List of construction activities in sequence

When we start construction of a new building or home, we face many difficulties a

Construction activities in sequence

First of all you should ensure that your plot falls in Residential Zone.
You should check whether the building site come in earthquake prone zone.
Hire the architect for preparing drawings of the building to be constructed.
Hire Structural engineer for structural design and keep safety from earth quack.
Submit the drawings for approval by competent authority of the city concerned.
Arrange water connection and electricity connection and ensure that water .
Construct temporary store for storing building material required during constructio
Arrange contractor i.e. for civil work, electrical work and water supply and sewerag
Make arrangement for building material i.e. bricks bazri, sand brick ballast etc. You
After arranging the drawings, design, necessary sanctions and contractor start the
The site should be cleared from the roots of the trees if any exist in construction s
There should be proper layout with brick masonry pillars/ burzi with centre line, wid
The area under construction should be taken as whole not part to avoid settlemen
The entire building component should be tied from the safe guard of earthquake a
After laying foundation as per drawing, you should have knowledge of high flood le
RCC columns footing should be done simultaneously with wall masonry in founda
It should be ensure that concreting should be done with concrete mixture and vibr
Bricks used in construction should be first class bricks.
While brick masonry see the bricks are properly water soaked, mortar is as per str
See that Door and window frame should be fixed with brick work.
Shuttering should be done with steel plates and it should be in level.
See that MS steel bars in roof should be according to design and binding is in pro
Lay cement concrete of roof with concrete mixer and vibrated and thickness and s
Curing should be done as per norm for all component of building.
See that all electrical pipes, fan hooks are laid as per drawing before laying the sla
After removal of shuttering all the electrical and water supply point should be fixed
After doing plaster, lay sewer line before start of floor.
See that soil and base coat is fully compacted before start of floor.
After floor laying, door and window shutter should be fixed with necessary fittings.
At roof parapet and tile terracing should be done and ensure that slope of the roof
After fixing electrical points and water supply points, painting should be started.
Final grinding and polishing of floor is done.
Fix all electric fitting like AC, Fans and light point.
Fix all the bib cocks and other fitting such as looking mirror, towel rod, bath tub etc
See all the points of electrical, water supp
e face many difficulties and unnecessary harassment in day to day construction. Everyone wants that construction work should

ential Zone.
hquake prone zone.
o be constructed.
afety from earth quack.
of the city concerned.
ensure that water .
quired during construction.
water supply and sewerage work.
sand brick ballast etc. You should aware about the quality of materials, their availability and repudiated building material supplie
ns and contractor start the construction activities.
ny exist in construction site. The roots should be removed up to 3feet below the ground level.
burzi with centre line, width and length of walls, columns and they should be according to design and drawing. Mark them on t
ot part to avoid settlement in any portion of building. If construction done in small portion than there may be chances of settlem
afe guard of earthquake at least on three points i.e. at plinth level, door level and roof level.
knowledge of high flood level of the area and fix it with the level of surrounding building and road.
h wall masonry in foundation.
concrete mixture and vibrated.

aked, mortar is as per structure drawing and all joints should be filled properly.

be in level.
sign and binding is in proper shape.
ated and thickness and size should be according to design.

wing before laying the slab.


pply point should be fixed in walls before plaster.

d with necessary fittings.


sure that slope of the roof is proper for drainage of rain water through rain water pipes.
ting should be started.

or, towel rod, bath tub etc.


construction work should be completed with the minimum difficulties and in time. For this we have requires a lot of work to be d

d building material supplier.

drawing. Mark them on the ground and cross check to eliminate any error.
ay be chances of settlement in foundation.
quires a lot of work to be done before start of the work and simultaneously during construction. There are some points given be
are some points given below which are to be follow in sequence.