You are on page 1of 37

PILLS EXPRESS PHARMACY

WAREHOUSE INVENTORY SYSTEM

A Project Submitted to the Faculty of


The Bachelor of Science in Accountancy and
Business Computer Application Department
College of Business Administration
Silliman University
Dumaguete City

In Partial
Fulfillment of the Requirements
For the Course CISB 41 Accounting Information Systems

By

Banagodos, Daverah M.
Cabading, Irish R.
Cabanag, Lelit R.
Catacutan, Angel Faith Q.
Primicias, Carla Marie F.
Tabanao, Jamaica B.
Villegas, Alyanna Kylie A.

October 2019
SILLIMAN UNIVERSITY
2

TABLE OF CONTENTS
Page
TITLE PAGE i
ACKNOWLEDGEMENT
TABLE OF CONTENT ii
LIST OF TABLES
LIST OF FIGURES

CHAPTER I ORGANIZATIONAL BACKGROUND ........................................................ 4

1.0. Historical Perspective ......................................................................................... 4

1.0.1. Organizational Background ........................................................................... 4

1.0.2. Organizational Units ....................................................................................... 5

1.0.3. Job Functions ................................................................................................ 5

1.1. Objectives of the project ..................................................................................... 7

1.2. Scope and Limitation of the Project .................................................................... 8

CHAPTER II PROJECT MANAGEMENT AND FEASIBILITY .................................... 10

2.0. Systems Development Life Cycle (SDLC) .......................................................... 10

2.1. Time Management .............................................................................................. 15

2.2. Feasibility Study.................................................................................................. 16

2.2.1. Technical Feasibility ..................................................................................... 16

2.2.2. Economic Feasibility .................................................................................... 16

2.2.3. Organizational Feasibility ............................................................................. 16

2.3. System’s Budget Proposal .................................................................................. 17

CHAPTER III THE PROPOSED SYSTEM ................................................................... 20

3.0. Diagram .............................................................................................................. 20

3.1.0. Entity Relationship Diagram (ERD) .............................................................. 20

3.2.0. Program Flowchart ....................................................................................... 21


3

3.3.0. Data Dictionary............................................................................................. 28

3.1. Forms ................................................................................................................. 31

CHAPTER IV SUMMARY, CONCLUSION & RECOMMENDATION............................ 33

4.0. Summary ............................................................................................................ 33

4.1. Conclusion .......................................................................................................... 34

4.2. Recommendation................................................................................................ 35

CHAPTER V APPENDIX AND REFERENCES ........................................................... 36

APPENDIX ................................................................................................................ 36

REFERENCES .......................................................................................................... 36
4

CHAPTER I ORGANIZATIONAL BACKGROUND

1.0. Historical Perspective


1.0.1. Organizational Background

As a conscious effort to be of help to the community, Pills Express


Pharmacy was established at Brgy. Poblacion 3, Perdices St., Dumaguete City,
Negros Oriental. It mainly serves as an investment for the owner’s retirement fund
as she envisions the business to be a source of income after retirement. The mode
of acquiring the business was through a take-over from a previously bankrupt
owner. The new owner and manager, Mrs. Nenita R. Pacana, took the opportunity
to continue operating the business in May 2013. Also, since her daughter is a nurse
and her daughter-in-law is a doctor, she was more driven to invest in this kind of
venture.

The pharmacy was established for the following purposes:


 Ensure the safe, effective, and affordable use and dispensing of drugs,
 Make drugs and medicines available to the community, and
 As time evolved, to develop and manage drug distribution systems that
provide access points to consumers that assure drug safety and compliance
with legal and professional standards

Through the years, Pills Express Pharmacy continues to sell safe and
affordable drugs to its customers. It also provides services like blood sugar level
test. The business is conveniently located in the center of the city next to a gasoline
station where customers frequently pass by. Customers riding motorcycles, may
opt to stay in their vehicles and stop by near the window store when buying
medicines or other products, given that there are only a few customers during that
time. What makes this pharmacy more engaging to customers is that it opens at
7:00 in the morning and closes at 11:00 PM unlike any other pharmacies who
5

closes earlier. Moreover, the pharmacy also boasts of affordable prices for their
quality medicines that resulted to many loyal customers along the years.

