You are on page 1of 1

Pt A, Ch 2, Sec 5

Table 3 : Minimum requirements for thickness measurements for column-stabilized


and TLP units at class renewal survey

Age of the unit (years)


age ≤ 5 5 < age ≤ 10 10 < age ≤ 15 age > 15
Suspect areas Suspect areas Suspect areas Suspect areas
Columns and bracings Representative gaugings of col- Representative gaugings, Comprehensive gaugings,
where wastage is evident in umns and bracings in Splash throughout, of special and pri- throughout, of special and pri-
Splash Zone Zone together with internals in mary application structures mary application structures
way as deemed necessary
Special and primary applica- One Transverse Section (Girth One Transverse Section (Girth
tion structure where wastage is Belt) of each of 2 columns and 2 Belt) of each of one-half of the
evident bracings in Splash Zone columns and bracings in Splash
together with internals in way as Zone and internals in way as
deemed necessary deemed necessary (i.e., gauge
half of the unit's columns and
bracings in Splash Zone).
Lower hulls in way of mooring Lower hulls in way of mooring
lines where wastage is evident lines where wastage is evident
One Transverse Section (Girth One Transverse Section (Girth
Belt) of each lower hull Belt) of each lower hull
between one set of columns between one set of columns
Representative gaugings of sub-
structure of drilling derrick
Note 1: Structural application designation (Special, Primary, Secondary) are defined in [4.3.1] and [4.3.4].

4.1.5 A survey planning meeting is to be held prior to the 4.2.2 The examinations of the hull are to be supplemented
commencement of the survey. by thickness measurements and testing as required, to verify
the structural integrity. The aim of the examination is to dis-
4.1.6 When considered necessary by the Society the inter- cover excessive diminution, substantial corrosion, signifi-
val between class renewal surveys may be reduced. cant deformation, fractures, damages or other structural
deterioration, that may be present.

4.1.7 Class renewal survey requirements of units of unusual 4.2.3 The class renewal survey is to include examination of
design, in lay-up or in unusual circumstances will be deter- underwater parts as outlined in Article [7].
mined on an individual basis.
4.3 Class renewal survey No.1 - Hull structure
4.1.8 At the request of the Owner, and upon the Society's and equipment
approval of the proposed arrangements, a system of contin-
uous survey may be undertaken whereby the class renewal 4.3.1 All drilling units
survey requirements are carried out in regular rotation to The following parts are to be examined:
complete all the requirements of the particular class
a) The hull or platform structure including tanks, watertight
renewal survey within a five year period. Any defects that
bulkheads and deck, cofferdams, void spaces, sponsons,
may affect classification found during the survey, are to be chain lockers, duct keels, helicopter deck and its sup-
reported to the Society and dealt with to the satisfaction of porting structure, machinery spaces, peak spaces, steer-
the Surveyor. ing gear spaces, and all other internal spaces are to be
examined externally and internally for damage, frac-
tures, or excessive diminution. Thickness gauging of
4.2 Scope
plating and framing may be required where wastage is
evident or suspected.
4.2.1 The class renewal surveys shall include, in addition
b) All tanks, compartments and free-flooding spaces
to surveys outlined in Article [2], the following examina-
throughout the drilling unit are to be examined exter-
tions, tests, and checks of sufficient extent to verify that the
nally and internally for excess wastage or damage.
hull, structure, equipment, and machinery are in satisfac-
tory condition in compliance with the applicable Rule c) Internal examinations of spud cans and mats may be
requirements for the new period of class of 5 years to be specially considered.
assigned, subject to proper maintenance and operation and d) Watertight integrity of tanks, bulkheads, hull, decks and
the periodical surveys carried out at the due dates. other compartments is to be verified by visual inspection.

74 Bureau Veritas - Rules for Offshore Units December 2016

You might also like