You are on page 1of 3

6.

0 MONITORING AND CONTROLLING THE PROJECT

Monitoring is the collection, recording, and reporting information about the project
while controlling uses this information to bring actual performance into agreement
with the plan.

EQUIPMENT CONSEQUENCES MONITOR CONTROL

Reformer 1. Overheat 1. Monitor the 1. Tune the


temperature so that temperature
(R-100)
it not exceed 900oC controller every
2. Over pressure one hour

2. Monitor the
pressure so that it 2. Tune the
not exceed the pressure controller
medium allowable every time it
pressure which is exceed 18 bar.
18 bar.

Separator There still residual of Monitor the flow of Tune the flow
water which is not water and syngas controller.
(V-100)
separated completely entering the
from the syngas separator
content.

Absorber 1. Low absorption of Monitor the flow of Tune the flow


CO2 CO2 controller that it not
(T-100)
exceed the
expected CO2
2. Concentration out absorption.
Reactor 1. Overheat 1. Monitor the 1. Tune the
temperature so that temperature
(R-101)
it not exceed 200oC controller every
2. Over pressure time the alarm
signal indicate
2. Monitor the change in
3. Concentration out pressure so that it temperature.
not exceed 50 bar

2. Tune the
3. Monitor the flow pressure controller
of stream 17. every time the
pressure alarm
signal detect
change in pressure.

3. Tune the flow


controller so that it
not exceed the flow
level in the reactor.

Distillation 1. purification 1. Monitor the flow 1. Tune the flow


column concentration out of stream 21 controller so that it
not exceed the flow
(T-101)
level in DC.
2. Overheat 2. Monitor the
boiling point of top
and bottom product 2. Tune the
3. Over pressure of DC which is temperature
197.3oC and controller every
246.2oC time the
respectively. temperature alarm
detect changes in
3. Monitor the temperature.
pressure of DC so
that it not exceed
57 bar. 3. Tune the
pressure controller
every time the
pressure alarm
detect changes in
pressure.