PROYEK JALAN TOL RUAS BAKAUHENI - TERBANGGI BESAR PAKET 4 METRO - TERBANGGI BESAR (STA

JOINT INSPECTION
CALCULATION SHEET

Item Pekerjaan : Solid Sodding


Lokasi : Sisi Kiri Sta. 127+321 - 128+440
Tanggal :

JUMLAH TALI AIR


TINGGI LERENG
No. STA JARAK TINGGI LERENG LUASAN (m2)
RATA2
(lebar = 30 cm)
a b c d = (1+2)/2 e = (1+2)*b/2 f

1 127+321.0 13.8
9.0 13.8 124.2 3
2 127+330.0 13.8

1 127+450.0 12.1
25.0 12.55 313.75 5
2 127+475.0 13
25.0 13 325 5
3 127+500.0 13
25.0 12.5 312.5 5
4 127+525.0 12
11.0 11.65 128.15 3
5 127+536.0 11.3

1 127+590.0 10.4
7.0 10.4 72.8 1
2 127+597.0 10.4

1 128+025.0 6
25.0 8.6 215 5
2 128+050.0 11.2
34.0 11.8 401.2 7
3 128+084.0 12.4

1 128+175.0 9.3
25.0 9.2 230 5
2 128+200.0 9.1
25.0 9.4 235 5
3 128+225.0 9.7
19.0 10.15 192.85 4
PROYEK JALAN TOL RUAS BAKAUHENI - TERBANGGI BESAR PAKET 4 METRO - TERBANGGI BESAR (STA

JOINT INSPECTION
CALCULATION SHEET

Item Pekerjaan : Solid Sodding


Lokasi : Sisi Kiri Sta. 127+321 - 128+440
Tanggal :

4 128+244.0 10.6

1 128+400.0 10.8
25.0 10.6 265 5
2 128+425.0 10.4
15.0 10.45 156.75 3
3 128+440.0 10.5

TOTAL 2,972.20

Luasan Brutto Solid Sodding = 2,972.20 m2


Luasan Tali Air = 186.17 m2
Luasan Rumput Rusak = - m2
Luasan Netto = 2,786.04 m2

DIKETAHUI OLEH, DIPERIKSA OLEH,


OWNER KONSULTAN SUPERVISI
PT. HUTAMA KARYA PT. MULTI PHI BETA

.............................................................. ..............................................................
GI BESAR PAKET 4 METRO - TERBANGGI BESAR (STA 109+000 - STA 140+938)
KONTRAKTOR PELAKSANA :
PT. WIJAYA KARYA (Persero) Tbk.

JOINT INSPECTION KONSULTAN SUPERVISI :


CALCULATION SHEET PT. MULTI PHI BETA

LUASAN TALI
LUASAN SPOT
AIR JUMLAH SPOT
RUMPUT RUSAK
RUMPUT RUSAK
(m2)
(m2)
g = d*f h i = d*h

12.42 0 0

18.825 0 0

19.5 0 0

18.75 0 0

10.485 0 0

3.12 0 0

12.9 0 0

24.78 0 0

13.8 0 0

14.1 0 0

12.18 0 0
GI BESAR PAKET 4 METRO - TERBANGGI BESAR (STA 109+000 - STA 140+938)
KONTRAKTOR PELAKSANA :
PT. WIJAYA KARYA (Persero) Tbk.

JOINT INSPECTION KONSULTAN SUPERVISI :


CALCULATION SHEET PT. MULTI PHI BETA

15.9 0 0

9.405 0 0

186.17 -

DIBUAT OLEH,
KONTRAKTOR PELAKSANA
PT. WIJAYA KARYA (Persero) Tbk

..............................................................
PROYEK JALAN TOL RUAS BAKAUHENI - TERBANGGI BESAR PAKET 4 METRO - TERBANGGI BESAR (STA

OPNAME MANDOR
CALCULATION SHEET

Item Pekerjaan : Solid Sodding


Lokasi : Sisi Kanan Sta. 127+536 - 128+210
Tanggal : 4-Dec-18

JUMLAH TALI AIR


TINGGI LERENG
No. STA JARAK TINGGI LERENG LUASAN (m2)
RATA2
(lebar = 30 cm)
a b c d = (1+2)/2 e = (1+2)*b/2 f

1 128+140.0 12.1
20.0 11.8 236 4
2 128+160.0 11.5
25.0 11.65 291.25 5
3 128+185.0 11.8
25.0 12.55 313.75 5
4 128+210.0 13.3

1 128+025.0 9.6
13.0 9.6 124.8 5
2 128+038.0 9.6

1 127+425.0 14.5
25.0 15.45 386.25 5
2 127+450.0 16.4
25.0 17.3 432.5 5
3 127+475.0 18.2
25.0 17.9 447.5 5
4 127+500.0 17.6

1 127+386.0 12.8
25.0 12.8 320 2
2 127+411.0 12.8
25.0 7.3 182.5 5
3 127+436.0 1.8
25.0 1.8 45 5
4 127+461.0 1.8
25.0 1.8 45 5
5 127+486.0 1.8
25.0 1.8 45 5
6 127+511.0 1.8
25.0 1.8 45 5
PROYEK JALAN TOL RUAS BAKAUHENI - TERBANGGI BESAR PAKET 4 METRO - TERBANGGI BESAR (STA

OPNAME MANDOR
CALCULATION SHEET

Item Pekerjaan : Solid Sodding


Lokasi : Sisi Kanan Sta. 127+536 - 128+210
Tanggal : 4-Dec-18

7 127+536.0 1.8
4.0 1.8 7.2 5
8 127+540.0 1.8

TOTAL 2,921.75

Luasan Brutto Solid Sodding = 2,921.75 m2


Luasan Tali Air = 172.97 m2
Luasan Rumput Rusak = - m2
Luasan Netto = 2,748.79 m2

DIKETAHUI OLEH, DIPERIKSA OLEH,


OWNER KONSULTAN SUPERVISI
PT. HUTAMA KARYA PT. MULTI PHI BETA

.............................................................. ..............................................................
GI BESAR PAKET 4 METRO - TERBANGGI BESAR (STA 109+000 - STA 140+938)
KONTRAKTOR PELAKSANA :
PT. WIJAYA KARYA (Persero) Tbk.

OPNAME MANDOR
KONSULTAN SUPERVISI :
CALCULATION SHEET PT. MULTI PHI BETA

LUASAN TALI
LUASAN SPOT
AIR JUMLAH SPOT
RUMPUT RUSAK
RUMPUT RUSAK
(m2)
(m2)
g = d*f h i = d*h

14.16 0 0

17.475 0 0

18.825 0 0

14.4 0 0

23.175 0 0

25.95 0 0

26.85 0 0

7.68 0 0

10.95 0 0

2.7 0 0

2.7 0 0

2.7 0 0

2.7 0 0
GI BESAR PAKET 4 METRO - TERBANGGI BESAR (STA 109+000 - STA 140+938)
KONTRAKTOR PELAKSANA :
PT. WIJAYA KARYA (Persero) Tbk.

OPNAME MANDOR
KONSULTAN SUPERVISI :
CALCULATION SHEET PT. MULTI PHI BETA

2.7 0 0

172.97 -

DIBUAT OLEH,
KONTRAKTOR PELAKSANA
PT. WIJAYA KARYA (Persero) Tbk

..............................................................