1.0.2. Organizational Units

Figure 1 Pills Express Pharmacy’s Organizational Chart Description

The owner/manager holds the highest position in the pharmacy. She sets
the overall direction and operations of the business. Directly under her are the
registered pharmacist, senior and assistant pharmacists, bookkeeper and
technician. The registered pharmacist also helps in supervising two senior
assistant pharmacists, who have been working with the pharmacy for several years
and three other assistant pharmacists, who are new to the business.

1.0.3. Job Functions

An organizational chart visually depicts the relationship of different


personnel in an organization. This aids in segregating their specific responsibilities
for the achievement of the organization’s objectives. Just like other businesses,
6

Pills Express Pharmacy are composed of individuals tasked with different


responsibilities but overall, works together as one.

A. Owner/Manager
The owner/manager generally oversees and supervises a company’s
activities and employees. She is responsible for the planning, organization,
direction, control and review of the day-to-day operations and major functions
of the business.

B. Registered Pharmacist
Pharmacists supply prescribed and over-the-counter medicines to the
general public in the pharmacy and give advice to customers on the safe use of
medicines and possible effects. She is the main person to refer to when
prescriptions are being provided by customers. The distinguishing factor of a
registered pharmacist to the other types of pharmacists in the pharmacy is that
she has the license to practice pharmacy.

C. Senior Assistant Pharmacist


The senior assistant pharmacist has the same general role as any pharmacist
which is to dispense medicines to and provide advices regarding medicines to
customers. An additional qualification is that she has worked several years with
the pharmacy. In the case of this business, the senior assistant pharmacist
serves as the cashier. He/she is also in charge of overseeing the new assistant
pharmacists.

D. Assistant Pharmacist
An assistant pharmacist also supplies medicines to customers. In addition,
he/she records drugs delivered to the pharmacy, store incoming merchandise
and inform the manager of stock needs.
7

E. Bookkeeper
The bookkeeper records financial transactions and generates reports from
those information. The recording of transactions include posting information to
accounting journals or accounting software as well as general ledgers from such
source documents as invoices to customers, cash receipts, and supplier
invoices. The bookkeeper also reconciles accounts to ensure their accuracy.

F. Technician
A technician is responsible for the maintenance and repair of the accounting
system used in the pharmacy. He ensures that the system in the business is
functioning properly and troubleshoots if there are occurrence of several
computer issues.

1.1. Objectives of the project

This project aims to develop a computerized accounting system in place of the


current manual system used by Pills Express Pharmacy in the warehouse to monitor
different aspects of the business especially in taking and monitoring of inventory.

Specifically, this study aims to address the following challenges and purposes:

a. Inventory are stored in in the warehouse will be monitored accurately and


objectively.
b. Since information is centralized, monitoring will be easier, and stocks can be
refilled in a timely manner.
c. Products can be directly traced with their suppliers and shippers.
d. The system will be able to trace invoices of medicines with near expiration dates
in order to be stocked out.
e. Billing purchase orders will be matched with their suppliers and shippers.
8

Figure 2: Pill Express Pharmacy’s Location


Barangay. Poblacion 3, Perdices St., Dumaguete City, 6200 Negros Oriental

1.2. Scope and Limitation of the Project

This inventory system is exclusively designed for the management personnel of


Pills Express Pharmacy. This system will lessen the work of those in charge of
maintaining inventory levels because all information will be stored directly into a database.
The owner would be able to access the information they need anytime.

