Utility Maintenance & Health

Utilities breakdowns kills the efficiance of factory to great extent

Preventive Maintenance Plans to avoid Breakdowns & action plans

Boiler:

1. ID Fan motor, have purchase (45K) one back up motor recentely to overcome from
unexpected breakdowns.
2. Mobri coil actuator replaced
3. Main IBR gate valave replaced
4. Regular periodic monthly maintenanace , tube cleaning, gasket replacement, etc etc
5. Boiler Gauge galass in stock
6. Blowdown valve in stock
7. NRVs & other items in stock

Compressors:

1. 2000 hours service kits, Thermostat kits, belts, blower fans, unloading valave kits, other
consumable items in stock

Diesel Generators:

1. New batteries replaced last 1 week back, 4 nos


2. A, B, C check on periodic basis
3. FOC work of 400KVA Dgs
4. Service kits all type in stock

LT, Transformer Power:

1. All panel board service on periodic basis, spring loaded charger, MCBS, other items in stock
to avoid breakdowns..