7.

Vent of the Analyzer Shelter shall be part


of BIDDER scope.
No Redundancy? 8. Any required lighting for Analyzer Shelter
shall be provided.

1. Solenoid in XV shall be loop


powered from GMS Panel.

2. This Power Distribution JB is


for both USM only.

6. Two solenoids & Two


Limit Switches for each
valves.

& Total & Total


Sulfur Sulfur

3. Only one feeder (UPS) provided for Analyzer Shelter. BIDDER shall provide Power
Distribution Board for all equipment & auxiliaries in the Analyzer Shelter.
4. All analyzer shall be able to be read from all Flow Computers.
5. Each Analyzer shall have dedicated Sampling Conditioning System.