Scope of the Project

The system can do the following tasks and/or has the following features:
● The system is password protected.
● It can view all the lists of employees, products, suppliers, and shippers.
● It can add, update, and delete certain records.
● It can keep track of purchase order records.
● It can monitor warehouse inventory level.
● It will be able to match products with suppliers and shippers.
9

Limitation of the Project

On the other hand, the system is subject to the following limitations:


● The system is limited within the company’s purchase order billing and
warehouse inventory.
● Access to the system is limited only to authorized individuals.
● The system cannot be viewed online.
10

CHAPTER II PROJECT MANAGEMENT AND FEASIBILITY

2.0. Systems Development Life Cycle (SDLC)

Systems Development Life Cycle (SDLC) is the overall process of developing


information systems through a multi-step process from investigation of initial
requirements through analysis, design, implementation and maintenance. There are
many different models and methodologies, but each generally consists of a series
of defined steps or stages. The Systems Development Life Cycle (SDLC) is a
conceptual model used in project management that describes the stages involved
in an information system development project from an initial feasibility study through
maintenance of the completed application. Various SDLC methodologies have been
developed to guide the processes involved including the waterfall model (the original
SDLC method), rapid application development (RAD), joint application development
(JAD), the fountain model and the spiral model. Mostly, several models are
combined into some sort of hybrid methodology.

In general, an SDLC methodology follows the following steps:

1. The existing system is evaluated. Deficiencies are identified. This can be done by
interviewing users of the system and consulting with support personnel.
2. The new system requirements are defined. In particular, the deficiencies in the
existing system must be addressed with specific proposals for improvement.
3. The proposed system is designed. Plans are laid out concerning the physical
construction, hardware, operating systems, programming, communications, and
security issues.
4. The new system is developed. The new components and programs must be
obtained and installed. Users of the system must be trained in its use, and all aspects
of performance must be tested. If necessary, adjustments must be made at this
stage.
11

5. The system is put into use. This can be done in various ways. The new system
can phased in, according to application or location, and the old system gradually
replaced. In some cases, it may be more cost-effective to shut down the old system
and implement the new system all at once.
6. Once the new system is up and running for a while, it should be exhaustively
evaluated. Maintenance must be kept up rigorously at all times. Users of the system
should be kept up to date concerning the latest modifications and procedures.

Phase 1: Project Identification and Selection


The first phase of SDLC is project identification and selection. In this phase, an
organization’s total information system needs are identified, analyzed, prioritized
and arranged. Someone identifies the need for a new or enhanced system. Project
identification and selection consists of three primary activities:
a. Identifying potential development projects
b. Classifying and ranking projects
c. Selecting projects for development

Phase 2: Project Initiation and Planning


In project initiation and planning phase a potential information systems project is
explained and an argument for continuing or not continuing with the project is
presented and a detailed plan is also developed for conducting the remaining phases
of SDLC for proposed system. Two major activities are in this phase are investigation
of the system problem or opportunity and the reasons why the system should or
should not be developed by the organizations. The scope of the proposed system is
determined in this phase.

Elements of project planning are:


 Describe the Project Scope, Alternatives and Feasibility
 Dividing the Project into Manageable Tasks
 Estimating Resources and Creating a Resource Plan
 Developing a Preliminary Schedule
12

 Developing a Communication Plan


 Determining Project Standards and Procedures
 Identifying and Assessing Risk
 Creating a Preliminary Budget
 Developing a Statement of Work
 Setting a Baseline Project Plan

Phase 3: Analysis
In analysis phase the current system is studied and alternative replacement systems
are proposed. Analysis phase have several sub phases. The first is requirements
determination. Methods for determining requirements are:
 Interviewing and Listening
 Directly observing Users
 Analyzing Procedures and other Documents
 Joint Application Design
 Using Prototype Identifying
 Processes to Reengineer

Then according to the requirement structure the system in context of their


interrelationship and eliminate redundancies. Third, generate the alternative initial
designs to match the requirements. Then, from the alternatives determine the best
solution that meet requirement properly and the cost, labor and technical levels of
the organization is willing to commit to the development process. The output of the
analysis phase is the alternative solution of the existing system.

Phase 4: Design
In the design phase description of the recommended solution is converted into
logical and then physical system specifications. Design focuses on high level design
like, what programs are needed and how are they going to interact, low-level design
(how the individual programs are going to work), interface design (what are the
interfaces going to look like) and data design (what data will be required). During
13

these phases, the software's overall structure is defined. Analysis and Design are
very crucial in the whole development cycle. Any glitch in the design phase could be
very expensive to solve in the later stage of the software development. Much care
is taken during this phase. The logical system of the product is developed in this
phase.

Design phase has two parts: logical design and physical design. Logical design is
the part of the design phase in which all functional features of the system chosen for
development in analysis are described independently of any computer platform.
Physical design is the logical specifications of the system from logical design are
transformed into technology-specific details from which all programming and system
construction can be accomplished.

Design phase highlighted on:


 Files and Databases
 Forms and Reports
 Dialogues and Interfaces
 System and Program Structure
 Distributed Systems

Phase 5: Implementation
In implementation phase information system is coded, tested, installed and
supported the organization. In this phase the designs are translated into code.
Computer programs are written using a conventional programming language or an
application generator. Programming tools like Compilers, Interpreters, and
Debuggers are used to generate the code. Different high level programming
languages like C, C++, Pascal, Java are used for coding. With respect to the type of
application, the right programming language is chosen. Implementation activities
also include initial use support such as finalization of documentation, training
programs and ongoing user assistance. Elements of implementation phase are:
 Coding
14

 Testing
 Installation
 Documentation
 Training
 Support

Phase 6: Maintenance
In the maintenance phase information system is systematically repaired and
improved. After implementation users faces some problems about how the system
works and often think of better ways to perform its function. So modification or
change is needed. Software will definitely undergo change once it is delivered to the
customer. There are many reasons for the change. Change could happen because
of some unexpected input values into the system. In addition, the changes in the
system could directly affect the software operations. The software should be
developed to accommodate changes that could happen during the post
implementation period. Major activities that occur in maintenance phase are:
 Obtaining Maintenance Requests
 Transforming Requests into Changes
 Design Changes
 Implementing changes

There are several types of maintenance. Corrective maintenance refers to changes


made to repair defects in design, coding and implementation of the system. Adaptive
maintenance involves making changes to an information system to evolve its
functionality to changing business needs or technologies. Perfective maintenance
involves making enhancements to improve processing performance, interface
usability, and add desire requirements and features. Preventive maintenance
changes the system to reduce the chance of future system failure.
15

2.1. Time Management


The schedule for the development of the project is shown in the Gantt chart. The
different activities, date started and finished, assigned people, duration, and progress was
monitored through it.
16

2.2. Feasibility Study

2.2.1. Technical Feasibility

The computerized system serves to assist the establishment in their conduct


of business and increase the efficiency of daily operations. Employees and owners
of the establishment are computer literate thus learning and using the system would
not be difficult.

The researchers believe they are qualified to make this system because they
are equipped with the right knowledge to do so. They are well versed in accounting
and trained in using different programming languages and database management
systems. This knowledge serves as the primary premise in making this functional
system.

2.2.2. Economic Feasibility

The inventory system is not for sale and the establishment can avail its
services for free. However, the group has created an estimate of the total cost of the
system if they were to charge for the services.

Since the establishment has a laptop that has an Intel I5 processor, the
establishment need not purchase any new computer to accommodate the inventory
system hence, will not need to spend to purchase any hardware. Therefore, the
pharmacy will not spend much on this system. From an economic perspective, this
project has low risk.

2.2.3. Organizational Feasibility

The establishment shows an interest in this system. Currently, their


warehouse is monitored manually hence, they strongly support the group in
17

developing the system. For the pharmacy to cope up with the demands of their
business, they expect that this system can increase the efficiency of their work.

2.3. System’s Budget Proposal

A project budget is the estimated financial plan for a project, for which funding is
required. The budget is an important component of a proposal, as it represents a financial
picture of the project. The recommended hardware specifications for the projects include
the basic computer paraphernalia such as monitor, CPU, RAM, Hard disk, & motherboard
to purchase a new one to replace the manual system of the warehouse.

