Professional Documents
Culture Documents
Chiller Checklist
Chiller Checklist
HVAC System
CHILLERS
Project :
Date : Ambient Temp, °F:
a- General :
1- Unit No :
2- Location :
3- Serial Number :
4- Model Number :
5- Type :
6- Voltage :
7- Amperage :
EVAPORATOR
8- Inlet Temperature , ° F: Δt
9- Outlet Temperature, ° F : 0
10- Inlet Pressure, psi : Δp
11- Outlet pressure, psi : 0
Design Actual
12- Water flow, gpm :
CONDENSER
13- No. Of Condenser Fans
14- Ambient temperature db/wb, ° F : /
Design Actual
15- Airflow, cfm :
Compressors comp 1 comp 2 comp 3
16- Suction pressure
17- Condenser pressure
18- Oil pressure / temperature
19- Stages :
20- Voltage
21- Amperage :
22- KW input
23- Low pressure cutout
24- High pressure cutout
NOTES :
Name Signature
10/28/2019
General 1
13:29:16
Khorais Road Project - Riyadh
Saudi Diyar Consultants
b- Check List :
NOTES :
10/28/2019
Checklist 2
13:29:16
Khorais Road Project - Riyadh
Saudi Diyar Consultants
c- Electrical Checklist
d- Control Checklist
NOTES :
10/28/2019
Electrical&Control 3
13:29:16
Khorais Road Project - Riyadh
Saudi Diyar Consultants
e- LOG SHEET :
Fans running
Amperage
Amperage
Amperage
Amperage
Amperage
Amperage
Voltage
Discharge
Discharge
Discharge
Discharge
Temp. out
Temp. in
Time¹
Suction
Suction
Suction
Suction
Δp, psi
Stages
Stages
Stages
Stages
Δt, °F
10/28/2019
Log sheet 4
13:29:16
Khorais Road Project - Riyadh
Saudi Diyar Consultants
f- Secondary Chilled Water Pumps & Make up water pumps Check List :
5 Chemical dosing set installation between suction and discharge found not found
6 Thermometer installation at suction and discharge sides found not found
7 - Pressure gauge installation at suction and discharge sides found not found
8 - Pressure sensors calibration done not done
8 - ChW pumps alignment ok not ok
9 Flexible connection at both suction and discharge sides found not found
### - Supporting system good bad
11 Pipe insulation and cladding good bad
### - Pipes identification found not found
### - Electrical connections good bad
### - Connection to BMS done not done
### - Sequence of operation programming done not done
### - Change over unit installation inside control panel found not found
### - VFD powered (wired to controlled equipment) ok not ok
### - VFD interlocked to control system ok not ok
### - Pressure sensor properly located and calibrated ok not ok
### - Drive location not subject to excessive temperature ok not ok
VFD
NOTES :
Name Signature Date
10/28/2019
Ch.WP checklist 5
13:29:16
Khorais Road Project - Riyadh
Saudi Diyar Consultants
10/28/2019
Ch.WP checklist 6
13:29:16
Khorais Road Project - Riyadh
Saudi Diyar Consultants
g- Electrical Checklist
h- Control Checklist
NOTES :
10/28/2019
Electrical Checklist 7
13:29:16
Khorais Road Project - Riyadh
Saudi Diyar Consultants
NOTES :
10/28/2019
Data for Primary Pumps 8
13:29:16
Khorais Road Project - Riyadh
Saudi Diyar Consultants
AMPS.
Suction, psi
Discharge, psi
Head, Ft 0 0 0 0
GPM
DRV position
VOLTAGE
AMPS.
Suction, psi
Discharge, psi
Head, Ft 0 0 0 0
GPM
DRV position
Design Actual
Minimum flow required
Summer
NOTES :
10/28/2019
Data for Secondary Pumps 9
13:29:16