabankment,Rear,Left,Side,Front(Wall Footing), 2-Remaining Ftg, Lower Bo
2,750.00 35,207.83 6.0 Embankment, Footing(Completed), FTB-1(Steel Reinf./Form)
2,945.00 35,954.95 6.0 Reinf. T-Beam(Completed), Masonry Below Ground Completed, Pouring T-Be
>>>>> 269,433.83
RICE BUDGET
25,000.00 1st 1,250 1500
25,000.00 2nd 1,250 1500
25,000.00 3rd 1,250 1500
25,000.00 4th 1,250 1500
25,000.00 5th 1,250 1500
25,000.00 6th 1,250 1500
30,000.00 7TH 1,250 1500
30,000.00 8th 1,250 1500
30,000.00 9th 1,250 1500
30,000.00 10th 1,250 1500
ASSUMPTION
30,000.00 BUDGET 11th 1,250 1500
PLAN FOR 15 WEEKS
30,000.00 12th 1,250 1500 ACCOMPLISHMENT
30,000.00 13th 1,250 1500
30,000.00 14th 1,250 1500
30,000.00 15th 1,250 1500
30,000.00 15th 1,250 1500
45,000.00 16th 2,000 3000
30,000.00 17th 1,250 1500
30,000.00 18th 1,250 1500
30,000.00 19th 1,250 1500
30,000.00 20th 1,250 1500
330,250.00 269,433.83
18
PLAN ESTIMATE BUFFER
757,755.60 82,755.60
ITEM I TO ITEM V VI. VII. VIII.
ROLL-UP DOORS,
AWNING
HANDRAILINGS ELECTRICAL WORKS
WINDOWS,
FLASH DOORS
19,370.00
20,940.00
19,080.00
16,045.00
26,145.00
25,947.00
19,872.50
50,871.55
35,207.83
35,954.95
269,433.83 0 0 0
IX. X. XI. XII.
CARPENTRY TOTAL
PLUMBING PANTING
TILE WORKS AND
WORKS WORKS
HARDWARES
-
-
-
-
-
-
-
-
0 0 0 0 269,433.83 -
PROJECT: CONST. ONE STOREY 3UNIT-COMMERCIAL BUILDING
LOCATION: 142 MAHARLIKA HIGHWAY IBABANG IYAM LUCENA
1ST PAYROLL June 19 to June 24
SUN MON TUE WED. THUR. FRI. SAT.
NAME: RATE June June June June June June June TOTAL # OF SUB TOTAL C.A. Total Salary
DAYS
18 19 20 21 22 23 24 LESS
FREDIE 1 1 1 1 1 1 6.0 3,600.00 700 2,900.00
1 (LEAD-MAN) 600
-
1 1 1 1 1 1 6.0 2,880.00 700 2,180.00
2 GARY
(SEMI-SKILLED) 480
-
A A 1 1 1 1 4.0 1,600.00 300 1,300.00
3 Aljun
(Helper) 400
-
J.R. 1 1 1 1 1 1 6.0 3,600.00 1,000 2,600.00
4 (Skilled) 600
-
C.J. A A 1 1 1 1 4.0 1,720.00 500 1,220.00
5 (HELPER) 430
-
ERICK A A 1 1 1 1 4.0 1,720.00 500 1,220.00
6 (HELPER) 430
-
1 1 1 1 1 5.0 2,750.00 2,750.00
8 JOEL
(MONITORING/ RUNNER) 550
-
4 4 7 7 7 6 17,870.00 3,700 14,170.00
RICE ALLOW:
FOOD: June 19 1,500.00 1,500.00
ITEM I TO V. 19,370.0 W.D. 6.0 S.P #1 19,370.00 -
#1 Payroll 15,670.00
NAME: RATE SUN. MON TUE WED. THUR. FRI. SAT. SUN. SUB TOTAL C.A. Total Salary
June June June June June June July July TOTAL # OF
DAYS
25 26 27 28 29 30 1 2(NO-WORK) LESS
1 1 1 1 1 1 1 7.0 4,200.00 1,000 3,200
1 FREDIE
(LEAD-MAN) 600
-
JOHN MARK 1 1 1 1 1 1 6.0 2,640.00 100 2,540
2 (HELPER) 440
-
CHRISTIAN 0.0 - -
3 (SEMI-SKILLED) 450
-
ERICK 1 1 1 1 1 1 6.0 2,580.00 500 2,080
4 (HELPER) 430
-
1 1 1 1 1 1 6.0 2,580.00 500 2,080
5 C.J.
(HELPER) 430
-
GARY 1 1 1 1 1 1 1 7.0 3,360.00 500 2,860
6 (SEMI-SKILLED) 480
-
JOSEPH 1 1 1 1 1 1 6.0 2,580.00 500 2,080
7 (HELPER) 430
-
JOEL 1 1 2.0 1,100.00 1,100
8 (MONITORING/ RUNNER) 550
-
2 6 6 6 6 7 7 19,040.00 3,100 15,940.00
RICE ALLOW: 900.00
FOOD: June 26 1,000.00 1,000.00
ITEM I TO V. 20,940.0 W.D. 6.0 S.P #2 20,940.00
#2 Payroll 16,940.00
PROJECT: CONST. ONE STOREY 3UNIT-COMMERCIAL BUILDING
LOCATION: 142 MAHARLIKA HIGHWAY IBABANG IYAM LUCENA
3RD PAYROLL July 3 to July 8
NAME: RATE MON TUE WED. THUR. FRI. SAT. SUN. SUB TOTAL C.A. Total Salary
July July July June June July July TOTAL # OF
DAYS
3 4 5 6 7 8 9 LESS