COST PROFORMA FOR THE PROPOSED COMPUTERIZED SYSTEM

DEVELOPMENT COST
Personnel:
1 Systems Analyst ( 88 hours @ P 50/hour) P4,400
1 Programmer ( 200 hours @ P 30/hour) 6,000
1 Designer ( 34 hours @ P
30/hour) 1,020

Computer
Usage:
322 hours @ P 20 6,440

Supplies and Expenses:


Training Users ( 40 hours @ 50/hour) 2,000
Office Supplies (paper, printing, etc.) 300
TOTAL DEVELOPMENT COSTS P20,160
18

INVESTMENT COSTS
Computer Paraphernalia:
1 Monitor (Dell 20”) P 2,300
1 CPU (Dell 990 i5-2400 3.1Ghz 8GB RAM 250GB) 6,990
1 AVR (Prolink UPS with AVR) 1,357
1 Keyboard and 1 Mouse (A4TECH) 475
TOTAL DEVELOPMENT COSTS P11,122

ANNUAL OPERATING COSTS


Personnel:
1 Systems Analyst (maintenance – 40 hours/year @ P 50/hour) P4,000
1 Programmers (maintenance – 100 hours/year @ P 30/hour) 6,000

Computer Usage:
1500 hours/year @ P 20/hour 30,000

Supplies and Expenses:


Office Supplies (paper, printing, etc.) 5,000
Preprinted Forms 1,800
ANNUAL OPERATING COST P46, 800

TOTAL COMPUTERIZED SYSTEM COST P78,082

COST RECOVERY SCHEME

The researchers have not identified any current system in the establishment that
serves the same purpose as the proposed system. Thus, under the cost recovery
scheme, the establishment does not recognize any cost savings related to this proposed
19

system. However, the system’s total cost should be noted for the system to be effectively
put in use.
20

