Doc. No.
MI/01
Material Inspection Procedure Rev. No. 0.0
Eff. Date 10/1/2018
TITLE Quality control
Page
Supplier
Incoming Material
IQC
IQC Inspection
Inspection
YES NO
Accept
or
reject
Production Line
Material Rejection Report
Store Room Send back to supplier
Prepared By Approved By