C. STRIPPING OF FORMS
WALL ON GROUND SQ.M. 0.50
WALL ABOVE 10' SQ.M. 2.58
BEAMS SQ.M. 2.06
COLUMNS SQ.M. 1.70
SUSPENDED SLAB SQ.M.
0 TO 18' SQ.M. 1.67
18' TO 36' UP SQ.M. 2.16
ELEVATED AND SHORED SLAB FORMING SQ.M.
STRIP OF FORMS SQ.M. 7.00
FLOOR SLAB AT GRADE STRIP OF FORMS SQ.M. 5.60
G. TINSMITHING WORK
CORR GI SHEETS:
LIFTING SQ.M. 2.16
INSTALLATION SQ.M. 6.12
INSTALLATION OF ASBESTOS ROOFING SHT. 2.00
INSTALLATION OF ALUMINUM GI SHEET SHT. 1.60
COPPER CLADDING ROOF DECK L.M. 1.01
FAB, GI GUTTER SHT. 6.94
GI SHEET ROOFING SHT. 1.64
FAB OF GI GUTTER L.M. 1.05
FAB. GI DOWNSPOUT L.M. 1.94
GUTTER CUT & SHAPE L.M. 0.32
INST. OF GUTTER L.M. 1.78
DOWNSPOUT CUT AND SHAPE L.M. 0.59
DOWNSPOUT INSTALLATION L.M. 0.27
CORR. GI ROOFING SQ.M. 3.60
CORR ALUMINUM ROOFING SQ.M. 3.60
BUILT UP ROOFING 4 PLY SQ.M. 17.00
PROTECTED METAL SQ.M. 4.00
CORR. ASBESTOS INST., LIFTING & HAULING SQ.M. 3.40
LEADERS & GUTTERS SQ.M. 1.20
I. EARTH WORKS
MACHINE EXCAVATION:
SAND CU.M. 1.20
SAND AND MARL CU.M. 1.60
MARL CU.M. 2.20
GRANULAR BACKFILL CU.M. 2.40
GRANULAR SOIL BACKFILL CU.M. 3.00
MANUAL FOUNDATION EXCAVATION & BACKFILL:
SAND CU.M. 8.00
EXCAVATION OF SAND &MARL CU.M. 13.00
EXCAVATION OF MARL CU.M. 21.00
BACKFILL OF SAND CU.M. 11.00
BACKFILL OF SAND &MARL CU.M. 16.00
BACKFILL OF MARL CU.M. 24.00
FLOOR SLAB & GRADE:
GRADING MANUAL SQ.M. 2.60
EXCAVATION AND BACKFILL CU.M. 36.00
FINE GRADING & FINISHING
GRADING MANUAL SQ.M. 0.90
FINISHING SOIL SURFACE SQ.M. 1.10
DIKES CU.M. 2.40
J ROAD WORKS
BASE COURSE SQ.M. 0.24
CURBS & GUTTER CU.M. 3.60
4" THK ROAD SQ.M. 2.60
6" THK ROAD SQ.M. 2.80
8" THK ROAD SQ.M. 3.00
TROWEL FINISH SQ.M. 0.64
SPECIAL TOPPING SQ.M. 2.40
4" STONE OR SHELL ROAD SQ.M. 0.64
6" STONE OR SHELL ROAD SQ.M. 0.84
8" STONE OR SHELL ROAD SQ.M. 1.04
ACID PROOFING CU.M. 1.20
ASPHALT PAVING:
FINE GRADING & FINISHING SQ.M. 0.84
PLACE BASE COURSE SQ.M. 0.40
ASPHALT SQ.M. 0.40
ACID BLOCK OR PAVING BLOCK:
FIND GRADING SQ.M. 0.84
INSTALL BRICK SQ.M. 8.40
CRUSH STONE OR SHELL SURFACING
FINE GRADING SQ.M. 0.64
PLACE SPREAD AND COMPACT STONE TO 4" SQ.M. 0.84