FREDIE 1 1 1 1 1 1 6.0 3,600.00 1,000 2,600
1 (LEAD-MAN) 600
-
1 1 1 1 1 1 6.0 2,640.00 2,640
2 JOHN MARK
(HELPER) 440
-
CHRISTIAN 1 1 1 1 1 1 6.0 2,700.00 1,000 1,700
3 (SEMI-SKILLED) 450
-
ERICK 1 1 1 1 1 1 6.0 2,580.00 2,580
4 (HELPER) 430
-
0.5 1 1 1 3.5 1,505.00 500 1,005
5 LEO
(HELPER) 430
-
GARY 1 1 1 1 1 1 6.0 2,880.00 500 2,380
6 (SEMI-SKILLED) 480
-
0.0 - -
7 JOSEPH
(HELPER) 430
-
RICHARD 0.5 1 1 1 3.5 1,575.00 700 875
3 (SEMI-SKILLED) 450
-
5 5 6 7 7 7 17,480.00 3,700 13,780.00
RICE ALLOW: 900.00
FOOD: July 3 700.00 700.00
ITEM I TO V. 19,080.00 W.D. 6.0 S.P #3 19,080.00
↘↘↘ CONTRACT #3 Payroll 14,480.00
STARTED
NAME: RATE SUN. MON TUE WED. THUR. FRI. SAT. SUB TOTAL C.A. Total Salary
July July July July July July July TOTAL # OF
DAYS
16 17 18 19 20 21 22 LESS
A A 1 NO WORK 1 1 1 4.0 2,400.00 2,400
FREDIE
1 (LEAD-MAN) 600
-
A A 1 NO WORK 1 1 1 4.0 1,760.00 500 1,260
JOHN MARK
2 (HELPER) 440
-
1 1 1 NO WORK 1 1 1 6.0 2,700.00 2,700
CHRISTIAN
3 (SEMI-SKILLED) 450
-
A A 0.5 NO WORK 1 1 1 3.5 1,605.00 1,605
RODEL
4 (HELPER) 430 2 100.0
-
A A 1 NO WORK 1 1 1 4.0 1,720.00 1,720
A.C
5 (HELPER) 430
-
A A 1 NO WORK 1 1 1 4.0 1,720.00 1,720
JONEL
6 (HELPER) 430
-
A 1 1 NO WORK 1 1 1 5.0 2,150.00 2,150
7 KEVIN
(HELPER) 430
-
1 1 1 NO WORK 1 1 1 6.0 2,580.00 2,580
LEO
8 (HELPER) 430
-
A A 1 NO WORK 0.5 1 1 3.5 1,680.00 1,680
9 GARY
(SEMI-SKILLED) 480
-
1 1 1 NO WORK 1 1 1 6.0 2,580.00 2,580
CEDRICK
10 (HELPER) 430
-
1 1 1 NO WORK 1 1 1 6.0 2,700.00 2,700
11 RICHARD
(SEMI-SKILLED) 450
-
4 5 10.5 0 10.5 11 11 23,595.00 23,095.00
RICE ALLOW: 1,050.00
FOOD: July 1,500.00
ITEM I TO V. 26,145.00 W.D. 6.0 S.P #5 26,145.00
#5 Payroll 23,095.00
PROJECT: CONST. ONE STOREY 3UNIT-COMMERCIAL BUILDING
LOCATION: 142 MAHARLIKA HIGHWAY IBABANG IYAM LUCENA
6TH PAYROLL July 23 to July 30
SUN. MON TUE WED. THUR. FRI. SAT. SUN.
NAME: RATE July July July July July July July July TOTAL # OF SUB TOTAL C.A. Total Salary
DAYS
23 24 25 26 27 28 29 30 LESS
- 0.5 1 RAINING 1 1 0.5 1 5.0 3,000.00 300 2,200
FREDIE
1 (LEAD-MAN) 600 2 150.0 500
-
- 1 1 RAINING 1 1 0.5 1 5.5 2,365.00 200 2,165
JOHN MARK
2 (HELPER) 430 2 107.0
-
- 0.5 1 RAINING 1 1 0.5 1 5.0 2,250.00 500 1,750
CHRISTIAN
3 (SEMI-SKILLED) 450 2 112.0
-
- 0 0 RAINING 1 1 0.5 2.5 1,182.00 200 482
4 RODEL
(HELPER) 430 2 107.0 500
-
- 1 1 RAINING 1 1 0.5 GO HOME 4.5 1,935.00 200 1,035
5 A.C
(HELPER) 430 2 107.0 700
-
- 1 1 RAINING 1 1 0.5 GO HOME 4.5 1,935.00 100 1,185
6 JONEL
(HELPER) 430 2 107.0 650
-
- 1 1 RAINING 1 1 0.5 1 5.5 2,365.00 1,365
7 KEVIN
(HELPER) 430 2 107.0 1,000
-
- 1 1 RAINING 1 1 0.5 1 5.5 2,365.00 1,365
8 LEO
(HELPER) 430 2 107.0 1,000
-
0 1 1 RAINING 1 1 0.5 1 5.5 2,640.00 200 1,440
GARY
9 (SEMI-SKILLED) 480 2 120.0 1,000
-
0 1 1 RAINING 1 1 0.5 GO HOME 4.5 1,935.00 200 435
CEDRICK
10 (HELPER) 430 2 107.0 1,300
-
0 1 1 RAINING 1 1 0.5 1 5.5 2,475.00 200 1,175
RICHARD
11 (SEMI-SKILLED) 450 2 112.0 1,100
-
0 9 10 0 11 11 5.5 24,447.00 14,597.00
RICE ALLOW:
FOOD: July 1,500.00
ITEM I TO V. 25,947.00 W.D. 5.5 S.P #6 25,947.00
#6 Payroll 14,597.00
PROJECT: CONST. ONE STOREY 3UNIT-COMMERCIAL BUILDING
LOCATION: 142 MAHARLIKA HIGHWAY IBABANG IYAM LUCENA
7TH PAYROLL July 31 to Aug. 4
SUN. MON TUE WED. THUR. FRI. SAT. SUN. MON > FRI.
NAME: RATE TOTAL # OF SUB TOTAL C.A. Total Salary
July July Aug Aug Aug Aug Aug Aug Aug DAYS
30 31 1 2 3 4 5 6 7 > 11 LESS
1 1 1 1 0.5 4.5 2,700.00 2,700
FREDIE
1 (LEAD-MAN) 600
-
1 1 1 1 0.5 4.5 1,980.00 1,980
JOHN MARK
2 (HELPER) 440
-
A 0.5 A A A 0.5 225.00 225
CHRISTIAN
3 (SEMI-SKILLED) 450
-
1 1 1 1 1 0.75 5.8 2,472.50 2,473
ALBERT
4 (HELPER) 430
-
A A 0.5 1 0.5 2.0 860.00 860
A.C
5 (HELPER) 430
-
A A 1 1 0.5 2.5 1,075.00 1,075
JONEL
6 (HELPER) 430
-
A 1 1 A 0.5 2.5 1,075.00 1,075
7 KEVIN
(HELPER) 430
-
1 1 1 1 0.5 4.5 1,935.00 1,935
LEO
8 (HELPER) 430
-
1 1 1 1 0.5 4.5 2,160.00 2,160
9 GARY
(SEMI-SKILLED) 480
-
1 1 1 1 1 0.5 5.5 2,365.00 2,365
CEDRICK
10 (HELPER) 430
-
1 1 1 1 0.5 4.5 2,025.00 2,025
11 RICHARD
(SEMI-SKILLED) 450
-
2 7 8.5 9.5 9 5.25 18,872.50 18,872.50
RICE ALLOW:
FOOD: Aug 1,000.00
ITEM I TO V. 19,872.50 W.D. 4.5 S.P #7 19,872.50
#7 Payroll 18,872.50 Paid
PROJECT: CONST. ONE STOREY 3UNIT-COMMERCIAL BUILDING
LOCATION: 142 MAHARLIKA HIGHWAY IBABANG IYAM LUCENA
8TH PAYROLL Aug 12 to Aug. 19
NAME: RATE SAT. SUN. MON. TUE. WED. THUR. FRI. SAT. SUB TOTAL C.A. Total Salary IYAM MIX PROJECTS
Aug Aug Aug Aug Aug Aug Aug Aug TOTAL # OF
DAYS
12 13 14 15 16 17 18 19 LESS 8- 19
1 1 1 1 1 1 1 1 8.0 4,875.00 4,600 275 2,000
FREDIE
1 (LEAD-MAN) 600 1 75.0
-
1 1 1 1 1 1 1 1 8.0 3,489.95 900 2,590
JOHN MARK
2 (HELPER) 430 1 50.0
-
1 1 1 1 1 1 1 1 8.0 3,900.00 1,775 2,125 -
CHRISTIAN
3 (SEMI-SKILLED) 480 1 60.0
(injure) -
3 1 1 1 1 1 1 1 10.0 4,349.95 3,000 1,350 TIRSO(8-27)
4 ALBERT
(HELPER) 430 1 50.0 2500
- 0
1 1 1 1 1 1 1 1 8.0 3,489.95 2,000 1,490
A.C
5 (HELPER) 430 1 50.0 HOMER(9-2)
- 1,200
1 1 1 1 1 1 1 1 8.0 3,489.95 1,500 1,990
JONEL
6 (HELPER) 430 1 50.0 ARMAN(9-2)
- 800
1 1 1 1 1 1 1 1 8.0 3,489.95 700 2,790
YAWIN
7 (HELPER) 430 1 50.0
- ANGA(9-2)
A A 1 1 0.5 1 1 1 5.5 2,414.95 800 1,615 500
KEVIN
8 (HELPER) 430 1 50.0
-
A A A A A A A A 0.0 - - 700
9 LEO
(HELPER) 430 0.0 GANI(9-2)
- 1,500
A A A A A A A A 0.0 - - 500
GARY
10 (SEMI-SKILLED) 480 0.0 500 MELDI(8-27)
- 2,000
1 1 1 1 1 1 1 1 8.0 3,900.00 800 2,600 500 -
11 JOJIE
(HELPER) 480 1 60.0 500
-
1 1 1 1 0.5 1 1 1 7.5 3,274.95 2,400 875
CEDRICK
12 (HELPER) 430 1 50.0
-
A A 1 1 1 WAREHOUSE WAREHOUSE MUNTINLUPA 3.0 1,875.00 1,875
13 HOMER
(SKILLED) 600 1 75.0
-
A A 1 1 1 WAREHOUSE WAREHOUSE WAREHOUSE 3.0 1,250.00 1,250
ANGA
14 (HELPER) 400 1 50.0
-
A A 0.5 1 CHIEF CHIEF CHIEF CHIEF 1.5 1,054.95 1,055 750
15 J.R.
(SKILLED) 650 1 80.0
-
MUNTINLUPA MUNTINLUPA 1 1 1 1 1 1 6.0 2,754.95 2,000 755 -
YOYOY
16 (HELPER) 450 1 55.0
-
1 1 1 1 1 1 1 1 8.0 3,900.00 1,800 2,100
RICHARD
17 (SEMI-SKILLED) 480 1 60.0
-
12 10 14.5 15 13 12 12 12 47,509.55 24,734.55 4,950 8,500
RICE ALLOW/INOM: 1,812.00
FOOD: Aug 1,550.00
ITEM I TO V. 50,871.55 W.D. 8.0 S.P #8 50,871.55
#8 Payroll 24,734.55
PROJECT: CONST. ONE STOREY 3UNIT-COMMERCIAL BUILDING
LOCATION: 142 MAHARLIKA HIGHWAY IBABANG IYAM LUCENA
9TH PAYROLL Aug. 20 to Aug. 27
NAME: RATE SUN MON TUE WED. THUR. FRI. SAT. SUN. SUB TOTAL C.A. Total Salary
Aug Aug Aug Aug Aug Aug Aug Aug TOTAL # OF
DAYS
20 (NO WORK) 21 22 23 24 25 26 27 (raining) LESS
1 1 1 1 1 1 6.0 3,825.00 500 3,325
FREDIE
1 (LEAD-MAN) 600 1.5 1.5 unpaid 225.0
-
0.5 1 1 1 1 1 5.5 2,445.03 250 2,195
JOHN MARK
2 (HELPER) 430 1.5 unpaid 80.0
-
INJURE 1 1 1 1 1 5.0 2,490.00 500 1,990
CHRISTIAN
3 (SEMI-SKILLED) 480 1.5 unpaid 90.0
-
1 1 1 1 1 1 6.0 2,739.95 1,250 1,490
ALBERT
4 (HELPER) 430 1.5 1.5 unpaid 160.0
-
(WEEK 14-19) 1 1 1 1 1 1 6.0 3,000.00 Paid(8-21)
ROI
5 (MONITORING) 500 A 1 0.5 1 1 1 4.5 2,250.00 2,250 bal. 250
-
1 1 1 1 1 1 6.0 2,739.95 500 2,240
