Bridge Information Modeling - BrIM

Industry Facts

10% 90%
of materials of projects
are wasted are late

30% 40% 40%


of construction of jobsite work of projects are
is rework is unproductive over budget
Industry Challenges
Waste
Materials wasted

Rework
Big amount of rework
LACK OF
ACCURATE,
CONSISTENT, Overbudget
CONSTRUCTIBLE Projects are over budget
AND SHAREABLE
DATA Delays
Projects are late

Unproductivity
Jobsite work is inefficient
Transformation Stages in Construction

Collaborative
CAD BIM
BrIM

• Paper centric • Growing performance pressure •Sharing digital information


• 2D models or 3D only for • Growing quality requirements •Managing projects with data
convenience • Accumulated information used •Automated manual routines
• Data lost between the phases by many stakeholders (sensors, robotics)
•Transparency increases trust
• Inefficient processes • Forerunners gain competitive
edge •Improved project deliveries
• Low technology investments
• Still legal requirements • New players challenging the
traditional ones
Bridge Information Modeling (BrIM)
IFC Bridge Standards

Benefits:
• Increase of productivity
Data Creation
• Improvement in efficiency
• Cost savings
• Breaking down barriers to
international trade

Data Sharing
BrIM:
• Common File Format
• Single Data Input & Digital Deliverables
• Online Collaboration During Entire Bridge Lifecycle
The BrIM Future Lies in Data Consumption

1 2 3
Designing to Build Consuming the Data Smart Asset Management