OVER 9" THK SQ.M. 1.04
TANK CUSHION
SAND CUSHION CU.M. 1.40
APHALT RETAINER RING SQ.M. 0.40
NON GRANULAR BACKFILL CU.M. 4.00
EXCAVATION MANUAL:
COMMON EARTH CU.M. 16.00
LOAN OF SAND CU.M. 2.62
CLAY OR HEAVY SOIL ROCK CU.M. 3.28
ROCK CU.M. 5.26
MECHANICAL EXCAVATION
COMMON EARTH CU.M. 13.34
ROCK W/ JACKHAMMER CU.M. 33.34
BACKFILLING
COMMON MANUAL CU.M. 1.64
GRAVEL FILL MANUAL CU.M. 10.00
TRENCHING AND BACKFILLING OF UNDERGROUND
PIPING USING EXCAVATION MATERIALS MANUAL
FROM 0 TO 2 MTRS. DEPTH L.M. 2.50
2 TO 3 L.M. 3.34
3 TO 4 L.M. 5.00
4 TO 5 L.M. 6.66
PLACING BINDER GRAVEL CU.M. 0.21
ESCOMBRO BACKFILLING CU.M. 0.42
SPREADING, TAMPING AND GRADING SQ.M. 0.96
MECHANICAL COMPACTION, PLATE COMPACTION CU.M. 0.11
MANUAL CLEARING AND GRUBBING
CLEARING UNDERGROWTH AND TREES 12" SQ.M. 0.1
CLEARING UNDERGROWTH AND SHRUBS SQ.M. 0.06
DISPOSAL OF SOIL CU.M. 3.38
MAULING OF SOIL CU.M. 2.00
GRAVEL FILL CU.M. 4.14
EXCAVATION CRANE AND CLAMPSHELL
. WITH 8-MEN AND 2 CARPENTERS CU.M. 2.14
L. TRADE INSULATION
EQUIPMENT INSTALLATION
VESSEL, EXCHANGE & TANKS
FIELD FABRICATION INSULATION S.M. 5.00
FIELD FABRICATION SHEET METAL COVER S.M. 24.00
APPLY INSULATION S.M. 10.00
APPLY SHEET METAL COVER S.M. 10.00
PUMPS, COMPRESSORS & TURBINES
FABRICATE S.M. 34.00
APPLY S.M. 60.00
PIPINGS AND COMPONENT INSULATION
FIELD FABRICATE FLG. 8.00
FIELD FABRICATESHEET METAL COVER S.M. 1.60
APPLY INSULATION L.M. 5.40
APPLY SHEET METAL COVER OR METAL COVER EACH 3.00
FABRICATE INSTRUMENT COVER EACH 16.00
INSTALL INSTRUMENT COVER EACH 12.00
INSULATE PIPE HANGERS EACH 8.00
FOR STREAM TRACED LINES L.M. 7.40
REMOVAL OF OLD OR EXISTING INSTALLATION L.M. 3.00
M. TRADE:FIRE PROOFING
INSTALL STUDS EACH 1.00
INSTALL MESH S.M. 2.40
POURED
FORMING S.M. 28.00
STRIP FORMS S.M. 12.00
POUR CONCRETE S.M. 140.00
CURING/PATCHING S.M. 1.20
FINISHING S.M. 1.40
TROWEL, PLASTERED S.M. 5.40
PNEUMATIC APPLICATION
GUNITE S.M. 2.40
APPLY FINEBRICK OR BLOCK PC. 1.60
REMOVAL OF EXISTING OR OLD FIREPROOFING S.M. 5.00
APPLY FIREPROOFING PAINT S.M. 6.00
FIRE PROTERCTION:
FIRE PROTECTION EQUIPMENT INSTALLATION:
MONITOR EACH 10.00
HOSE REELS AND CARTS EACH 30.00
FIRE EXTINGUISHERS EACH 10.00
PERSONAL EQUIPMENT:
EYE WASH EACH 20.00
SAFETY SHOWERS EACH 20.00
BREATHING APPARATUS EACH 10.00
SPRINKLER SYSTEM
SPRAY NOZZLES EACH 2.00
WATER CANNONS EACH 10.00
N. TRADE:PERMANENT FENCING
INSTALL FENCE L.M. 2.40
INSTALL GATES L.M. 6.00
TO RAIL L.M. 0.60
BARBE WIRE, 3 STRANDS L.M. 0.60
O. TRADE:PAINTING WORKS
NEW STRUCTURAL STEEL TON 20.00
OLD STRUCTURAL STEEL S.M. 1.10
NEW FLAT FLAT PLATES S.M. 0.64
SURFACE PREPARATION:
IN TERMS OF WEIGHT TON 16.00
IN TERMS OF AREA S.M. 0.86
SAND PREPARATION TON 60.00
Q. MISCELLANEOUS
WATER STOP INSTALLATION L.M. 1.34
CAULKING SLAB JOINT L.M. 0.40
ASPHALTING S.M. 1.60
GROUTNG AND TOOL PLASTERING S.M. 3.34
WATER PROOFING RUBBERIZED S.M. 1.10
COPPER CLADDING ROOF DECK L.M. 1.00
WATER PROOFING FLINKOTE S.M. 0.54
DEMOLITION OF ADOBE WALL CU.M. 3.20
PAINTING S.M. 0.68
COPPER WATER STOP CUT AND SHAPE L.M. 11.00
COPPER WATER STOP CUT AND INSTALLATION L.M. 22.00
SETTING ANCHOR BOLT KG 97.00
SETTING ANCHOR BOXES CU.M. 3.64
MANHOURS PER QUANTITY (M.H./UNIT)
AVERAGE HIGH
2.00 1.60
2.35 1.88
3.08 2.46
2.35 1.88
1.67 1.34
3.33 2.66
9.00 6.88
11.00 8.80
0.60 0.40
1.08 0.86
0.25 0.20
1.29 1.03
1.03 0.82
0.85 0.68
0.83 0.67
1.08 0.86
3.50 2.80
2.80 2.24
1.00 0.80
0.14 0.11
0.36 0.29
0.27 0.21
0.97 0.77
0.43 0.34
0.35 0.28
0.80 0.64
0.21 0.17
0.13 0.11
0.27 0.10
0.46 0.36
1.00 0.80
0.42 0.33
1.33 1.06
1.00 0.90
0.13 0.10
0.18 0.14
0.50 0.40
7.00 5.60
4.50 3.60
3.50 2.80
0.40 0.32
2.00 1.60
4.63 3.70
3.12 2.50
4.63 3.70
3.12 2.50
3.38 2.70
10.00 8.00
12.00 9.60
10.00 8.00
25.00 20.00
0.31 0.25
1.60 1.28
0.22 0.18
0.33 0.26
3.12 2.50
1.67 1.34
1.43 1.34
2.00 1.60
5.00 4.00
10.53 8.42
4.35 3.48
3.00 2.40
4.50 3.60
4.00 3.20
0.50 0.40
3.00 3.40
2.00 1.60
1.20 0.96
1.80 1.44
9.50 6.80
1.14 0.91
0.72 0.57
1.60 1.28
1.33 1.06
2.00 1.60
5.33 4.26
5.97 4.78
1.08 0.86
3.06 2.45
1.00 0.80
9.80 0.64
0.51 0.40
3.47 2.78
0.82 0.66
0.53 0.42
0.97 1.78
0.16 0.13
9.00 0.71
0.30 0.24
0.13 0.11
1.80 1.44
1.80 1.44
8.50 6.80