JONEL
6 (HELPER) 430 1.5 1.5 unpaid 160.0
-
A A A A A A 0.0 - -
KEVIN 430 0.0
(HELPER)
-
A A A A A A 0.0 - -
GARY
(SEMI-SKILLED) 480 0.0
-
1 1 1 1 1 1 6.0 3,060.00 750 2,310
7 JOJIE
(HELPER) 480 1.5 1.5 unpaid 180.0
-
1 1 1 1 1 1 6.0 2,739.95 250 2,490
CEDRICK
8 (HELPER) 430 1.5 1.5 unpaid 160.0
-
WAREHOUSE A ST.THOMAS ST.THOMAS 1 1 2.0 1,200.00 1,200
HOMER 600 0.0
(SKILLED)
-
WAREHOUSE A A A 1 1 2.0 800.00 1,000 (200)
ANGA
(HELPER) 400 0.0
-
0.5 0.5 200.00 200
KEVIN 400 0.0
(HELPER)
-
1 1 1 1 1 1 6.0 2,867.95 1,000 1,868
YOYOY
9 (HELPER) 450 1.5 1.5 unpaid 168.0
-
1 1 1 1 TUNASAN TUNASAN 4.0 2,100.00 2,100
RICHARD
10 (SEMI-SKILLED) 480 1.5 1.5 unpaid 180.0
-
8.5 11 11 11 12 12 32,457.83 23,457.83
SINANDOMENG: 1,250.00
FOOD: Aug 1,500.00
ITEM I TO V. 35,207.83 W.D. 6.0 S.P #9 35,207.83
#9 Payroll 23,457.83
PROJECT: CONST. ONE STOREY 3UNIT-COMMERCIAL BUILDING
LOCATION: 142 MAHARLIKA HIGHWAY IBABANG IYAM LUCENA
10TH PAYROLL Aug. 28 to Sept. 2
NAME: RATE MON TUE WED. THUR. FRI. SAT. SUB TOTAL C.A. Total Salary
Aug Aug Aug Aug Sept Sept TOTAL # OF
DAYS
28 29 30 31 1 2 LESS
1 1 1 1 1 1 6.0 3,750.00 700 3,050
FREDIE
1 (LEAD-MAN) 600 1.0 1.0 150.0
-
1 1 1 1 1 1 6.0 2,700.00 1,000 1,700
JOHN MARK
2 (HELPER) 440 1.0 60.0
-
1 1 1 1 1 1 6.0 3,000.00 1,500 1,500
CHRISTIAN
3 (SEMI-SKILLED) 480 1.0 1.0 120.0
-
1 1 1 1 1 1 6.0 2,629.95 2,000 630
ALBERT
4 (HELPER) 430 1.0 50.0
-
0.0 - Unpaid(8-21) bal. 250
ROI
5 (MONITORING) 500 1 A A 1 1 1 4.0 2,000.00 2,000 Unpaid(28-2)
-
A 1 1 1 1 1 5.0 2,150.00 1,000 1,150
JONEL
6 (HELPER) 430 0.0
-
1 1 1 1 1 1 6.0 2,580.00 1,180 1,400
YOYOY
7 (HELPER) 430 0.0
-
1 1 1 1 1 1 6.0 3,000.00 1,000 1,500
JOJIE
8 (HELPER) 480 1.0 1.0 120.0 500
-
0.5 1 1 1 1 1 5.5 3,300.00 2,500 800
9 HOMER
(SKILLED) 600 0.0
-
A 1 1 1 1 1 5.0 2,000.00 1,700 300
ANGA
10 (HELPER) 400 0.0
-
A 1 1 0.5 0.5 1 4.0 1,720.00 1,000 720
8 KEVIN
(HELPER) 430 0.0
-
A 1 1 0.5 0.5 1 4.0 1,600.00 1,000 600
ALJIE
9 (HELPER) 400 0.0
-
A A 0.5 1 1 0.5 3.0 1,290.00 1,000 290
10 A.C.
(HELPER) 430 0.0
-
A A 0.5 1 1 0.5 3.0 1,290.00 1,000 290
C.J.
11 (HELPER) 430 0.0
-
0 7.5 11 12 13 13 13 33,009.95 15,929.95
RICE ALLOW: 1,445.00
FOOD: Aug-Sept 1,500.00
ITEM I TO V. 35,954.95 W.D. 6.0 S.P #10 35,954.95
#10 Payroll 15,929.95
PROJECT: CONST. ONE STOREY 3UNIT-COMMERCIAL BUILDING
LOCATION: 142 MAHARLIKA HIGHWAY IBABANG IYAM LUCENA
11TH PAYROLL Sept. 3 to Sept. 10
NAME: RATE SUN MON TUE WED. THUR. FRI. SAT. SUN. SUB TOTAL C.A. Total Salary
Sept Sept Sept Sept Sept Sept Sept Sept TOTAL # OF
DAYS
3 4 5 6 7 8 9 10 LESS
1 1 1 3.0 1,800.00 1,800
FREDIE
1 (LEAD-MAN) 600
-
A A 0.0 - -
JOHN MARK
2 (HELPER) 440
-
WAREHOUSE WAREHOUSE 1 1.0 700.00 700
MELDI
3 (PLUMB-WELDER) 700
-
1 1 2.0 860.00 860
YOYOY
4 (HELPER) 430
-
1 WAREHOUSE WAREHOUSE 1.0 430.00 430
A.C
5 (HELPER) 430
-
1 1 2.0 860.00 860
JONEL
6 (HELPER) 430
-
1 1 1 3.0 1,440.00 1,440
JOJIE
7 (SKILLED) 480
-
1 A 1.0 430.00 430
KEVIN
7 (HELPER) 430
-
A 1 1.0 600.00 600
8 HOMER
(SKILLED) 600
-
1 1 2.0 960.00 960
ALBERT
9 (HLPER) 480
-
0.5 1 1.5 - -
10 ALJIE
(HELPER)
-
MUNTINLUPA MUNTINLUPA 0.0 - -
RICHARD
11 (SEMI-SKILLED) 450
-
3 6.5 7 1 0 0 0 8,080.00 8,080.00
RICE ALLOW: 1,100.00
FOOD: July 2,450.00
ITEM I TO V. 11,630.00 W.D. 1.0 S.P #11 11,630.00
#11 Payroll 8,080.00
PROJECT: CONST. ONE STOREY 3UNIT-COMMERCIAL BUILDING
LOCATION: 142 MAHARLIKA HIGHWAY IBABANG IYAM LUCENA
12TH PAYROLL Sep. 11 to Sept. 17
NAME: RATE MON TUE WED. THUR. FRI. SAT. SUN. SUB TOTAL C.A. Total Salary
Sept Sept Sept Sept Sept Sept Sept TOTAL # OF
DAYS
11 12 13 14 15 16 17 LESS
0.0 - -
FREDIE
1 (LEAD-MAN) 600
-
0.0 - -
JOHN MARK