CHAPTER III THE PROPOSED SYSTEM


3.0. Diagram
3.1.0. Entity Relationship Diagram (ERD)

Figure 3 Entity Relationship Diagram of Pills Express Pharmacy


21

3.2.0. Program Flowchart

Figure 4 Main Menu Flowchart


22
Figure 5 Employees Flowchart
23
Figure 6 Products Flowchart
24
Figure 7 Purchase Order Flowchart
25

Figure 8 Purchase Order Details Flowchart


26
Figure 9 Suppliers Flowchart
27
Figure 10 Shippers Flowchart
28

3.3.0. Data Dictionary

Data Field
Field Name Constraint Description
Type Length

Primary Corresponding ID Number


ID Int 20
Key of the employee

Employee_LastName Varchar 50 Null Last name of the employee

Employee_FirstName Varchar 50 Null First name of the employee

20
Employee_Position Varchar Null Position of the employee

Employee_Address Varchar 100 Null Address of the employee

Employee_Birthdate Date Null Birthdate of the employee

20 Contact number of the


Employee_ContactNo Varchar Null
employee

E-mail address of the


Employee_Email Varchar 100 Null
employee

Password Varchar 20 Null Password of the employee

Table 1 Employee Data Dictionary

Data Field
Field Name Constraint Description
Type Length

Primary Corresponding ID
ID Int 20
Key Number of the product

Product_Name Varchar 50 Null Name of the product

Unit of measurement of
Unit_of_Measurement Varchar 20 Null
the product

Quantity Int 20 Quantity of the product

The unit price of the


Unit_Price Decimal 19,4
product

Manufacturing_Date Datetime Null The manufacturing date


29

of the product

The expiration date of


Expiration_Date Datetime Null
the product

Corresponding ID
Employee_ID Int 20 Null
Number of the employee

Corresponding ID
Supplier_ID Int 20 Null Number of the supplier
of the product

Table 2 Product Data Dictionary

Data Field
Field Name Constraint Description
Type Length

Primary The corresponding ID number


ID Int 20
Key of the order

Purchase_Date Datetime Null The date purchased

Date of payment on the


Payment_Date Datetime Null
purchase

Payment_Type Varchar 20 Null Type of payment

The foreign key on the


Employee_ID Int 20 Null
employee table

The foreign key on the


Supplier_ID Int 20 Null
supplier table

The foreign key on the


Shipper_ID Int 20 Null
shipper table

Status Varchar 100 Null Status of the order

Table 3 Purchase Order Data Dictionary

Field Name Data Field Constraint Description


Type Length

ID Int 20 Primary Key The ID number of the order


details
30

OrderID Int 20 Null The foreign key on the order


table

ProductID Int 20 Null The foreign key on the


product table

Quantity Int 20 Null The quantity of the purchase


ordered

Unit_Price Decimal 19,4 Null The unit price of the ordered


item

Date_Received Datetime Null The date the purchase order


was received

Table 4 Purchase Order Details Data Dictionary

Field Name Data Field Constraint Description


Type Length

ID Int 20 Primary Key The ID number of the shipper

Shipper_Name Varchar 50 Null Name of the shipper

Address Varchar 20 Null Adress of the shipper

Phone_Number Varchar 20 Null Number of the shipper

Notes Varbinary 50 Null Notes on the shipper

Table 5 Shipper Data Dictionary

Field Name Data Type Field Constraint Description


Length

ID Int 20 Primary The ID number of the


Key supplier

Supplier_Name Varchar 50 Null Name of the supplier

Business_Phone Int 50 Null Number of the supplier

Address Varchar 100 Null Address of the supplier

Notes Varchar 100 Null Notes from the supplier


31

Table 6 Supplier Data Dictionary

3.1. Forms

A. Info Form
This form is the opening page of the system, where the information about Pills
Express Pharmacy establishment is shown. This contains a login button that will lead
to the next form for a user to sign in.

B. Sign-in Form
This form allows the user to access the system after proper authorization. A user
is required to input his/her username and password. To add, delete, or update the
user’s authorization username and password, an attribute named password is
included in the table employee to automatically add/delete an account of the new/old
employee. Upon logging in, the login button will lead to the Main Form.

C. Main Form
This form shows the different options that the user can go to. The following forms
the user can access through the Main Form are the Employee, Product, Purchase
Order, Supplier and Shipper Forms. The form also shows the current time and date
on when the user will access the system. This is also where the user can log out from
the system.

D. Employee Form
This form shows the list of employees of the pharmacy from the registered
pharmacist down to the junior pharmacist. This form also shows the option of the user
to either add, delete or update information on the employee. Lastly, the user can also
easily search for the employee that he/she is looking for through the search box by
either typing the first or last name of the individual.

a. Add Employee Form


32

This form allows the user to add new employee information to the system. The
data that will be required of the user are the employee ID, first and last name,
position, birthdate, contact number and email of the employee.
b. Delete Employee Form
This form allows the user to delete the entire information of the employee in the
system.
c. Update Employee Form
This form allows the user to update existing information of the employee in the
system.

E. Product Form
a. Add Product Form
This form allows the user to add products in the system.
b. Update Product Form
This form allows the user to update the existing products in the system.
c. Stock In Form
This form allows the user to input the products delivered to update the latest
inventory available.
e. Stock Out Form
This form allows the user to monitor and effect the transfer of inventory from the
warehouse to the pharmacy.

G. Purchase Order Form


This form allows management to order products from the suppliers. Supplier
details, order details, product details and billing details are also shown here. This
form connects different queries in order to form a purchase order invoice.

H. Shipper Form
a. Add Shipper Form
This form allows the user to add new shippers in the system.
b. Update Shipper Form
33

This form allows the user to update the existing shipper details in the system.

I. Supplier Form
a. Add Supplier Form
This form allows the user to add suppliers in the system.
b. Update Supplier Form
This form allows the user to update the existing supplier records in the system.