2.00 1.60
1.70 1.36
0.60 0.48
5.00 4.00
25.00 20.00
1.00 0.80
1.43 1.14
0.07 0.06
0.08 0.06
0.10 0.08
16.00 12.80
1.80 1.44
7.00 5.60
14.00 11.20
27.00 21.60
2.80 2.24
21.00 16.80
0.53 0.42
0.33 0.26
0.60 0.48
0.80 0.64
1.10 0.88
1.20 0.96
1.50 1.20
4.00 3.20
6.50 5.20
10.50 8.40
5.50 4.40
8.00 6.40
12.00 9.60
1.30 1.04
18.00 14.40
0.45 0.36
0.55 0.44
1.20 0.96
0.12 0.10
1.80 1.44
1.30 1.04
1.40 1.12
1.50 1.20
0.32 0.26
1.20 0.96
0.32 0.26
0.42 0.34
0.52 0.42
0.60 0.48
0.42 0.34
0.20 0.16
0.20 0.16
0.42 0.34
4.20 3.36
0.32 0.26
0.42 0.34
0.52 0.42
0.70 0.56
0.20 0.16
2.00 1.60
8.00 6.40
1.31 1.05
1.64 1.31
2.63 2.10
6.67 5.34
16.67 13.34
0.82 0.66
5.00 4.00
1.25 1
1.67 2.34
2.5 2
3.33 2.66
0.11 0.08
0.21 0.17
0.48 0.38
0.06 0.04
0.05 0.04
0.03 0.02
1.69 1.35
1.00 0.8
2.07 1.66
1.07 0.86
0.66 0.53
0.66 0.53
0.74 0.59
0.82 0.66
0.98 0.70
1.08 0.86
1.15 0.92
1.32 1.06
2.19 1.75
3.29 2.63
4.92 3.94
6.57 5.26
9.85 7.98
10.31 8.25
12.05 9.64
13.69 10.95
15.34 12.27
16.43 13.14
18.07 14.46
20.54 16.43
0.19 0.15
0.74 0.59
0.82 0.66
0.98 0.78
1.08 0.86
1.31 1.05
1.64 1.31
2.46 1.97
4.00 3.20
6.40 5.12
10.67 8.54
1.33 1.06
8.00 6.40
12.00 9.60
24.00 19.20
16.00 12.80
10.00 8.00
36.00 28.80
24.00 19.20
14.00 11.20
14.00 11.20
26.00 20.80
13.00 10.40
9.00 6.40
2.00 1.60
8.00 6.40
4.00 3.20
6.40 5.12
10.66 8.53
2.50 2.00
12.00 9.60
5.00 4.00
5.00 4.00
17.00 13.60
30.00 24.00
4.00 3.20
0.80 0.64
2.70 2.16
1.50 1.20
8.00 6.40
6.00 4.80
4.00 3.20
3.70 2.96
1.50 1.20
0.50 0.40
1.20 0.96
14.00 11.20
6.00 4.80
70.00 56.00
0.60 0.48
0.70 0.56
2.70 2.16
1.20 0.96
0.80 0.64
2.50 2.00
3.00 2.40
5.00 4.00
15.00 12.00
5.00 4.00
10.00 8.00
10.00 8.00
5.00 4.00
1.00 80.00
5.00 4.00
1.20 0.96
3.00 2.40
0.30 0.24
0.30 0.24
1.00 9.00
0.55 44.00
0.32 26.00
8.00 6.40
30.00 0.34
24.00
3.50 2.80
6.00 4.80
18.00 14.40
24.00 19.20
12.00 9.60
5.00 4.00
8.00 6.40
7.30 5.84
24.00 19.20
8.00 6.40
3.50 2.80
0.67 0.54
0.20 0.16
0.80 0.64
1.67 0.84
0.55 0.28
0.50 0.25
0.27 0.14
1.60 0.80
0.34 0.17
6.00 0.03
11.00 0.06
49.00 0.24
1.82 0.91
A. STRIPPING OF METAL FORMS
