Road Work (Strip Chart) - Widening & Improvement

Input
Project Type Rigid/Flexible Output
Chainage(Start Value) 531/934 Length Completed
Total Length (km) 3.667 Workfront Available
Least Count 0.1 Workfront Unavailable
Additional land requirement

LHS - Slip Road Const.


LHS - Slip Road Work Front
PQC/BC
DLC/DBM
LHS MCW

GSB
Subgrade
Embankment
C&G
Other Encumbrances
LHS MCW
Workfront

Clearance Pending
LA Pending
Workfront Available
531.934
532.034
532.134
532.234
532.334
532.434
532.534
532.634
532.734
532.834
532.934
533.034
533.134
533.234
533.334
533.434
533.534
533.634
Chainage :

Workfront Available
RHS MCW
Workfront

LA Pending
Clearance Pending
Other Encumbrances
C&G
Embankment
RHS MCW

Subgrade
GSB
DLC/DBM
PQC/BC
RHS - Slip Road Workfront
RHS - Slip Road Const.
Bypass
Status of Structure Physical Progress of 66.53% achieved till Septemb
Number of Structure
1.585 km of Spine segment Launched (32 spa
0.400 km of Rib segment Launched (8 spans
Type of Structure
0.175 km of Ramp segment Launched (5 Span
0.990 km along LHS,0.500 km along RHS PQC com
Legends
Not Started(Blank)
Work In Progress(WIP)
0.00 Completed(COM)
3.367
Nil Workfront Available
1.61 ha Workfront Unavailable
533.734
533.834
533.934
534.034
534.134
534.234
534.334
534.434
534.534
534.634
534.734
534.834
534.934
535.034
535.134
535.234
535.334
535.434
535.534
535.600

% achieved till September 2019

ment Launched (32 spans)


ment Launched (8 spans)
ment Launched (5 Spans)
km along RHS PQC completed.