CHAPTER IV SUMMARY, CONCLUSION & RECOMMENDATION


4.0. Summary

Before the proposed project, the establishment only manually monitored different
aspects of the business including the taking and monitoring of inventories. As a delivery
is received, part of it is stored in the warehouse and the others are stored in the pharmacy.
Every day, the owner is to bring stocks of inventory into the pharmacy and when inventory
runs low before the next day, an in-charge pharmacist is to message the owner to bring
more stocks.

This proved to be impractical considering that employees need to perpetually


monitor the inventory stock to inform the owner right away and prevent stockouts. This
presents a greater risk, especially in cases of failure to stock needed medicines and losing
customers in the process.

Other aspects like employees, purchase orders, supplier, and shipper are also not
monitored. Like any other small establishments, the knowledge of the owner about these
things are considered enough. This then leads to the information being concentrated on
only one individual. Thus, there is always a need to consult the owner for queries about
such matters.
34

With these current deficiencies, the researchers found an opportunity of improving


the business practices of the establishment to improve efficiency and ultimately increase
profits. This is by way of developing the computerized system for them.

This computerized system is the first in the establishment that will be used to
harmonize the different aspects of the business in a single platform. These aspects
include the employees, products, inventory, purchase orders, supplier, and shipper. This
will ensure better monitoring of these aspects and more efficient business processes.

This proposed system was made with the establishment's current deficiencies in
mind. If in the future, new practices and aspects of the business are added, it would be in
the best interest of the establishment to have the system modified according to additional
needs.

The process in building this system started with the identification of the proponent
and the deficiency in their current business practices. Data obtained were then analyzed
to determine how to approach the problem and relevant systems were studied. An ERD
was then initially drafted to identify the relationships of the different components to each
other and as the project progresses, the ERD was revised as needed. The structure of
the program was then formulated, and the SQL entities and attributes were created. The
Delphi programming followed. This took most of the time of the project since this includes
a lot of revisions after the initial programming. The final step in the process is testing the
system with the proponents. This is to determine the sufficiency and appropriateness of
the system to the business.

4.1. Conclusion

Today’s world is very much focused on technology and making use of technology
to provide the best advantage. Even for businesses, technology can be very helpful. This
is where software development comes in.
35

Software development is the process of creating and maintaining applications and


frameworks to increase a business’s productivity. This is done by way of reducing costs,
increasing business flexibility, giving the company a competitive advantage and
increasing company value thereby increasing the overall quality of the business. Commented [1]: PLEASE CHECK IF MU DEFINE
PATA UG SOFTWARE DEVELOPMENT :)

A product of this process is a software powered by an information system. The


information system is used to keep track of different aspects of the business and the
software permits the facilitation of different kinds of transactions. This system improves
business efficiency leading to increase in profits and ultimately the success of a business. Commented [2]: -please check rapud

The proponent strongly supports the group in developing the system. Since the
establishment is currently running their business in manual, Pills Express Pharmacy
shows a lot of interest in the system. In conclusion, this project would be effective since
it will help the establishment cope up with the demands of their business and to make it
easier for them to track inventory.

4.2. Recommendation

The group recommends further development of the proposed system.


Development is recommended with regards to technology wherein online viewing of the
system by authorized individuals is effectuated and to be made compatible to
smartphones for easy access. The group also recommends the business to improve the
system’s process flows in the different aspects.
36

CHAPTER V APPENDIX AND REFERENCES


APPENDIX
REFERENCES

CV

NAME: Lelit R. Cabanag


E-mail: lelitrcabanag@su.edu.ph
Contact No.: 09059157540
Address: 840 Quezon St., Bais City, Negros Oriental

PERSONAL BACKGROUND
Date of Birth: January 29, 1997
Age: 22
Gender: Female
Civil Status: Single
Nationality: Filipino
Languages: Cebuano, Tagalog and English

SUMMARY
A continuous learner who loves reading and learning from experience. Always ready for
change.
ACADEMIC BACKGROUND

AFFILIATION

SKILLS
37

You might also like