CREW: TOOLS:
1 CARPENTER LEAD MAN 8 ONE LOT CARPENTRY TOOLS
3 CARPENTERS 24 8 TOOLS HOUR
6 HELPERS 48
10 MANDAYS 80 MANHOURS
MAN-HOURS EQUIPMENT-HOURS
LOW AVERAGE HIGH LOW
MEDIUM FRAME 36.00 13.85 10.00 7.00
HEAVY FRAME 32.73 12.63 9.11 6.36
STEEL JOIST 40.00 15.37 11.08 7.78
CREW: TOOLS:
1 LEAD MAN 8 0.50 TOWER CRANE
4 RIGGERS 32 2.00 WELDING TRANSFORME
4 FITTERS 32 1.00 LOT TOOLS
2 WELDERS 16 3.50
1 CRANE OPERATOR 8
6 HELPERS 48
18 MANDAYS 144 MANHOURS
MAN-HOURS EQUIPMENT-HOURS
LOW AVERAGE HIGH LOW
CREW: TOOLS:
1 LEAD MAN 8 0.50 20 TON TOWER CRANE
2 RIGGERS 16 2.00 WELDING TRANSFORME
4 FITTERS 32 2.00 CUTTING OUTFIT
2 WELDERS 16 1.00 LOT TOOLS
1 CRANE OPERATOR 8 5.50 EQPT. DAYS
4 HELPERS 32
14 MANDAYS 112 MANHOURS
EQUIPMENT-HOURS
AVERAGE HIGH
2.69 1.94
2.46 1.77
2.98 2.15
7.10 5.12
6.11 4.40
5.24 3.79
6.47 4.68
5.24 3.79
4.68 3.38
4.23 3.06
5.00 3.61
PROJECT TITLE:
LOCATION:
ITEM NO. ITEM OF WORK:
ESTIMATED QUANTITIES: UNIT:
A. MATERIALS:
DESCRIPTION QTY. UNIT UNIT COST
B. LABOR/MANPOWER:
NO. DESCRIPTION NO. NO.-DAYS DAILY RATE
C. EQUIPMENT/TOOLS:
NO. DESCRIPTION NO. NO.-DAYS HOURLY RATE
D TOTAL DIRECT COST (A+B+C)
E O.C.M. (% of D)
F CONTRACTIRS PROFIT (% OF D)
G VAT (10% Oof B+C)
H TOTAL COST (D+E+F+G)
I UNIT COST ( DIRECT)
AMOUNT
AMOUNT
AMOUNT
PROBABLE OUTPUT OF HEAVY EQUIPMENT
D. GRADER- 130G
10 Passes 700.00 sq.m./hr 0.001 hr/m²
Subgrading 300.00 sq.m./hr 0.003 hr/m²
Spreading 40.00 cu.m./hr. 0.025 hr/m³
ASPHALT PAVER
ASPHALT DISTRIBUTOR SPRAYING PHALT
PLATE COMPACTOR
Grave Bedding 8.00 cu.m./hr. 0.125 hr/m³
Concrete Vibrator:
Vibrating Concrete 40.00 cu.m./hr. 0.025 hr/m³
MANPOWER:
MATERIALS:
Clearing & Grubbing Lot Grading (Cut & Fill) m3 Trench Excavation
300 30 m3/hr
232.55 m3/hr
232.55 m3/hr
384.62 m3/hr
303.03 m3/hr
769.23 m3/hr
xcavation Disposal of Unsuitable Materials m3-km Road way Excavation (m3)
29.41 m3/hr
125.00 m3/hr
125.00 m3/hr
Embankment/Imported Backfill (m3) Subgrade Preparation (m2)
65.00 MT/hr
32.50 MT/hr
300 SQ.M.
Asphalt Cutback MC Grade 70 MT
Asphalt prime coat, SS-1 (.042 drum/mt) drums