You are on page 1of 4

2LL/2LJ/2LH

(5) Detaching and refitting the operation PWB

Procedure
1. Pull the paper conveying unit out.
2. Remove the screw from the right upper Right upper cover
cover.

Paper
conveying
unit

Screw

Figure 1-5-94

3. Open the front cover.


4. Remove the screw and then remove the
fan cover.
5. Unhook three hooks and then remove
Hooks
the front upper right cover.

Front right
upper cover

Fan cover
Screw

Figure 1-5-95

1-5-58
2LL/2LJ/2LH

6. Remove the screw and then remove the Screw


operation panel cover.

Operation panel cover

Operation panel cover

Figure 1-5-96

7. Remove two screws and then remove


the USB wire (connector).

Screws

USB wire
(connector)

Figure 1-5-97

1-5-59
2LL/2LJ/2LH

8. Remove four screws.

Screws

Screws

Figure 1-5-98

9. Pull the operation panel unit upward. Operation panel unit


10. Release two wire saddles.
11. Remove four connectors from the oper-
ation PWB.
12. Remove the wire holder.
13. Remove the operation panel unit.

Operation PWB
Connectors

Connector
Operation
panel unit
Wire
Connector saddles
Wire holder

Figure 1-5-99

1-5-60
2LL/2LJ/2LH

14. Remove four connectors and two FFC


from the operation PWB.

*: When removing the FFC from the FFC FFC


connector with a lock, remove the FFC Operation PWB
after released by lifting up the lock lever FFC connector
(see page 1-5-48). with a lock

Connectors

FFC
Connectors

Figure 1-5-100

15. Remove four screws and then remove


the operation PWB.
Screws Operation PWB
16. Check or replace the operation PWB
and refit all the removed parts.
Screw

Screw

Figure 1-5-101

1-5-61

You might also like