Project: RENOVATION

Owners: Mr. and Mrs.


Location: Binangonan, Rizal

CONSTRUCTION OF GROUND FLOOR

DESCRIPTION Qty. Unit TOTAL AMOUNT

I. Excavation
Excavation for footings, tie beams, etc. 11.00 cu.m.
SUBTOTAL 2,706.99
II. Form works
Form Lumber Coco ( 2" x 2" x 8') 10.00 pcs
Ordinary Plywood (0.00625m x 1.4m x 2.44m) 5.00 pcs
Hardiflex 3.00 pcs
#2 1/2 Common Wire Nails 4.00 kg.
#1 Finishing Nails 2.00 kg.
SUBTOTAL 6,000.00
III. Conrete
Portland Cement 150.00 bags
White Sand 12.00 cu.m.
Gravel 3/4" 11.00 cu.m.
SUBTOTAL 60,400.00
IV. Masonry
Concrete Hollow Blocks
CHB, 4" Tck 280.00 pcs
SUBTOTAL 4,200.00
V. Reinforcements
10 mm Dia - Def. Reinforcement Bars 20.00 pcs.
12 mm Dia - Def. Reinforcement Bars 20.00 pcs.
16 mm Dia - Def. Reinforcement Bars 7.00 pcs.
Hardwares 1.00
SUBTOTAL 13,000.00
VI. Tinsmithry
GA 26 G.I. Box Gutter 2.00 pcs.
GA 26 G.I. Center Cappin 2.00 pcs.
GA 26 G.I. Rib Type Roofing 6.00 pcs.
Angle Bar 8.00 pcs.
Hardwares 1.00 lot
SUBTOTAL 17,420.00
VII. Door, Windors and Hardwares
Swing Type Door with Door Jamb, D-2 1.00 set
Door Locks (Schlage or Equivalent) 2.00 pcs
Hinge (50mm x 101mm) 4.00 pcs
SUBTOTAL 3,828.00
VIII. Plumbing Pipes, FIttings and Fixtures
Bronze Faucets(12.7mm D) 2.00 pcs
4" x 4" Floor Drain, Stainless 1.00 pcs
Gate Valve 12 mm Dia 1.00 pcs
PVC Pipe 3" 2.00 pcs
PVC Wye 3" 2.00 pcs
PVC Elbow 3" 4.00 pcs
PVC Solvent Cement 1.00 can
1/2" PVC Pipe 2.00 pcs
1/2" PVC Coupling 2.00 pcs
1/2" PVC Elbow 3.00 pcs
1/2" PVC Tee 2.00 pcs
Teflon Tape 1.00 rolls
SUBTOTAL 3,634.00
IX. Electrical
20 mm Dia. Flexible Hose 20.00 mts
Electrical Tape 1.00 rolls
2.0 mm2 THHN (Stranded) 20.00 meter
Junction Box (Deep Type) w/ Cover 2.00 pcs
Utility Box (Deep Type) 2.00 pcs
Double Gang 2.00 set
Convinience Outlet (Duplex) 2.00 set
SUBTOTAL 1,361.00
X. Painting
Semi Gloss Latex Paint 5.00 L
Flat Wall 4.00 L
Q.D.E. White (Boysen) 2.00 L
Hardwares 1.00 lot
SUBTOTAL 6,670.00
TOTAL COST FOR CONSTRUCTION MATERIAL 119,219.99

Prepared by:
DATE: