Additional Corrective Action Plan of NCR MP-8-NCR-9-01

Location: 50mw GSPL Date: 27/09/2019


Subject: Action plan of suggested additional controls by
Siemens (dated: 13-9-2019) to Nepcon in response to
observations raised in NCR.

Additional Corrective
control Action Further Target
Sr. suggested Taken remarks status date
1 Two more lights Two more closed closed
should be needed to lights had
install so that incase been installed
of failure there should
be alternate lights.
2 All night activities Night EHS officer continues continues
should be performed activities are presence is
after being added in made
inspection/permission daily permits mandatory
of EHSQ team. and inspection and inspection
checklist will will be done by
be filled EHS
representative
before starting
of activity
3 Weekly meeting It is decided Documents closed continues
should be arranged. every Friday will be shared
weekly
meeting will
be conducted.
4 Fortnight safety walks One already Documents Closed continues
should be arranged have done will be shared
with top leadership of fortnight
(PM and HSE Head). safety walks
Next will be on
30-9-19
5 Give awareness to Awareness Documents Closed Continues
security staff by has been will be shared
arranging trainings given to
and toolbox talk for guards
them This will be in
routine
6 More Search lights 2 search light More will be closed closed
should be provided to are arrange arranged
security staff so that for security
every other security guards and
guard is supplied with one search
lights. light is arrange
in spare
7 Proper gate to be Gate is built closed closed
built fulfilling all
security protocols as
per contract
agreement.

8 Arrange fuel tank to Only needed closed closed


required limit. fuel is being
Fuel tank should be purchased and
filled in proper time. being used on
Contractor need to site according
submit timesheet of to the need
filling fuel tank.

9 PTW to be arranged Permits are Documents closed closed


at the site being issued will be shared
on daily basis
10 Fuel should be stored in Designated closed Closed
proper designated area. hazardous area
has been built
PICTORIAL EVIDENCE

Observation No 01 1st Spare light installed Observation No 01 2nd Spare light installed

Observation No 02 Night work checklist


Observation No 05 Training to security team Observation No 06 Torch lights for security
guards with spare torch

Observation No 07 Gate has built Observation No 08 Designated hazardous area has


been set
Observation No 9 PTW Implement on site Observation No 10 Designated hazardous area has
been set