2 (HELPER) 440
-
0.0 - -
CHRISTIAN
3 (SEMI-SKILLED) 450
-
0.0 - -
RODEL
4 (HELPER) 430
-
0.0 - -
A.C
5 (HELPER) 430
-
0.0 - -
JONEL
6 (HELPER) 430
-
0.0 - -
KEVIN
7 (HELPER) 430
-
0.0 - -
LEO
8 (HELPER) 430
-
0.0 - -
9 GARY
(SEMI-SKILLED) 480
-
0.0 - -
CEDRICK
10 (HELPER) 430
-
0.0 - -
11 RICHARD
(SEMI-SKILLED) 450
-
0 0 0 0 0 0 0 - -
RICE ALLOW:
FOOD: July
ITEM I TO V. - W.D. - S.P #12 -
#12 Payroll -
PROJECT: CONST. ONE STOREY 3UNIT-COMMERCIAL BUILDING
LOCATION: 142 MAHARLIKA HIGHWAY IBABANG IYAM LUCENA
13TH PAYROLL Sept. 18 to Sept. 24
NAME: RATE MON TUE WED. THUR. FRI. SAT. SUN. SUB TOTAL C.A. Total Salary
Sept Sept Sept Sept Sept Sept Sept TOTAL # OF
DAYS
18 19 20 21 22 23 24 LESS
0.0 - -
FREDIE
1 (LEAD-MAN) 600
-
0.0 - -
JOHN MARK
2 (HELPER) 440
-
0.0 - -
CHRISTIAN
3 (SEMI-SKILLED) 450
-
0.0 - -
RODEL
4 (HELPER) 430
-
0.0 - -
A.C
5 (HELPER) 430
-
0.0 - -
JONEL
6 (HELPER) 430
-
0.0 - -
7 KEVIN
(HELPER) 430
-
0.0 - -
LEO
8 (HELPER) 430
-
0.0 - -
9 GARY
(SEMI-SKILLED) 480
-
0.0 - -
CEDRICK
10 (HELPER) 430
-
0.0 - -
11 RICHARD
(SEMI-SKILLED) 450
-
0 0 0 0 0 0 0 - -
RICE ALLOW:
FOOD: July
ITEM I TO V. - W.D. - S.P #13 -
#13 Payroll -
PROJECT: CONST. ONE STOREY 3UNIT-COMMERCIAL BUILDING
LOCATION: 142 MAHARLIKA HIGHWAY IBABANG IYAM LUCENA
14TH PAYROLL Sept. 25 to Oct. 1
NAME: RATE MON TUE WED. THUR. FRI. SAT. SUN. SUB TOTAL C.A. Total Salary
Sept Sept Sept Sept Sept Sept Oct TOTAL # OF
DAYS
25 26 27 28 29 30 1 LESS
0.0 - -
FREDIE
1 (LEAD-MAN) 600
-
0.0 - -
JOHN MARK
2 (HELPER) 440
-
0.0 - -
CHRISTIAN
3 (SEMI-SKILLED) 450
-
0.0 - -
RODEL
4 (HELPER) 430
-
0.0 - -
A.C
5 (HELPER) 430
-
0.0 - -
JONEL
6 (HELPER) 430
-
0.0 - -
KEVIN
7 (HELPER) 430
-
0.0 - -
LEO
8 (HELPER) 430
-
0.0 - -
9 GARY
(SEMI-SKILLED) 480
-
0.0 - -
CEDRICK
10 (HELPER) 430
-
0.0 - -
11 RICHARD
(SEMI-SKILLED) 450
-
0 0 0 0 0 0 0 - -
RICE ALLOW:
FOOD: July
ITEM I TO V. - W.D. - S.P #14 -
#14 Payroll -
15TH PAYROLL Oct. 2 to Oct. 8
MON TUE WED. THUR. FRI. SAT. SUN.
NAME: RATE Oct Oct Oct Oct Oct Oct Oct TOTAL # OF SUB TOTAL C.A. Total Salary
DAYS
2 3 4 5 6 7 8 LESS
0.0 - -
1 FREDIE
(LEAD-MAN) 600
-
0.0 - -
2 JOHN MARK
(HELPER) 440
-
0.0 - -
CHRISTIAN
3 (SEMI-SKILLED) 450
-
0.0 - -
RODEL
4 (HELPER) 430
-
0.0 - -
5 A.C
(HELPER) 430
-
0.0 - -
JONEL
6 (HELPER) 430
-
0.0 - -
KEVIN
7 (HELPER) 430
-
0.0 - -
LEO
8 (HELPER) 430
-
0.0 - -
GARY
9 (SEMI-SKILLED) 480
-
0.0 - -
10 CEDRICK
(HELPER) 430
-
0.0 - -
RICHARD
11 (SEMI-SKILLED) 450
-
0 0 0 0 0 0 0 - -
RICE ALLOW:
FOOD: July
ITEM I TO V. - W.D. - S.P #15 -
#15 Payroll -
1500
1000
DETAILED ESTIMATES
A. DIRECT COST
MATERIALS COST
A. Barracks
MISC. ITEMS FROM POSTING
MISC. ITEMS
MISC. ITEMS DIESEL GASOLINE ETC.
B. Tools
LABOR COST
2.0 Skilled(Layout and Barrack) 16.0 days
7.0 Laborer(Layout and Clearing) 16.0 days
SUMMARY
Labor Cost = 67,360.00
Materials Cost = 83,610.00
Total = 150,970.00
Unit Cost = 612.06
LABOR COST:
4.0 Laborer(Excavation) 18.4 days
4.0 Laborer(Compaction & Spreading) 17.2 days
MATERIALS COST
Emabankment
Base Course(Palsabangon) 23.0 cu.m.
Tools
Shovel Pointed 6.0 pcs.
Digging Bar ok pcs.
Plastic Drum 200lit ok Drum
Garden Hose 1/2 Green 85.0 mtrs
Plastic Container 30lit ok containers
Lona Cover 3ft(W) 1.0 roll
MISC. ITEMS(GAS/DIESEL/EQUIPMENT MAINTENANCE)
Termite Treatment Line
SUMMARY
Labor Cost = 56,895.60
Materials Cost = 24,060.06
Equipment Cost =
Total = 80,955.66
Unit Cost = 466.29
III. CONCRETE WORKS: FOOTING (F1,F2,F3,WF,FTB,COLUMN(C1,C2,C3 and P-C),BEAMS(B1,B2,B3), FLOOR SLAB(FS-1) OTH
10. Staircase
Footing and Pedestal Landing
StepArea = 2.313 m2
Width = 2.00 m
Stair Vol. = 4.63 cu.m.
Quantity of Reinforcement:
1.Footing Bars
Isolated Footing 1 20.0 Sets
Main Bar: = 0.016 Øm
X&Y = L -2(cc) + 2(Main Bar x db)
X-Axis = 1.50 m cut
Y-Axis = 1.50 m cut
Spacing O.C. = 0.24
PCs @ Y-axis = 6.0 pcs.
16Ø bars = 70.0 pcs.
2. Wall Footing(WF)
Main Bar = 0.010 Øm Stirrups = 0.010
Perimeter Length = 70.51 m (Total) = 70.51
Eff. Length of Bar = 5.40 m (0.6m Lap) Spacing = 0.25
= 3.00 Lines Eff. Cut Length = 0.40
10Ø bars = 40.00 pcs. 10Ø bars = 19.00
3. Columns
Column Iso(C1)
Main Bar: = 0.016 Øm Total Length Stretch = 98.0
C-1 Iso(C1-4.9m) = 20.0 sets for beam 20x40 0.15
# of Main Bar = 6.0 pcs. Stirrups(C-1) = 0.010
Ht. Fr. Footing >
= 4.90 m (Total) Ave. Spacing = 653.33
Deck Beam
Ave. Cut Stirrups = 1.20
16Ø bars = 115.0 pcs. 10Ø bars = 131.0
4. Footing-Tie Beam(FBT)
Base (FBT)
Main Bar: = 0.012 Øm Total Length Stretch = 145.9
Perimeter Length (FBT) = 145.9 ln.m. Beam FBT 20x40 0.15
# of Main Bar = 6.0 pcs. Stirrups(C-1) = 0.010
Total Length (FBT) = 875.43 m (Total) Ave. Spacing = 972.70
Ave. Cut Stirrups = 1.20
12Ø bars = 163.0 pcs. 10Ø bars = 195.0
5. Septic Vault
Flooring & Cover 2x
Width = 2.00 m/0.2 = 10.00 pcs. x 2.5m 25.0 4.17 9.00
Length = 3.00 m/0.2 = 15.00 pcs. x 1.5m 22.5 3.75 8.00
pcs. 10Ø 17.00
MATERIALS COST
Portland Cement 40kgs 947.0 bags
Sand(S-1) 81.0 cu.m.
Gravel(3/4) 96.0 cu.m.
16Ømm dia x 10.0m RSB 442.9 pcs.
12Ømm dia x 6.0m RSB 172.0 pcs.
10Ømm dia x 6.0m RSB 1,268.0 pcs.
Prime Deck Steel 0.5mm 196.2 ln.m.
Welding Rod Special(2.5kls.) 2.0 box
Flexibond Water Proof Deck and C.R. 3.0 tin
Sahara Cement(28sack) 5.0 box
Ga. 16 G.I. Tie Wire 6.0 rolls
Labor Computation
Quantity = 104.1 cu.m.
Labor Output = 2.25 cu.m/day
Manpower Required = 4.00 mason
7.00 laborer
Total Output = 2.25 cu.m./day
Duration = 46.26 days
Say = 50.00 days
Steel Reinforcement -placing, bending, splicing and lapping and Cutting Bars
Manpower Required = 2.0 Steelman
2.0 Helper
Duration = 50.0 days
LABOR COST
1.0 Foreman 50.0 days
1.0 Lead Man 50.0 days
2.0 Steelman 50.0 days
2.0 Laborer(Rein. Steel) 50.0 days
4.0 Mason(Concrete) 50.0 days
7.0 Laborer(Concrete) 50.0 days
2.0 Laborer(Sand&(3/4) Bagging) 33.0 days
EQUIPMENT COST
9 weeks 2.25month Fuel Expenses(Mixer,Vibrator) - ltrs
Misc. (Repair/tools :1-Bagger,Cut-off, Vibrator) (Varies)
SUMMARY
Labor Cost = 431,400.00
Materials Cost = 963,882.68
Equipment Cost = -
Total = 1,395,282.68
Unit Cost = 13,406.49
MATERIAL COST
Phenolic Plywood 1/2" 68.0 shts
2" x 3" x 12' coco lumber 600.0 pcs.
Concrete Nail Assorted 15.0 kls.
Common Nail #4 2.0 box
Common Nail #3 4.0 box
Common Nail #2 2.0 box
Nylon String #8 2.0 rolls
Ga. 16 G.I. Tie Wire 2.0 rolls
Level Hose 20.0 ln.m.
Misc. Items
LABOR COST
Supervision
1.0 Lead Man 15.0 days
Scaffolding and Formworks for Columns and Beam
1.0 Carpent/Mason 15.0 days
2.0 Laborer 15.0 days
Column, Stagging, Placing and Dismantling and Cutting Forms
2.0 Laborer 10.0 day
Scaffold Instalation of Form for 2nd Floor Slab and Deck Slab
2.0 Carpenter 10.0 days
2.0 Laborer 10.0 days
SUMMARY
Quantity:
CHB #4
Area = 112.33 say
Quantity = 112.33 x 12.50 = 1404.11 1,405 pcs.
Sand (chb/vol) = 1,405.00 x 0.0120 = 16.86 17 cu.m
Cement (1:4) = 16.86 x 9.00 = 151.74 154 bags
Steel Reinforcement
Area Method =
Total Area = 315.59
Spacing @ every 3 layers = 1.2m & 0.6m 0.96 m2
Eff. Length = 2.4 0.4 m lapping
No. of Full Length = 920.47 ÷ 5.70 = 161.5 pcs.
Provide, = 162.0 pcs. 10mm Dia.
MATERIAL COST
Portland Cement 40kgs 632.0 bags
Sand Mortar(S-1) 57.0 cu.m
Sand Plastering(Fine) 19.9 cu.m
CHB #6 2,543.0 pcs
CHB #4 1,405.0 pcs
10mm dia x 6.1m RSB 162.0 pcs
Sahara Cement(Fire Wall) 4.0 box
Ga. 16 G.I. Tie Wire 4.0 rolls
Labor Computation:
CHB Laying and Instalation of Scaffold Plastering Moulding & Ca
Quantity = 3,948 pcs Quantity
Capability = 60 pcs/day Capability
Manpower Required = 4.0 Mason Manpower Required
= 4.0 Laborer
Output = 240.0 pcs/day Output
Duration = 17.0 days Duration
LABOR COST
1.0 Lead Man 17.0 days
4.0 Mason(CHB Laying) 17.0 days
4.0 Laborer(CHB Laying) 17.0 days
3.0 Mason 23.0 days
3.0 Laborer 23.0 days
SUMMARY
Labor Cost = 140,350.00
Materials Cost = 344,362.85
Equipment Cost =
Total = 484,712.85
Unit Cost = 1,535.89
Quantity Take:
MATERIAL COST
Handrailing Stairs
2" x 3" x 1.5thk C-Purlins Galv 2.0 pcs.
2" x 2" x 1.5thk Tubular Frame Galv. 3.0 pcs.
SUMMARY
Contract Works(Labor) = 2,961.00
Materials = 8,460.00
Total = 11,421.00
Unit Cost = 1,427.63
VII. ROLL-UP DOORS, AWNING WINDOWS, FLASH DOORS
Qty = 3.00 Awning sets
3.00 Flash Door sets
3.00 Roll-Up Door sets
9.00
Contract Works Labor & Materials:(Windows & Sliding Door Analoc Frame) > (798 Series)
MATERIALS COST
A. Electrical Linning, Outlet Switch, Panel board(7x7)
8.0 pcs. Square Box 4x11x16
2.0 rolls F. Hose 1/2 x 50m
4.0 rolls THHN Wire #14, 2.0mm2 Philex
3.0 rolls THHN Wire #12, 3.5mm2 Philex
1.0 rolls THHN Wire #8, 8.0mm2 Philex
3.0 Unit Panel Board 10 x 10
18.0 pc. PVC Junction Box
15.0 pcs. Orange pipe 1/2
10.0 pcs. Orange pipe 1
54.0 pcs. PVC Utility Box
8.0 pcs. Elbow Long 1/2
3.0 pcs. Electrical Tape (Big)
LABOR COST
Electrician(Pakyaw) 18.0 Holes
3.0 P. Board
1.0 Entrada Line
Quantity :
MATERIALS COST
Tiles:Floor,Stair,Comfort Room
Sum Rough Surface Porcelain Tiles (40x40) 1,024 pcs.
Fine Sand Bag(S-1) 12.0 cu.m.
Tile Ordinary Tile Adhesive 50.0 bags
Tile Grout(Color Varies) 4.0 bags
Stone Diamond Disc. 5.0 pcs.
MISC. ITEMS
LABOR COST
X. PLUMBING WORKS
Qty = 3.00 units
MATERIALS COST
Drainage Pipe(Orange Pipe)
PVC Pipe 4X10 S-600 12.0 pcs.
PVC Pipe 3X10 S-600 8.0 pcs.
PVC Pipe 2X10 S-600 8.0 pcs.
Elbow 90▫ x 4 18.0 pcs.
Elbow 45▫ x 4 10.0 pcs.
Elbow 90▫ x 3 16.0 pcs.
Elbow 45▫ x 3 10.0 pcs.
Elbow 45▫ 2 20.0 pcs.
Elbow 90▫ 2 12.0 pcs.
P-Trap 2" 16.00 pcs.
Tee 3X3 8.00 pcs.
Tee 2X3 6.00 pcs.
Tee 4X4 6.00 pcs.
Tee 3X4 5.00 pcs.
Solvent 400cc 6.00 can
Sealant Clear 6.00 tubes
Clean Out 3" 4.00 pcs.
Wye Orange 4x4 4.00 pcs.
Wye Orange 4x2 6.00 pcs.
Wye Orange 3x2 3.00 pcs.
MATERIAL COST:
Preparation Items
Flexibond
(Water Proofing Fire Wall and C.R.) 4.0 tins
D/V Flat Latex(White) 4.0 tins
Liquid Tile Primer 16.0 gals
Liquid Tile Reducer 16.0 gals
Concrete Expoxy 2.0 tins
B/S Masonry Putty 3.0 tins
Stal. Laquer Thinner 3.0 gals
B/S 690 Primer(Gray) 1.0 gal
Turco Rust Remover 1.0 gal
D/S Mondo Skimcoat(Interior/Exterior) 35.0 bags
Color Items
Exterior
S&R Smoke Gray 1.0 tins
S&R Seal Gray 1.0 gal
S&R Gray Delight 1.0 gals
S&R Mud O' Pie 1.0 gal
S&R Rose White 1.0 gal
S&R Mocha Blanch 2.0 gal
S&R Bone Ivory 2.0 ltrs
Interior
LABOR COST
3.0 Painter 21 days
3.0 Laborer Helper 21 days
EQUIPMENT COST
SUMMARY
Labor Cost = 75,600.00
Materials Cost = 91,574.00
Equipment Cost = -
Total = 167,174.00
Unit Cost = 264.86
SUMMARY
CONTRACT LABOR & MATERIALS = 37,500.00
Total = 37,500.00
Unit Cost = 12,500.00
*SUMMARY*
DESCRIPTION
I. MOBILIZATION(CLEARING/REMOVAL OF EXISTING STRUCTURE) 246.7 SQ.M. 612.0
II. EARTHWORKS(EXCAVATION AND EMBANKMENT) 173.6 CU.M. 466.2
III. CONCRETE WORKS: FOOTING (F1,F2,F3,WF,FTB,COLUMN(C1,C2,C3 a 104.1 CU.M. 13,406.4
IV. FORMWORKS AND SCAFFOLDING 135.5 SQ.M. 1,493.47
V. MASONRY WORKS 315.6 SQ.M. 1,535.89
VI. HANDRAILINGS 8.0 SQ.M. 1,427.63
VII. ROLL-UP DOORS, AWNING WINDOWS, FLASH DOORS 3.0 SETS 24,350.0
VIII. ELECTRICAL WORKS 18.0 HOLES 4,994.17
IX. TILE WORKS 156.0 SQ.M. 1,641.81
X. PLUMBING WORKS 3.0 UNITS 28,238.33
XI. PANTING WORKS 631.2 SQ.M. 264.86
XII. CARPENTRY AND HARDWARES 3.0 SETS 12,500.00
188.4 W.D.
6.08 months
3,610.00
15,000.00
65,000.00
Sub-Total = 83,610.00
= -
Sub-Total =
/kl. = -
/kl. = -
/roll = -
Sub-Total = -
44.62%
55.38%
100.00%
/ sq.m.
Manhole 5.0 sets
Width = 0.6 m
Length = 0.6 m
Depth = 0.6 m
Volume = 1.1 cu.m
III. Emabankment:
Quantity = 68 0
Labor Output = 1.2 cu.m
Manpower Req'd = 4.0 laborer
Total Output = 4.8 cu.m./day
Duration = 14.2 days
+ = 3 days Compacting and Spreading
Say = 17.2 days
70.28%
29.72%
24,060.06
0.00%
100.00%
/ cu.m
3. Columns
C-1 Iso(C1-4.9m) = 20.0 sets 104.08
m Base = 0.20 m Accomplish Vol. Cement Used
m Width = 0.45 m #REF! #REF!
m (Total) Ht. Fr. Ftg to Top Accomplish %. Item Percentage Plan
Wall Beam = 4.90 m
cu.m. #REF! 26.27%
Volume = 8.82 cu.m
52.222222222222
Øm
m (Total) 376
m O.C. 150.4
m 25.066666666667
pcs.
ln.m.
ave. spacingO.C. 6
Øm
m O.C. 12
ln.m.
ave. spacingO.C. 6
Øm
m O.C. 12
m x 973pcs. = 1167.24 ln.m.
pcs. 0.05
6. Manhole Cover
Floor & Cover = 10.00 sets
# of 10Ø(0.15) = 80.00 pcs.
Cut Length = 0.60 m
# of 10Ømm = 16.00 pcs.
ln.m.
ave. spacingO.C. 6
Øm
m O.C. 12
m x 1132pcs. 1358.056 ln.m.
pcs. 0.05
5.905
Øm #REF!
m2 (Total)
m2 (Space) 2nd Flr
m 6.585
pcs. 5.905
pcs. 38.884425
pcs. 16Ø 6.8
pcs. 10Ø
pcs. 10Ø
pcs. 12Ø
pcs. 10Ø
pcs. 10Ø
Sub Total -
30.92%
69.08% 100.00%
0.00%
100.00%
/cu.m
120.0
30.50%
69.50%
0.00%
100.00%
/sq.m
CHB#4
Area Elev.
112.329 m2
28.96%
71.04%
0.00%
100.00%
/SQ.M.
m 4
m
25.93%
74.07%
100.00%
/m2
15,500.0 /sets = 46,500.00 2.25
1,850.0 /set = 5,550.00
3,500.0 /set = 10,500.00
= 6,000.00
= 4,500.00
Sub-Total: 73,050.00
100.00%
100.00%
/set
12.35%
87.65%
100.00%
/Holes
0.075
/sq.m.
0.7389920968901
6,500.0 /unit = 19,500.00
5,500.0 /unit = 16,500.00
Sub Total = 36,000.00
42.50%
57.50%
100.00%
/unit
.
.
3,150.00 /tin = 12,600.00 .
2,850.0 /tin = 11,400.00
750.0 /gal = 12,000.00 .
420.0 /gal = 6,720.00 .
3,250.0 /tin = 6,500.00 .
2,750.0 /tin = 8,250.00 .
280.0 /gal = 840.00
480.0 /gal = 480.00
760.0 /gal = 760.00
500.0 /bags = 17,500.00
100.00%
100.00%
/sets
UNIT COST
612.06 /SQ.M. 150,970.00 16.0 days
466.29 /CU.M. 80,955.66 18.4 days
13,406.49 /CU.M. 1,395,282.68 50 days
1,493.47 /SQ.M. 202,430.00 15 days
1,535.89 /SQ.M. 484,712.85 17 days
1,427.63 /SQ.M. 11,421.00 7 days
24,350.00 /SETS 73,050.00 7 days
4,994.17 /HOLES 89,895.00 16 days
1,641.81 /SQ.M. 256,122.00 - days
28,238.33 /UNIT 84,715.00 12 days
264.86 /SQ.M. 167,174.00 21 days
12,500.00 /SET 37,500.00 9 days
Sub Total: 3,034,228.19 188 days
Contract Cost: 3,600,000.00 6.08 Month
Contingencies Profit: 565,771.81
entage Plan
100.00%
#REF!
#REF!
Ave
4 0.2 #REF!
Ave
4 0.2 #REF!
Ave
4 0.2 #REF!
MONTHLY PROGRESS
Projected 3.40% 2.05% 12.96% 14.73%
PHYSICAL ACCOMPLISHMENT
Actual 1.54% 2.05% 2.05% 6.46%
CUMMULATIVE
Projected 3.40% 5.45% 18.41% 33.14%
Actual 1.54% 3.59% 5.64% 12.10%
MONTHLY PROGRESS
Projected 122,248.86 73,915.64 466,432.45 530,343.51
FINANCIAL ACCOMPLISHMENT
Actual 55,339.41 73,820.94 73,820.94 232,556.14
CUMMULATIVE
Projected 122,248.86 196,164.51 662,596.96 1,192,940.47
Actual 55,339.41 129,160.35 202,981.29 435,537.43
2022
2nd Month (August. 14 to Sept. 10) 3rd Month (Sept. 11 to Oct. 8)
W5 (14 to 20) W6 (21 to 27) W7 (28 to 3) W8 (4 to 10) W9 (11 to 17) W10 (18 to 24) W11 (25 to 1) W12 (2 to 8)
14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8
################## 1.80%
##################### 0.65%##################### 0.65%### 0.09%
### ### ### ### ### 8.4% ### ### ### ### 6.74%
###### ### ### ### ### ### 4.52% ### ### ### ############ 4.52% ############ 2.58%
### ### ### ### 1.41% ##################### 2.46%
### ### 1.12% ### 1.12% ### ### 0.56%
##################### 5.89% ################## 5.05%
0 ### ### ### 2.69%
############ 0.32%
### ### ### ### ### ### 1.01% ### ### ### ############ 1.18%### 0.17%
######### 1.18% ### ### ### 1.18% ### ### ### 1.18%
##################### 0.61%
DURATION
2022
4th Month (Oct. 9 to Nov. 5) 5th Month (Nov. 6 to Dec. 3)
W13 (9 to 15) W14 (16 to 22) W15 (23 to 29) W16 (30 to 5) W17 (6 to 12) W18 (13 to 19) W19 (20 to 26) W20 (27 to 3)
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3
######### 2.52%
###### 2.03%
### ### ### ### ### ### ### 2.17% ### ### ### ### ### ### ### 2.17%
0.00%
6th Month (Dec. 4 to Dec. 31) 7th Month (Jan. 1 to Jan. 14)
W21 (4 to 10) W22 (11 to 17) W23 (18 to 24) W24 (25 to 31) W25 (1 to 7) W26 (8 to 14)
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14
### ### ### ### ### ### ### 2.17% ### ### 0.62%
### ### ### ### ### ### 1.11% ### ### ### ### ### ### 1.11% ### ### ### ### ### ### ### 1.30% ### ### ### ### ### ### 1.11%
### ### ### ### ### ### 0.63% ### ### ### ### 0.42%